WO2006126920A1 - Uplink scheduling in a mobile telecommunication network - Google Patents

Uplink scheduling in a mobile telecommunication network Download PDF

Info

Publication number
WO2006126920A1
WO2006126920A1 PCT/SE2005/000786 SE2005000786W WO2006126920A1 WO 2006126920 A1 WO2006126920 A1 WO 2006126920A1 SE 2005000786 W SE2005000786 W SE 2005000786W WO 2006126920 A1 WO2006126920 A1 WO 2006126920A1
Authority
WO
WIPO (PCT)
Prior art keywords
scheduling
data transfer
uplink
uplink data
node
Prior art date
Application number
PCT/SE2005/000786
Other languages
French (fr)
Inventor
Joakim BERGSTRÖM
Johan Torsner
Original Assignee
Telefonaktiebolaget Lm Ericsson (Publ)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Telefonaktiebolaget Lm Ericsson (Publ) filed Critical Telefonaktiebolaget Lm Ericsson (Publ)
Priority to PCT/SE2005/000786 priority Critical patent/WO2006126920A1/en
Priority to EP05748730.8A priority patent/EP1884037B1/en
Priority to US11/921,039 priority patent/US8005481B2/en
Publication of WO2006126920A1 publication Critical patent/WO2006126920A1/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • H04W72/23Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/36TPC using constraints in the total amount of available transmission power with a discrete range or set of values, e.g. step size, ramping or offsets
    • H04W52/367Power values between minimum and maximum limits, e.g. dynamic range
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows

Definitions

  • the present invention relates to a method and arrangements in a mobile telecommunication network.
  • the present invention relates to a
  • the WCDMA standard is extended with the Enhanced Uplink concept - the Enhanced Dedicated Transport Channel, E-DCH.
  • E-DCH Enhanced Uplink
  • a further description can be found in 3GPP TS 25.309 "FDD Enhanced Uplink; Overall description”.
  • This concept introduces considerably higher peak data-rates in the WCDMA uplink.
  • Features introduced with E-DCH include fast scheduling and fast hybrid ARQ with soft combining, both of these features are located in the Node B.
  • HARQ is a more advanced form of an ARQ retransmission scheme. In conventional ARQ schemes the receiver checks if a packet is received correctly. If it is not received correctly, the erroneous packet is discarded and a retransmission is requested. With HARQ the erroneous packet is not discarded.
  • Fast scheduling means that the Node B can indicate to each UE the rate the UE is allowed to transmit with. This can be done every TTI, i.e. fast. Thus, the network is able to control the interference in the system very well.
  • HS-DSCH High Speed Downlink Shared Channel
  • 3GPP TS 25.308 Ultra High Speed Downlink Packet Access
  • Stage 2 the scheduling is also located in the Node B.
  • the scheduling is rather straight forward since the Node B scheduler has full knowledge of the data that needs to be transmitted in downlink. Based on the amount of data available for different UEs, the priority of the data and the radio channel quality which is indicated by the
  • the scheduler determines which data that should be transmitted to each UE.
  • CQI Channel Quality Indicator
  • the Node B scheduler has no direct information about the data that is to be transmitted from the UEs.
  • the UEs are required to indicate the amount of data available, the priority of the data, the transmitter power available etc. to the Node B through scheduling requests.
  • the Node B transmits an absolute grant (AG), also denoted scheduling grant indicator herein, to the UE, indicating the amount of data or actually with which power the UE is allowed to transmit.
  • AG absolute grant
  • the UE Before an uplink data burst can be transmitted, the UE must first transmit a scheduling request to the Node B, to inform the Node B that data is available for transmission. First after a reception of the AG from the Node B the data burst can be transmitted.
  • AG absolute grant
  • this procedure causes a delay in the beginning of a data transfer and potentially for each bust that is transmitted in uplink, depending on how long the absolute grant is valid.
  • the delay caused by scheduling can partly be avoided by either using non- scheduled transmissions or issuing permanent absolute grants to all UEs.
  • the non scheduled transmissions imply that the network configures a certain rate statistically that the UE is allowed to use instantaneously without sending a scheduling request.
  • the drawback of this solution is that the configured rate must be rather high in order to support all possible traffic scenarios and may therefore require a large hardware allocation in the network and cause high interference.
  • to permanently issue an absolute grant it is possible to quickly change the value of the grant or remove the grant if the load of the network increases.
  • this other solution has the drawback that the network does not know which users that really need the permanent grant and the risk is therefore that the perofrmance of the uplink data transmission is impacted. Accordingly, it would be desired to avoid said delay and at the same time avoid the drawbacks mentioned above.
  • the Node B makes it possible to improve application performance.
  • the Node B comprises a downlink data scheduler (202) and an uplink data scheduler (204), and means (203) for transferring information associated with a downlink data transfer from said downlink data scheduler (202) to said uplink data scheduler (204).
  • the uplink data scheduler comprises means for scheduling an uplink data transfer as a result of the transmission of said downlink data transfer.
  • the method according to the present invention makes it possible to improve application performance.
  • the method comprises the steps ofrtransferring information associated with a downlink data transfer from said downlink data scheduler to said uplink data scheduler, and-scheduling an uplink data transfer as a result of the transmission of said downlink data transfer.
  • the uplink transfer is a response of the downlink data transfer.
  • the uplink transfer is a response of said downlink data transfer, i.e. the response may be a response message such as TCP ACKs, RLC ACKs and RRC response messages.
  • TCP ACKs in unlink if no header comnression is used. It should be noted that for applications using TCP the first request for data is transmitted in uplink and that request will not benefit from this invention. However, once the TCP data transfer has started, the data is transmitted in bursts separated by some time (in the slow start phase). Each of these bursts will benefit from the invention and the total time to e.g. download a file will thus be decreased.

