US3155160A - Recovery of heavy oils by steam extraction - Google Patents

Recovery of heavy oils by steam extraction Download PDF

Info

Publication number
US3155160A
US3155160A US855510A US85551059A US3155160A US 3155160 A US3155160 A US 3155160A US 855510 A US855510 A US 855510A US 85551059 A US85551059 A US 85551059A US 3155160 A US3155160 A US 3155160A
Authority
US
United States
Prior art keywords
well
stratum
pressure
oil
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US855510A
Inventor
Jr Forrest F Craig
Karol L Hujsak
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pan American Petroleum Corp
Original Assignee
Pan American Petroleum Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pan American Petroleum Corp filed Critical Pan American Petroleum Corp
Priority to US855510A priority Critical patent/US3155160A/en
Application granted granted Critical
Publication of US3155160A publication Critical patent/US3155160A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2406Steam assisted gravity drainage [SAGD]

Definitions

  • This invention relates to oil recovery and is directed particularly to the recovery of heavy oils, tars, or bitumens from the underground strata in which they occur. S ecifically, it is directed, but not limited, to the in-place treatment and recovery of solid or semisolid hydrocarbons, tars, or bitumens, one of the most notable examples of which is the bitumen in the McMurray bituminous sand out-cropping along the Athabasca River in Canada.
  • This invention is an improvement upon the invention of US. Patent 2,881,838 for the recovery of heavy hydrocarbons by injecting steam into the deposit and recovering the hydrocarbons therein which how by gravity drainage to the base of a single well. It is a characteristic of these oils that they are substantially non-flowable under reservoir conditions by the application of drivingfiuid pressure. Furthermore, the reservoirs in which they occur generally lack any substantial sources of natural driving energy such as a natural water or gas drive.
  • each pressuring step comprises injecting steam into the formation while holding back pressure and withdrawing liquids at about the same rate as they accumulate at the well bore, exactly as disclosed and claimed in said Patent 2,881,838.
  • Each depressuring step taken after a substantial body of melted tar and steam condensate has accumulated within the formation, comprises releasing the back pressure and withdrawing fluids from the bottom of the well as rapidly as possible to reduce the pressure there to a low value.
  • each step or period of injecting steam at an elevated temperature and pressure into the formation as described in the aforementioned patent is con tinued for a period of time such that a large body of oil will be contacted and have its temperature raised. Then theintroduction of steam into the upper portion of the reservoir is discontinued, and the pressure at the well bore is reduced to as low a value as possible. As a result of doing this at the time when substantial amounts of the semisolid tar have been heated and liquefied, and while a large amount of the steam condensate remains in the reservoir stratum, a pressure dilferential in the direction of the well bore is created, which rapidly moves the accumulated condensate and melted tar to the well bore.
  • the force thus provided is generally proportional to the pressure at which steam was being injected prior to cutoff, and accordingly by utilizing steam at a sufiiciently high pressure, it can be made many times as large as the gravity-drainage force, which would otherwise be the only substantial force available for inducing flow into the well bore.
  • FIG- URE l of the above-mentioned patent. It shows 2. diagrammatic cross-section of a heavy-oil-containing sand stratum 10 with an embodiment of our invention in operation therein during a period of steam injection.
  • Stratum 10 is penetrated by a Well conventionally equipped with a surface casing 16, a production casing 21 cemented through the stratum, and a tubing 25 extending to a screen 26 surrounded by a gravel pack 27 below the base of the stratum.
  • Perforations 24 near the top of stratum 10 extend from the annulus outside tubing 25 through casing 21 and cement 22 into the body of stratum ll).
  • the figure shows the stratum and well at an intermediate stage of steam injection and gravity-drainage production.
  • a drained zone 42 surrounds the well in the upper part of the stratum, the heated oil and the condensate of the steam which heated it having been produced through tubing 25.
  • the radial arrows in zone 42 generally depict the steam flow from perforations 24 to the melting and :gravity drainage zone 43, which surrounds zone 42 and separates it from the unheated part of stratum
  • zone 42 the temperature and pressure are relatively uniform. They may be, for example, about 460 degrees F. and 250 pounds per square inch, absolute, which correspond to the temperature and pressure of saturated steam.
