WO2005062771A3 - System and method for supply chain management to allow intelligent shipment scheduling that accounts for shortages and delays - Google Patents

System and method for supply chain management to allow intelligent shipment scheduling that accounts for shortages and delays Download PDF

Info

Publication number
WO2005062771A3
WO2005062771A3 PCT/US2004/042311 US2004042311W WO2005062771A3 WO 2005062771 A3 WO2005062771 A3 WO 2005062771A3 US 2004042311 W US2004042311 W US 2004042311W WO 2005062771 A3 WO2005062771 A3 WO 2005062771A3
Authority
WO
WIPO (PCT)
Prior art keywords
accounts
supply chain
customer
shortages
delays
Prior art date
Application number
PCT/US2004/042311
Other languages
French (fr)
Other versions
WO2005062771A2 (en
Inventor
Sujit Kumar Saraf
Original Assignee
Valdero Corp
Sujit Kumar Saraf
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Valdero Corp, Sujit Kumar Saraf filed Critical Valdero Corp
Publication of WO2005062771A2 publication Critical patent/WO2005062771A2/en
Publication of WO2005062771A3 publication Critical patent/WO2005062771A3/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Abstract

A system is provided configured to manage supply chain information according to detailed supply criteria over a broad time line. The system includes a prioritization module configured to prioritize customer product orders according to an supply and demand matching algorithm for calculating predetermined customer criteria and business policy, wherein the algorithm accounts for predetermined relative priorities based on historical customer information including past, current and projected customer product demand. The system further includes an assembly planning module configured to establish a unit assembly schedule according to scheduled availability of sub-units.
PCT/US2004/042311 2003-12-19 2004-12-15 System and method for supply chain management to allow intelligent shipment scheduling that accounts for shortages and delays WO2005062771A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US53140103P 2003-12-19 2003-12-19
US60/531,401 2003-12-19

Publications (2)

Publication Number Publication Date
WO2005062771A2 WO2005062771A2 (en) 2005-07-14
WO2005062771A3 true WO2005062771A3 (en) 2005-09-29

Family

ID=34738647

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2004/042311 WO2005062771A2 (en) 2003-12-19 2004-12-15 System and method for supply chain management to allow intelligent shipment scheduling that accounts for shortages and delays

Country Status (1)

Country Link
WO (1) WO2005062771A2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8626327B2 (en) 2010-11-05 2014-01-07 The Coca-Cola Company System for optimizing drink blends
US8639374B2 (en) 2010-11-05 2014-01-28 The Coca-Cola Company Method, apparatus and system for regulating a product attribute profile
US11151496B2 (en) 2018-02-19 2021-10-19 Target Brands, Inc. Parallel lead time determinations in supply chain architecture
CN115660389B (en) * 2022-12-27 2023-09-15 惠州市金百泽电路科技有限公司 Automatic processing method and system for PCB engineering order

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5785329A (en) * 1997-07-28 1998-07-28 Stanley; Douglas G. Cart for draining oil and other liquids from a vehicle
US6151582A (en) * 1995-10-26 2000-11-21 Philips Electronics North America Corp. Decision support system for the management of an agile supply chain
US20020015663A1 (en) * 1989-09-21 2002-02-07 Andrew S. Goldstein Oral collection device and kit
US20020138124A1 (en) * 2001-02-20 2002-09-26 Helfer Jeffrey L. Electromagnetic interference immune tissue invasive system
US20020188499A1 (en) * 2000-10-27 2002-12-12 Manugistics, Inc. System and method for ensuring order fulfillment
US20030149631A1 (en) * 2001-12-27 2003-08-07 Manugistics, Inc. System and method for order planning with attribute based planning
US20030177050A1 (en) * 2001-12-27 2003-09-18 Manugistics, Inc. System and method for order group planning with attribute based planning
US20030200130A1 (en) * 2002-02-06 2003-10-23 Kall Jonathan J. Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020015663A1 (en) * 1989-09-21 2002-02-07 Andrew S. Goldstein Oral collection device and kit
US6151582A (en) * 1995-10-26 2000-11-21 Philips Electronics North America Corp. Decision support system for the management of an agile supply chain
US5785329A (en) * 1997-07-28 1998-07-28 Stanley; Douglas G. Cart for draining oil and other liquids from a vehicle
US20020188499A1 (en) * 2000-10-27 2002-12-12 Manugistics, Inc. System and method for ensuring order fulfillment
US20020138124A1 (en) * 2001-02-20 2002-09-26 Helfer Jeffrey L. Electromagnetic interference immune tissue invasive system
US20030149631A1 (en) * 2001-12-27 2003-08-07 Manugistics, Inc. System and method for order planning with attribute based planning
US20030177050A1 (en) * 2001-12-27 2003-09-18 Manugistics, Inc. System and method for order group planning with attribute based planning
US20030200130A1 (en) * 2002-02-06 2003-10-23 Kall Jonathan J. Suite of configurable supply chain infrastructure modules for deploying collaborative e-manufacturing solutions

Also Published As

Publication number Publication date
WO2005062771A2 (en) 2005-07-14

Similar Documents

Publication Publication Date Title
US8315901B2 (en) Systems and methods of automatically scheduling a workforce
US6591153B2 (en) System and methods for scheduling manufacturing resources
WO2003094410A2 (en) Scheduling and sequencing supply chain resources
WO2004102445A3 (en) Method and system for supply chain management employing a vizualization interface
Cattani et al. Inventory rationing and shipment flexibility alternatives for direct market firms
US20070270990A1 (en) System and process for supply management for the assembly of expensive products
US20070050069A1 (en) Constraint based order optimization system and available to promise system
WO2003014883A3 (en) Systems and methods for scheduling reoccurring deliveries and pickups
WO2002035437A1 (en) System and method for ensuring order fulfillment
US20110184773A1 (en) Method and System for Planning Paratransit Runs
KR20210014431A (en) System for determining orders ranking of Raw Materials using demand estimate and Method thereof
US20020103726A1 (en) Flexible ordering of inventory from material sources according to material requirements for manufacturing operations
WO2005062771A3 (en) System and method for supply chain management to allow intelligent shipment scheduling that accounts for shortages and delays
KR20210014432A (en) Method for accurate estimating demand of Raw Materials Using System for estimating demand of Raw Materials
WO2003025705A3 (en) Web-based demand chain management system and method
Quante Management of stochastic demand in make-to-stock manufacturing
Jalil Customer information driven after sales service management: lessons from spare parts logistics
Roy et al. The role of discrete event simulation techniques in finite capacity scheduling
Chakraborty et al. Attended home delivery in Indian public distribution system: an iterated local search approach
Breiter et al. Coordination in supply chain management-review and identification of directions for future research
Sirkiä et al. Adaptive finance and control: Combining lean, agile, and beyond budgeting for financial and organizational flexibility
Alizadeh et al. On modeling and marketing the demand flexibility of deferrable loads at the wholesale level
CN113570215A (en) Maintenance personnel management system
JP2005194073A (en) Goods shipping management system
Mula et al. Fuzzy material requirement planning

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
DPEN Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed from 20040101)
NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Country of ref document: DE

122 Ep: pct application non-entry in european phase
122 Ep: pct application non-entry in european phase