Abstract

The present invention relates to a node B (200) comprising a downlink data scheduler (202) and an uplink data scheduler (204), wherein the node B comprises means (203) for transferring information associated with a downlink data transfer from said downlink data scheduler (202) to said uplink data scheduler (204), and that the uplink data scheduler comprises means for scheduling an uplink data transfer as a result of the transmission of said downlink data transfer.

Description

Uplink scheduling in a mobile telecommunication network
Field of the invention
The present invention relates to a method and arrangements in a mobile telecommunication network. In particular, the present invention relates to a
Node B that facilitates an improved performance for implemented applications in said network.
Background of the invention
The present invention relates to methods and arrangements in a Node B in a UMTS terrestrial radio access network (UTRAN). The UTRAN is illustrated in figure 1 and comprises at least one Radio Network System 100 connected to the Core Network (CN) 200. The CN is connectable to other networks such as the Internet, other mobile networks e.g. GSM systems and fixed telephony networks. The RNS 100 comprises at least one Radio Network Controller 110. Furthermore, the respective RNC 110 controls a plurality of
Node-Bs 120,130 that are connected to the RNC by means of the Iub interface 140. Each Node B covers one or more cells and is arranged to serve the User Equipment (UE) 300 within said cell. Finally, the UE 300, also referred to as mobile terminal, is connected to one or more Node Bs over the Wideband Code Division Multiple Access (WCDMA) based radio interface 150.
In 3GPP Release 6, the WCDMA standard is extended with the Enhanced Uplink concept - the Enhanced Dedicated Transport Channel, E-DCH. A further description can be found in 3GPP TS 25.309 "FDD Enhanced Uplink; Overall description". This concept introduces considerably higher peak data-rates in the WCDMA uplink. Features introduced with E-DCH include fast scheduling and fast hybrid ARQ with soft combining, both of these features are located in the Node B. HARQ is a more advanced form of an ARQ retransmission scheme. In conventional ARQ schemes the receiver checks if a packet is received correctly. If it is not received correctly, the erroneous packet is discarded and a retransmission is requested. With HARQ the erroneous packet is not discarded. Instead the packet is kept and combined with a result of the retransmission. That implies that even if both the first transmission and the retransmission are erroneous, they may be combined to a correct packet. This means that fewer retransmissions are required.
Fast scheduling means that the Node B can indicate to each UE the rate the UE is allowed to transmit with. This can be done every TTI, i.e. fast. Thus, the network is able to control the interference in the system very well.
In HS-DSCH (High Speed Downlink Shared Channel), that is described in 3GPP TS 25.308 "UTRA High Speed Downlink Packet Access (HSDPA);
Overall description; Stage 2, the scheduling is also located in the Node B. In HS-DSCH the scheduling is rather straight forward since the Node B scheduler has full knowledge of the data that needs to be transmitted in downlink. Based on the amount of data available for different UEs, the priority of the data and the radio channel quality which is indicated by the
UE through the Channel Quality Indicator (CQI) measurements, the scheduler determines which data that should be transmitted to each UE.
On E-DCH the situation is different. The Node B scheduler has no direct information about the data that is to be transmitted from the UEs. Thus the UEs are required to indicate the amount of data available, the priority of the data, the transmitter power available etc. to the Node B through scheduling requests. When the Node B has received the scheduling request from the UE and has decided to schedule the UE based on the received scheduling requests, it transmits an absolute grant (AG), also denoted scheduling grant indicator herein, to the UE, indicating the amount of data or actually with which power the UE is allowed to transmit. Before an uplink data burst can be transmitted, the UE must first transmit a scheduling request to the Node B, to inform the Node B that data is available for transmission. First after a reception of the AG from the Node B the data burst can be transmitted. Thus, this procedure causes a delay in the beginning of a data transfer and potentially for each bust that is transmitted in uplink, depending on how long the absolute grant is valid.
