WO2002060235A3 - System and method for allocating the supply of critical material components and manufacturing capacity - Google Patents

System and method for allocating the supply of critical material components and manufacturing capacity Download PDF

Info

Publication number
WO2002060235A3
WO2002060235A3 PCT/US2002/002371 US0202371W WO02060235A3 WO 2002060235 A3 WO2002060235 A3 WO 2002060235A3 US 0202371 W US0202371 W US 0202371W WO 02060235 A3 WO02060235 A3 WO 02060235A3
Authority
WO
WIPO (PCT)
Prior art keywords
supply
planner
allocating
resource
production
Prior art date
Application number
PCT/US2002/002371
Other languages
French (fr)
Other versions
WO2002060235A2 (en
Inventor
Martin Horne
Original Assignee
Manugistics Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Manugistics Inc filed Critical Manugistics Inc
Priority to EP02707588A priority Critical patent/EP1364327A2/en
Priority to AU2002241987A priority patent/AU2002241987A1/en
Priority to JP2002560446A priority patent/JP2004537772A/en
Publication of WO2002060235A2 publication Critical patent/WO2002060235A2/en
Publication of WO2002060235A3 publication Critical patent/WO2002060235A3/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/40Minimising material used in manufacturing processes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention provides a system and method for allocating the supply of critical material planning decisions and allocating constrained materials. The synchronized allocations ensure that all necessary materials for production of a product are available in the appropriate time-phased allocation before beginning production to help ensure that production and materials are not wasted on products that cannot be completed. The supply system may include various combination of components including, a Supply Planner (200), a Resource Optimizer (300), a Constraint Based Master Planner (400), a Product Change Analyzer (500), a Comparer (600), a Resource Requirements Planner (700), a Finite Resource Planner (800), a Customer Promiser (900), and an Interactive Master Scheduler (1000). The core of the simulation process is the Supply Planner (100). Other components, such as the Resource Optimizer and the Comparer, then perform their analyses on the output of the Supply Planner.
PCT/US2002/002371 2001-01-29 2002-01-29 System and method for allocating the supply of critical material components and manufacturing capacity WO2002060235A2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP02707588A EP1364327A2 (en) 2001-01-29 2002-01-29 System and method for allocating the supply of critical material components and manufacturing capacity
AU2002241987A AU2002241987A1 (en) 2001-01-29 2002-01-29 System and method for allocating the supply of critical material components and manufacturing capacity
JP2002560446A JP2004537772A (en) 2001-01-29 2002-01-29 System and method for allocating supply of critical material components and manufacturing capacity

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US26432101P 2001-01-29 2001-01-29
US60/264,321 2001-01-29

Publications (2)

Publication Number Publication Date
WO2002060235A2 WO2002060235A2 (en) 2002-08-08
WO2002060235A3 true WO2002060235A3 (en) 2002-12-19

Family

ID=23005522

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2002/002371 WO2002060235A2 (en) 2001-01-29 2002-01-29 System and method for allocating the supply of critical material components and manufacturing capacity

Country Status (5)

Country Link
EP (1) EP1364327A2 (en)
JP (1) JP2004537772A (en)
AU (1) AU2002241987A1 (en)
TW (1) TW578071B (en)
WO (1) WO2002060235A2 (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW573270B (en) * 2002-09-13 2004-01-21 Asiatek Inc Multiple constrains planning and scheduling system
AU2002347755A1 (en) * 2002-11-07 2004-06-03 Singapore Institute Of Manufacturing Technology Method for estimating a lead time of a process
US6983190B2 (en) 2003-10-22 2006-01-03 International Business Machines Corporation Method for optimizing material substitutions within a supply chain
US20050187744A1 (en) * 2004-02-25 2005-08-25 Morrison James R. Systems and methods for automatically determining and/or inferring component end of life (EOL)
US7672921B1 (en) 2004-02-25 2010-03-02 Rockwell Automation Technologies, Inc. Systems and methods for automatically determining and/or inferring component end of life (EOL)
US8566181B2 (en) * 2004-03-31 2013-10-22 Jda Software Group, Inc. Incorporating a repair vendor into repair planning for supply chain
US8249952B2 (en) 2004-03-31 2012-08-21 Jda Software Group, Inc. Incorporating a repair vendor into repair planning for a supply chain
JP2006244470A (en) * 2005-02-01 2006-09-14 Hitachi Ltd Delivery date reply system, delivery date reply method, and delivery date reply program
JP5184128B2 (en) * 2008-02-13 2013-04-17 株式会社日立製作所 Product configuration information creation apparatus, program, and method
JP2012068929A (en) * 2010-09-24 2012-04-05 Hitachi Ltd Supply plan creation device, supply plan creation method and supply plan creation program
TWI419070B (en) * 2011-01-11 2013-12-11 Nat Univ Tsing Hua Relative variable selection system and selection method thereof
JP2012190155A (en) * 2011-03-09 2012-10-04 Toyota Motor Corp Material management apparatus and material management system
US10262297B1 (en) 2013-09-25 2019-04-16 Entercoms, Inc. Part chain management in an aftermarket services industry
JP6379425B2 (en) * 2014-10-24 2018-08-29 三菱重工エンジニアリング株式会社 BOM management system and BOM management method
CN105741183A (en) * 2014-12-09 2016-07-06 财团法人资讯工业策进会 Combination selecting method and system
US10782680B2 (en) * 2017-07-20 2020-09-22 Genral Electric Company Cumulative cost model for predicting asset maintenance cost from distress models
JP7228387B2 (en) * 2019-01-16 2023-02-24 株式会社日立製作所 Business plan creation support method and business plan creation support device
CN111489037B (en) * 2020-04-14 2023-04-18 青海绿能数据有限公司 New energy fan spare part storage strategy optimization method based on demand prediction
WO2022034719A1 (en) * 2020-08-12 2022-02-17 株式会社日立製作所 Supply–demand planning device and supply–demand planning method
CN112396290A (en) * 2020-09-29 2021-02-23 长安大学 MPS/MRP integrated planning method supporting bilateral fuzzy constraint