  • zone 4-2 To understand why the temperature and pressure of zone 4-2 must be uniform, assume for a moment that at some point in the zone the temperature is less than 400 degrees F. The steam being present everywhere will immediately condense at this point until the heat released by the condensation brings it up to 400 degrees F. Then the condensation will cease.
  • the outer face of the melting zone 43 acts like the wall of a container or pressure vessel. This is, the 250 pounds per square inch pressure of the steam in zone 42 tends to force the heated hydrocarbons to flow radia ly away from the well. It is unable to do so, however, because the hydrocarbons congeal and plug the pore-space capillaries as soon as they contact the unheated forma- 'tion. Thus, the outer surface of the melting zone 43 is where almost the entire pressure differential occurs between the 250 pounds per square inch of zone 42 and the low natural pressure of the stratum 1d.
  • zone 4-3 The temperature diiferential between the 409 degrees F. of zone 42 and the 50 degrees F., more or less (which is typical of the Athabasca tar) in the unheated formation outside of zone 43, is less abrupt. That is, most of the 359 degrees F. temperature drop occurs across the thickness of zone 42, although there is some warming of the formation immediately outside of the zone 43 before plastic flow of the tar and plugging of the pore space, which characterize the outer boundary of the zone, take place.
  • Under the force of gravity which acts completely independently of the force of the steam pressure, steam condensate and melted hydrocarbon at 400 degrees F. (and of nearly the same specific gravity) flow downwardly and inwardly toward the well most rapidly on the inner face of melting zone 43. Between the inner and outer faces of zone 43, the downward flow of the draining liquids is progressively slower, as the temperature decreases proceeding across the zone outwardly.
  • the arrows in zone 4-3 show the general direction of liquid flow during gravity drainage.
  • zone 43 The flow of heat by conduction through the zone 43, together with the gravity drainage of liquids downwardly and into the well bore, progressively exposes the unheated part of stratum to the heat of the steam in zone 42, so that zone 42 enlarges, as zone 43 propagates radially outwardly from the well. This propagation is most rapid near the top of stratum ltlwhere the drainage is most rapid because zone 43 is there more nearly vertical.
  • the model approximated a volume of the Athabasca tar sand 50 feet thick and 250 feet in diameter. From a consideration of the theoretical equations governing the fiow of heat and the gravity drainage of liquids in porous media, it was calculated that 1 minute of operating time of the model was equivalent to about 28 days of operation in the field. A flow of 1 cubic centimeter per minute in the model was calculated to correspond to about 1.8 barrels per day of fluids produced in the field. For each of several test runs, the model was filled with a mixture of Athabasca tar and sized sand particles in substantially the ratio of their natural occurrence. Connate water was also present in substantially its natural concentration, but compared to the steam condensate its volume and effect were negligible.
  • the over-all efiect of the late depressuring step is to more than double the amount of tar recovery for a given amount of input energy in the form of steam at elevated temperature and pressure.
  • the too-early depressuring step of Run 14 is clearly below the lower time limit by which the present invention may be defined.
  • the first depressuring step of Run 15 appears to be close to but above the minimum time duration of the steam-injecting step, when some of the benefits of the invention may be obtained.
  • the initial period of steam injection should be at least about half as long as the time required for heat to proppagate through a radial distance equal to 2.5 times the formation thickness. Preferably, it should be even longer, namely, about equal to the time for radial heat propagation out to a distance 2.0 to 2.5 times the formation thickness.
  • the minimum time duration for the initial steam-injection step can thus be defined as extending until about 10 percent of the in place oil within a cylindrical volume of radius equal to the formation thickness has been produced by gravity drainage.
  • the preferred time for depressuring is when about 10 percent of the in-place oil within a cylindrical volume having a radius 2 to 2.5 times the formation thickness has been produced.
  • Subsequent pressuring intervals in a series of alternate pressuring and depres'suring steps should be of similar length, until there is substantial depletion, and/ or heat losses to the overburden become prohibitive,
  • each pressuring step cornprises continuing said steam-injecting, Withdrawing, and back-pressure-holding steps until there is an accumulation of heated heavy oil and steam condensate of substantial size in said stratum
  • each depressuring step comprises releasing said back pressure and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish throughout said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.