The delay caused by scheduling can partly be avoided by either using non- scheduled transmissions or issuing permanent absolute grants to all UEs. The non scheduled transmissions imply that the network configures a certain rate statistically that the UE is allowed to use instantaneously without sending a scheduling request. The drawback of this solution is that the configured rate must be rather high in order to support all possible traffic scenarios and may therefore require a large hardware allocation in the network and cause high interference. In the other solution, to permanently issue an absolute grant, it is possible to quickly change the value of the grant or remove the grant if the load of the network increases. However, this other solution has the drawback that the network does not know which users that really need the permanent grant and the risk is therefore that the perofrmance of the uplink data transmission is impacted. Accordingly, it would be desired to avoid said delay and at the same time avoid the drawbacks mentioned above.
Many applications mainly involve downlink data transfer, e.g. file download, video streaming, and web surfing. The downlink scheduling only impose a small delay unless the system load is very high. However, since most applications involve sending feedback messages in uplink such as Transfer Control Protocol (TCP) acknowledgements (ACK) and Radio Link Control (RLC) ACKs, the delay in uplink scheduling will affect the performance significantly of the downlink data traffic.
Summary of the invention
Thus, the objective problem is to improve application performance. The objective problem is solved by the Node B according to claim 1 and by the method of claim 11.
The Node B, according to the present invention, makes it possible to improve application performance. The Node B comprises a downlink data scheduler (202) and an uplink data scheduler (204), and means (203) for transferring information associated with a downlink data transfer from said downlink data scheduler (202) to said uplink data scheduler (204). Moreover, the uplink data scheduler comprises means for scheduling an uplink data transfer as a result of the transmission of said downlink data transfer.
The method according to the present invention, makes it possible to improve application performance. The method comprises the steps ofrtransferring information associated with a downlink data transfer from said downlink data scheduler to said uplink data scheduler, and-scheduling an uplink data transfer as a result of the transmission of said downlink data transfer.
According to an embodiment of the present invention, the uplink transfer is a response of the downlink data transfer.
According to a further embodiment of the present invention, the means for scheduling an uplink data transfer comprises means for transmitting a scheduling grant indicator indicating when and/ or how the UE is allowed to transmit uplink data. I.e. the scheduling grant indicator may comprise information about allowed transmit power for the UE and that the UE is allowed to transmit until further notice.
An advantage with the present invention is that it allows uplink response messages such as TCP ACKs, RLC ACKs and RRC response messages to be transmitted without scheduling delay, i.e. the scheduling request phase can be omitted. This will improve the performance for a large range of applications. Detailed Technical Description of the Invention
As stated above it would be desirable to be able to start an uplink transmission without performing a preceding scheduling request, in particular when the uplink transmission is a response of a previously transmitted downlink transmission.
That is achieved by the Node B of the present invention comprising a downlink data scheduler, an uplink data scheduler and means for transferring information associated with a downlink data from said downlink data scheduler to said uplink data scheduler. The uplink data scheduler comprises means for scheduling an uplink data transfer, as a result of the transmission of said downlink data transfer