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630070A (en) * 1993-08-16 1997-05-13 International Business Machines Corporation Optimization of manufacturing resource planning
US6049742A (en) * 1997-09-26 2000-04-11 International Business Machines Corporation Projected supply planning matching assets with demand in microelectronics manufacturing
US6157915A (en) * 1998-08-07 2000-12-05 International Business Machines Corporation Method and apparatus for collaboratively managing supply chains
US6216109B1 (en) * 1994-10-11 2001-04-10 Peoplesoft, Inc. Iterative repair optimization with particular application to scheduling for integrated capacity and inventory planning
US6272389B1 (en) * 1998-02-13 2001-08-07 International Business Machines Corporation Method and system for capacity allocation in an assembly environment
US20020013721A1 (en) * 2000-05-22 2002-01-31 Alan Dabbiere System, method and apparatus for integrated supply chain management
US20020019761A1 (en) * 2000-01-12 2002-02-14 Derek Lidow Supply chain architecture
US20020049625A1 (en) * 2000-09-11 2002-04-25 Srinivas Kilambi Artificial intelligence manufacturing and design

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5630070A (en) * 1993-08-16 1997-05-13 International Business Machines Corporation Optimization of manufacturing resource planning
US6216109B1 (en) * 1994-10-11 2001-04-10 Peoplesoft, Inc. Iterative repair optimization with particular application to scheduling for integrated capacity and inventory planning
US6049742A (en) * 1997-09-26 2000-04-11 International Business Machines Corporation Projected supply planning matching assets with demand in microelectronics manufacturing
US6272389B1 (en) * 1998-02-13 2001-08-07 International Business Machines Corporation Method and system for capacity allocation in an assembly environment
US6157915A (en) * 1998-08-07 2000-12-05 International Business Machines Corporation Method and apparatus for collaboratively managing supply chains
US20020019761A1 (en) * 2000-01-12 2002-02-14 Derek Lidow Supply chain architecture
US20020013721A1 (en) * 2000-05-22 2002-01-31 Alan Dabbiere System, method and apparatus for integrated supply chain management
US20020049625A1 (en) * 2000-09-11 2002-04-25 Srinivas Kilambi Artificial intelligence manufacturing and design

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"Thru-put corporation delivers e-business versions of supply chain planning solution", MAPICS, INC. PRESS RELEASE, 1 September 2000 (2000-09-01), XP002954861, Retrieved from the Internet <URL:www.mapics.com/mediacenter/00release/pr-thruput51.asp> [retrieved on 20020612] *
FENG: "Manufacturing planning and execution software interfaces", JOURNAL OF MANUFACTURING SYSTEMS, vol. 19, no. 1, 2000, pages 1 - 17, XP002954862 *

Also Published As

Publication number Publication date
AU2002241987A1 (en) 2002-08-12
JP2004537772A (en) 2004-12-16
WO2002060235A2 (en) 2002-08-08
EP1364327A2 (en) 2003-11-26
TW578071B (en) 2004-03-01

Similar Documents

Publication Publication Date Title
WO2002060235A3 (en) System and method for allocating the supply of critical material components and manufacturing capacity
Pinto et al. A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
Rees et al. A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operation
WO2002005205A8 (en) Method and system for modeling biological systems
WO2003094107A3 (en) Constraint-based production planning and scheduling
CA2142484A1 (en) Integrated method and apparatus for selecting, ordering and manufacturing art glass panels
WO2003090042A3 (en) Systems and methods for facilitating negotiations for supply chain control
WO2000028451A3 (en) Automated finite capacity scheduler
CN107092981B (en) Comprehensive dispatching method for two cars processed in priority by closely connected process groups
EP1289204A3 (en) Apparatus and method of scheduling channel allocation in a dynamic TDMA frame
WO2004001633A3 (en) Method and system for simulating order processing processes, corresponding computer program product, and corresponding computer-readable storage medium
CN106408435A (en) Process compiling system and process compiling method
WO2003107148A3 (en) Process and system for designing molds and dies
CN105844436A (en) Customization manufacture method and system based on digital monitoring
TW200506678A (en) System and method of demand and capacity management, IC product and manufacturing method thereof, and IC product manufacturing management method
CN109542985A (en) A kind of general streaming Data Analysis Model and its construction method
Brockman et al. The Hercules CAD task management system
CN107832092A (en) Suitable for the software platform and processing method of individual demand
WO2003073231A3 (en) Networked services licensing system and method
WO2002003165A3 (en) System and method for web-based electronic buying system
CN106503162A (en) Page dynamic creation method and system based on SAP platforms
US20050216110A1 (en) System and method for fabrication backup planning
Kühnle et al. Integration of CAPP and PPC– Interfusion Manufacturing Management
WO2004092976A3 (en) System and method in a data table for exporting and importing recursive scalable templates
Petty et al. Conditions for the successful implementation of finite capacity/MRPII hybrid control systems

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A2

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG UZ VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A2

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
AK Designated states

Kind code of ref document: A3

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG UZ VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A3

Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2002560446

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 2002707588

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 2002707588

Country of ref document: EP

REG Reference to national code

Ref country code: DE

Ref legal event code: 8642

WWW Wipo information: withdrawn in national office

Ref document number: 2002707588

Country of ref document: EP