Description

Nov. 3, 1964 F. F. CRAIG, JR., ETAL 3,155,160
RECOVERY OF HEAVY OILS BY STEAM EXTRACTION Filed Nov. 27, 1959 TO STORAGE OR V PROCESSING F.F. CRAIG, JR. KL. HUJSAK INVENTORS W M ATTORNEY United States Patent 3,155,160 RECQJERY {3F HEAVY 6H5 BY STEAM EXTRACTIQN Forrest F. Craig, Era, and Karol L. Hujsalr, Tulsa, ()lrla,
assignors to Pan American Petroleum Corporation,
Tulsa, Side a corporation of Delaware Filed Nov. 27, 1959, Ser. No. 855,519 8 Claims. (5. res- &0
This invention relates to oil recovery and is directed particularly to the recovery of heavy oils, tars, or bitumens from the underground strata in which they occur. S ecifically, it is directed, but not limited, to the in-place treatment and recovery of solid or semisolid hydrocarbons, tars, or bitumens, one of the most notable examples of which is the bitumen in the McMurray bituminous sand out-cropping along the Athabasca River in Canada.
This invention is an improvement upon the invention of US. Patent 2,881,838 for the recovery of heavy hydrocarbons by injecting steam into the deposit and recovering the hydrocarbons therein which how by gravity drainage to the base of a single well. It is a characteristic of these oils that they are substantially non-flowable under reservoir conditions by the application of drivingfiuid pressure. Furthermore, the reservoirs in which they occur generally lack any substantial sources of natural driving energy such as a natural water or gas drive.
The process described in that patent has been proved operable for the recovery of heavy oils, but for oils of the very high viscosity characterizing the Athabasca tar, it is subject to the drawback that the force of gravity drainage is able at best to produce only a small rate of flow into the well bore. This is because, even at the heat level produced by steam at an elevated pressure, the tar still has an appreciable viscosity which slows down its flow. For example, even at the 400 F. temperature of saturated steam at a pressure of 235 pounds per square inch gauge, the Athabasca tar viscosity is still about 8 centipoises. Thus, even though tar with this viscosity can ultimately be produced solely by gravity drainage, the time required to recover the tar which can be readily heated from a single Well is so long that substantial losses of heat to the overburden occur. Thus, the substantial fraction of the injected steam required to make up for these heat losses constitutes an economic waste.
in view of the foregoing, it is a primary object of our invention to overcome the drawback of low producing rates in a process of the type described, by supplementing the gravity-drainage driving forces available to move the heated oil to the well bore. It is a further object of the invention to provide a method of heavy-oil recovery utilizing steam injection and gravity flow around a single well bore wherein the flow of oil to the well bore is substantially augmented, loss of heat to the overburden is reduced, the ratio of steam injected to oil recovered is lowered, and the time to carry the recovery operation to completion is reduced. Other and further objects, uses, and advantages of the invention will become apparent as the description proceeds.
Briefly stated, we have found by experimental studies that the foregoing objects can be accomplished by a method which is a series of alternating pressuring and depressuring steps, appropriately timed, wherein each pressuring step comprises injecting steam into the formation while holding back pressure and withdrawing liquids at about the same rate as they accumulate at the well bore, exactly as disclosed and claimed in said Patent 2,881,838. Each depressuring step, taken after a substantial body of melted tar and steam condensate has accumulated within the formation, comprises releasing the back pressure and withdrawing fluids from the bottom of the well as rapidly as possible to reduce the pressure there to a low value.
3,l55,lhh Patented Nov. 3, 1%34 This establishes a pressure gradient throughout the heated volume of formation and, by revaporizing some of the condensate, thereby aids the force of gravity drainage in bringing the melted tar and condensate to the well bore for recovery.
That is to say, each step or period of injecting steam at an elevated temperature and pressure into the formation as described in the aforementioned patent is con tinued for a period of time such that a large body of oil will be contacted and have its temperature raised. Then theintroduction of steam into the upper portion of the reservoir is discontinued, and the pressure at the well bore is reduced to as low a value as possible. As a result of doing this at the time when substantial amounts of the semisolid tar have been heated and liquefied, and while a large amount of the steam condensate remains in the reservoir stratum, a pressure dilferential in the direction of the well bore is created, which rapidly moves the accumulated condensate and melted tar to the well bore. The force thus provided is generally proportional to the pressure at which steam was being injected prior to cutoff, and accordingly by utilizing steam at a sufiiciently high pressure, it can be made many times as large as the gravity-drainage force, which would otherwise be the only substantial force available for inducing flow into the well bore.