According to the present invention, the scheduler for the downlink traffic is located in the same Node B as the scheduler for the uplink traffic. That is the case when the HS-DSCH serving Node B is the same as the E-DCH serving Node B. For HS-DSCH and E-DCH, the serving Node B is that Node
B that is adapted to schedule the UE. For HS-DSCH, the serving Node B also transmits data to the UE.
Thus, the basic idea of the present invention is that when the HS-DSCH scheduler schedules a data burst in downlink to a UE it informs the E-DCH uplink scheduler that the downlink data has been scheduled, or will be scheduled within a certain time period. When the E-DCH scheduler receives this indication it allocates a scheduling grant, also denoted absolute grant, for the UE for uplink resources. It is then possible for the UE to send response messages such as TCP ACKs, RLC ACKs, RRC response messages on the scheduled uplink resources. That would imply that the uplink response messages can be transmitted without a prior scheduling request phase, which results in a decreased delay.
According to a preferred embodiment, the uplink transfer is a response of said downlink data transfer, i.e. the response may be a response message such as TCP ACKs, RLC ACKs and RRC response messages.
The means for scheduling an uplink data transfer comprises according to embodiments of the present invention means for transmitting a scheduling channel adapted to schedule the uplink data transfer. The scheduling grant indicator indicates when and/or how the UE is allowed to transmit uplink data. The scheduling grant indicator may comprise information about allowed transmit power for the UE and that the UE is allowed to transmit until further notice. The scheduling grant indicator may also indicate that the UE is allowed to transmit during a specific time interval.
The scheduling grant indicator may be transmitted simultaneously as the transmission of said downlink data transfer.
According to embodiments of the present invention the scheduling grant indicator for the uplink scheduling is sent on the existing scheduling channel adapted to schedule the uplink, the enhanced Absolute Grant Channel (E-AGCH). However, the absolute grant indicator for the uplink may also be included in a downlink message transmitted together with the downlink data transmission, i.e. on the same channel e.g. on the HS-DSCH.
The E-DCH scheduler may allocate a fixed preconfigured uplink resource to a UE that already is scheduled in the downlink. If the UE needs to transmit uplink information, e.g. TCP ACK, RLC ACK, or a RRC response message, in response to the received downlink data, the absolute grant indicator allocates uplink resources for the uplink data within a rather short time period after the downlink data was received e.g. within 200 ms. After that time period has elapsed or after the first transmission in uplink, the scheduler can reduce the absolute grant to zero to free uplink resources for other UEs.
According to a further embodiment, the absolute grant allocated to the UE in uplink may depend on the amount of data, or the data rate used, in downlink. In a preferred embodiment the absolute grant allocated to the UE in uplink may depend on the amount of data, or the data rate used, in downlink in addition to the time aspect described above. As an example the amount of allocated uplink resources indicated by the absolute grant indicator may be proportional to the amount of downlink data, i.e. the amount of uplink data that is allowed to be transmitted is proportional to the amount of transmitted downlink data. Preferably, a rule for TCP applications is that roughly 1-3% of the downlink data rate is needed for
TCP ACKs in unlink if no header comnression is used. It should be noted that for applications using TCP the first request for data is transmitted in uplink and that request will not benefit from this invention. However, once the TCP data transfer has started, the data is transmitted in bursts separated by some time (in the slow start phase). Each of these bursts will benefit from the invention and the total time to e.g. download a file will thus be decreased.
In the drawings and specification, there have been disclosed typical preferred embodiments of the invention and, although specific terms are employed, they are used in a generic and descriptive sense only and not for purposes of limitation, the scope of the invention being set forth in the following claims.

Claims

1. A node B (200) comprising a downlink data scheduler (202) and an uplink data scheduler (204), characterised in that the node B comprises means (203) for transferring information associated with a downlink data transfer from said downlink data scheduler (202) to said uplink data scheduler (204), and that the uplink data scheduler comprises means for scheduling an uplink data transfer as a result of the transmission of said downlink data transfer.
2. The node B (200) according to claim 1, wherein the uplink transfer is a response of the downlink data transfer.
3. The node B (200) according to any of previous claims, wherein the means
(204) for scheduling an uplink data transfer comprises means for transmitting a scheduling grant indicator indicating when and/or how the UE is allowed to transmit uplink data
4. The node B (200) according to the previous claim, wherein the means
(204) for scheduling an uplink data transfer comprises means for transmitting a scheduling grant indicator simultaneously as the transmission of said downlink data transfer.
5. The node B (200) according to the previous claim, wherein the means
(204) for scheduling an uplink data transfer comprises means for transmitting a scheduling grant indicator included in a downlink message transmitted together with, i.e. on the same channel as, the downlink data transmission.
6. The node B (200) according to any of claims 1-3, wherein the means (204) for scheduling an uplink data transfer comprises means for transmitting a scheduling grant indicator on a downlink channel adapted to schedule the uplink data transfer.
7. The node B (200) according to the previous claim, wherein the downlink channel adapted to schedule the uplink is the enhanced Absolute Grant Channel.
8. The node B (200) according to any of the previous claims, wherein the means (204) for scheduling an uplink data transfer comprises means for scheduling the uplink data transfer within a predefined time period after the downlink data is received.
9. The node B (200) according to any of the previous claims, wherein the means (204) for scheduling an uplink data transfer comprises means for allocating an amount of uplink resources in relation to the amount of transmitted downlink data.
10. The node B (200) according to any of the previous claims, wherein the node B is implemented in a Universal Mobile Telephone System.
11. A method in a Node B comprising a downlink data scheduler (202) and an uplink data scheduler (204), characterised in that the method comprises the steps of:
-transferring information associated with a downlink data transfer from said downlink data scheduler (202) to said uplink data scheduler (204), and
-scheduling an uplink data transfer as a result of the transmission of said downlink data transfer.
12. The method according to claim 11, wherein the uplink transfer is a response of the downlink data transfer.
13. The method according to any of previous claims 11-12, wherein the step of scheduling an uplink data transfer comprises the further step of transmitting a scheduling grant indicator indicating when and/ or how the UE is allowed to transmit uplink data.
14. The method according to the previous claim, wherein the step of scheduling an uplink data transfer comprises the step of transmitting a scheduling grant indicator simultaneously as the transmission of said downlink data transfer.
15. The method according to the previous claim, wherein the step of scheduling an uplink data transfer comprises the step of transmitting a scheduling grant indicator included in a downlink message transmitted together with, i.e. on the same channel as, the downlink data transmission.
16. The method according to any of claims 11-13, wherein the step of scheduling an uplink data transfer comprises the step of transmitting a scheduling grant indicator on a downlink channel adapted to schedule the uplink data transfer.
17. The method according to the previous claim, wherein the downlink channel adapted to schedule the uplink is the enhanced Absolute Grant Channel.
18. The method according to any of the previous claims 11-17, wherein the step of scheduling an uplink data transfer comprises the step of scheduling the uplink data transfer within a predefined time period after the downlink data is received.
19. The method according to any of the previous claims 11-18, wherein the step of scheduling an uplink data transfer comprises the step of allocating an amount of uplink resources in relation to the amount of transmitted downlink data.
PCT/SE2005/000786 2005-05-26 2005-05-26 Uplink scheduling in a mobile telecommunication network WO2006126920A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
PCT/SE2005/000786 WO2006126920A1 (en) 2005-05-26 2005-05-26 Uplink scheduling in a mobile telecommunication network
EP05748730.8A EP1884037B1 (en) 2005-05-26 2005-05-26 Uplink scheduling in a mobile telecommunication network
US11/921,039 US8005481B2 (en) 2005-05-26 2005-05-26 Uplink scheduling in a mobile telecommunication network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/SE2005/000786 WO2006126920A1 (en) 2005-05-26 2005-05-26 Uplink scheduling in a mobile telecommunication network

Publications (1)

Publication Number Publication Date
WO2006126920A1 true WO2006126920A1 (en) 2006-11-30

Family

ID=37452256

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE2005/000786 WO2006126920A1 (en) 2005-05-26 2005-05-26 Uplink scheduling in a mobile telecommunication network

Country Status (3)

Country Link
US (1) US8005481B2 (en)
EP (1) EP1884037B1 (en)
WO (1) WO2006126920A1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009100756A1 (en) * 2008-02-12 2009-08-20 Telefonaktiebolaget Lm Ericsson (Publ) Allocation and priority handling of uplink and downlink resources
WO2009126078A1 (en) * 2008-04-10 2009-10-15 Telefonaktiebolaget L M Ericsson (Publ) Improved uplink scheduling in a cellular system
WO2009132699A1 (en) 2008-04-29 2009-11-05 Telefonaktiebolaget Lm Ericsson (Publ) Distribution of downlink e-dch power usage
EP2134133A1 (en) * 2008-06-09 2009-12-16 Nec Corporation Wireless communication system, base station, scheduling method, and program
WO2010089640A1 (en) * 2009-02-04 2010-08-12 Nokia Corporation Optimization of uplink resource grant procedure
CN102474754A (en) * 2007-08-13 2012-05-23 爱立信电话股份有限公司 Improved allocation of uplink resources
WO2015050480A1 (en) 2013-10-01 2015-04-09 Telefonaktiebolaget L M Ericsson (Publ) A network node, a base station for uplink grant pre-allocation
US9451548B2 (en) 2013-02-21 2016-09-20 Telefonaktiebolaget Lm Ericsson (Publ) Method, wireless device computer program and computer program product for use with discontinuous reception

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070025357A1 (en) * 2005-07-27 2007-02-01 Interdigital Technology Corporation Wireless communication method and apparatus for detecting and scheduling urgent data
US7613157B2 (en) * 2005-08-30 2009-11-03 Interdigital Technology Corporation Wireless communication method and apparatus for processing enhanced uplink scheduling grants
US8014359B2 (en) * 2006-10-27 2011-09-06 Interdigital Technology Corporation Method and apparatus for assigning radio resources and controlling transmission parameters on a random access channel
EP2213135B1 (en) * 2007-10-25 2019-07-17 InterDigital Patent Holdings, Inc. Control and transmission of uplink feedback information from a wtru in a cell_fach state
JP4833316B2 (en) * 2009-04-28 2011-12-07 株式会社エヌ・ティ・ティ・ドコモ Wireless base station
US10028302B2 (en) 2013-03-08 2018-07-17 Huawei Technologies Co., Ltd. System and method for uplink grant-free transmission scheme
CN105451345B (en) * 2016-01-18 2020-07-14 中磊电子(苏州)有限公司 Uplink authorization information sending method and base station
CN111670602B (en) * 2018-02-09 2022-10-28 华为技术有限公司 Data transmission method and related equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1096696A1 (en) * 1999-10-28 2001-05-02 Telefonaktiebolaget L M Ericsson (Publ) A method and apparatus for uplink scheduling
US6236646B1 (en) * 1997-09-09 2001-05-22 Telefonaktiebolaget Lm Ericsson (Publ) Packet data communications scheduling in a spread spectrum communications system
US6680922B1 (en) * 1998-07-10 2004-01-20 Malibu Networks, Inc. Method for the recognition and operation of virtual private networks (VPNs) over a wireless point to multi-point (PtMP) transmission system
US20040258026A1 (en) * 2003-06-19 2004-12-23 Lau Kin Nang Method of uplink scheduling for multiple antenna systems
US20050047360A1 (en) * 2003-04-03 2005-03-03 Love Robert T. Method and apparatus for scheduling asynchronous transmissions

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7463616B1 (en) * 2002-03-28 2008-12-09 Nortel Networks Limited Scheduling based on channel change indicia
US7145889B1 (en) * 2002-03-28 2006-12-05 Nortel Networks Limited Efficient frame retransmission in a wireless communication environment
KR101071816B1 (en) * 2004-04-02 2011-10-11 엘지전자 주식회사 Method of scheduling of uplink packet in mobile packet communication system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6236646B1 (en) * 1997-09-09 2001-05-22 Telefonaktiebolaget Lm Ericsson (Publ) Packet data communications scheduling in a spread spectrum communications system
US6680922B1 (en) * 1998-07-10 2004-01-20 Malibu Networks, Inc. Method for the recognition and operation of virtual private networks (VPNs) over a wireless point to multi-point (PtMP) transmission system
EP1096696A1 (en) * 1999-10-28 2001-05-02 Telefonaktiebolaget L M Ericsson (Publ) A method and apparatus for uplink scheduling
US20050047360A1 (en) * 2003-04-03 2005-03-03 Love Robert T. Method and apparatus for scheduling asynchronous transmissions
US20040258026A1 (en) * 2003-06-19 2004-12-23 Lau Kin Nang Method of uplink scheduling for multiple antenna systems

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102474754A (en) * 2007-08-13 2012-05-23 爱立信电话股份有限公司 Improved allocation of uplink resources
WO2009100756A1 (en) * 2008-02-12 2009-08-20 Telefonaktiebolaget Lm Ericsson (Publ) Allocation and priority handling of uplink and downlink resources
US8634840B2 (en) 2008-02-12 2014-01-21 Telefonaktiebolaget L M Ericsson (Publ) Allocation and priority handling of uplink and downlink resources
WO2009126078A1 (en) * 2008-04-10 2009-10-15 Telefonaktiebolaget L M Ericsson (Publ) Improved uplink scheduling in a cellular system
EP2373099A1 (en) 2008-04-29 2011-10-05 Telefonaktiebolaget L M Ericsson (Publ) Distribution of downlink E-DCH power usage
WO2009132699A1 (en) 2008-04-29 2009-11-05 Telefonaktiebolaget Lm Ericsson (Publ) Distribution of downlink e-dch power usage
EP2134133A1 (en) * 2008-06-09 2009-12-16 Nec Corporation Wireless communication system, base station, scheduling method, and program
US8594055B2 (en) 2008-06-09 2013-11-26 Nec Corporation Wireless communication system, base station, scheduling method, and program
US7917137B2 (en) 2009-02-04 2011-03-29 Nokia Corporation Optimization of uplink resource grant procedure and apparatus
WO2010089640A1 (en) * 2009-02-04 2010-08-12 Nokia Corporation Optimization of uplink resource grant procedure
US9451548B2 (en) 2013-02-21 2016-09-20 Telefonaktiebolaget Lm Ericsson (Publ) Method, wireless device computer program and computer program product for use with discontinuous reception
WO2015050480A1 (en) 2013-10-01 2015-04-09 Telefonaktiebolaget L M Ericsson (Publ) A network node, a base station for uplink grant pre-allocation
EP3053395A4 (en) * 2013-10-01 2016-10-12 Ericsson Telefon Ab L M A network node, a base station for uplink grant pre-allocation
US10219289B2 (en) 2013-10-01 2019-02-26 Telefonaktiebolaget Lm Ericsson (Publ) Network node, a base station for uplink grant pre-allocation

Also Published As

Publication number Publication date
US8005481B2 (en) 2011-08-23
EP1884037A1 (en) 2008-02-06
EP1884037B1 (en) 2016-08-17
US20090143071A1 (en) 2009-06-04

Similar Documents

Publication Publication Date Title
EP1884037B1 (en) Uplink scheduling in a mobile telecommunication network
US11723066B2 (en) Method and apparatus for performing contention-based access in a mobile communication system
US20180123740A1 (en) Autonomous transmission for extended coverage
JP4944212B2 (en) (H) ARQ for semi-persistent scheduling
US8259752B2 (en) Medium access control layer architecture for supporting enhanced uplink
TWI533639B (en) Method and system for providing control information for supporting high speed downlink and uplink
EP3386263B1 (en) Enhanced random access procedure for mobile communications
RU2559201C2 (en) Transmission power control for physical random access channels
EP3358890B1 (en) Transmit power control for physical random access channels
EP1737262B1 (en) Method and mobile station for a transmission request with added uplink data
EP1886522B1 (en) Signalling scheduling assitance data in a cellular communication system
EP1852994A1 (en) Method and apparatus for performing HARQ of a packet in a mobile communication system
EP2437565A1 (en) Method and communication device for assigning scheduling grant
US20080270866A1 (en) Transmission with automatic repeat request process
KR20090122989A (en) Base station device for use in mobile communication system, user device and method
WO2008041089A2 (en) Adaptive scheme for lowering uplink control overhead
JP5632839B2 (en) Method for communicating in a network, secondary station and system therefor
JP2010213337A (en) Mobile communication system as well as communicating method in the same system, base station and mobile station

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 8327/DELNP/2007

Country of ref document: IN

REEP Request for entry into the european phase

Ref document number: 2005748730

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2005748730

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: RU

WWP Wipo information: published in national office

Ref document number: 2005748730

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 11921039

Country of ref document: US