As the pressure at the well bore is reduced and more rapid flow toward the well bore starts, the steam condensate is in part vaporized by the heat stored in the liquids and in the reservoir rock itself, so that some flashing of the condensate into steam occurs, adding to the gravity-drainage pressure to drive liquids toward the well bore. As compared with non-condensable gases, this flashing of the condensate into steam by the stored heat in the rock and in the liquids maintains the pressure in a sense, so that it drops more slowly than if it resulted merely from the expansion of compressed gases. As a result of this depressuring step, the efficiency of the process is increased several fold over that of a process utilizing gravity flow alone. Part of this increase in eiiiciency is due to the increased flow rate to the well bore, and part is due to the shorter length of time required to produce the oil recoverable from a single well bore, which thereby minimizes the heat loss to overlying formations.
The foregoing can perhaps be more easily visualized by reference to the drawing, which corresponds to FIG- URE l of the above-mentioned patent. It shows 2. diagrammatic cross-section of a heavy-oil-containing sand stratum 10 with an embodiment of our invention in operation therein during a period of steam injection. Stratum 10 is penetrated by a Well conventionally equipped with a surface casing 16, a production casing 21 cemented through the stratum, and a tubing 25 extending to a screen 26 surrounded by a gravel pack 27 below the base of the stratum. Perforations 24 near the top of stratum 10 extend from the annulus outside tubing 25 through casing 21 and cement 22 into the body of stratum ll).
During an injection period, steam from a boiler 35 at the ground surface 13 flows down the annulus and out through perforations 24 into stratum ll Fluids entering the well through pack 27 and screen 26 are produced through the tubing 25, using a pump 29 as required, or if necessary maintaining back pressure by a valve 38 to achieve desired flow rates.
The figure shows the stratum and well at an intermediate stage of steam injection and gravity-drainage production. A drained zone 42 surrounds the well in the upper part of the stratum, the heated oil and the condensate of the steam which heated it having been produced through tubing 25. The radial arrows in zone 42 generally depict the steam flow from perforations 24 to the melting and :gravity drainage zone 43, which surrounds zone 42 and separates it from the unheated part of stratum It Throughout zone 42 the temperature and pressure are relatively uniform. They may be, for example, about 460 degrees F. and 250 pounds per square inch, absolute, which correspond to the temperature and pressure of saturated steam. To understand why the temperature and pressure of zone 4-2 must be uniform, assume for a moment that at some point in the zone the temperature is less than 400 degrees F. The steam being present everywhere will immediately condense at this point until the heat released by the condensation brings it up to 400 degrees F. Then the condensation will cease.
Because of the nature of the heavy oil that it is substantially non-flowable at the normal reservoir temperature, the outer face of the melting zone 43 acts like the wall of a container or pressure vessel. This is, the 250 pounds per square inch pressure of the steam in zone 42 tends to force the heated hydrocarbons to flow radia ly away from the well. It is unable to do so, however, because the hydrocarbons congeal and plug the pore-space capillaries as soon as they contact the unheated forma- 'tion. Thus, the outer surface of the melting zone 43 is where almost the entire pressure differential occurs between the 250 pounds per square inch of zone 42 and the low natural pressure of the stratum 1d.
The temperature diiferential between the 409 degrees F. of zone 42 and the 50 degrees F., more or less (which is typical of the Athabasca tar) in the unheated formation outside of zone 43, is less abrupt. That is, most of the 359 degrees F. temperature drop occurs across the thickness of zone 42, although there is some warming of the formation immediately outside of the zone 43 before plastic flow of the tar and plugging of the pore space, which characterize the outer boundary of the zone, take place. Under the force of gravity, which acts completely independently of the force of the steam pressure, steam condensate and melted hydrocarbon at 400 degrees F. (and of nearly the same specific gravity) flow downwardly and inwardly toward the well most rapidly on the inner face of melting zone 43. Between the inner and outer faces of zone 43, the downward flow of the draining liquids is progressively slower, as the temperature decreases proceeding across the zone outwardly. The arrows in zone 4-3 show the general direction of liquid flow during gravity drainage.
The flow of heat by conduction through the zone 43, together with the gravity drainage of liquids downwardly and into the well bore, progressively exposes the unheated part of stratum to the heat of the steam in zone 42, so that zone 42 enlarges, as zone 43 propagates radially outwardly from the well. This propagation is most rapid near the top of stratum ltlwhere the drainage is most rapid because zone 43 is there more nearly vertical.
Eventually a condition is reached Where a large body of heated oil and condensate is present below and surrounding the base of zone 42, but the rate of its entry into the well bore is limited by the still substantial viscosity of the oil and the small force of gravity. It is at this time that the improvement forming the present invention comes into operation. Steam injection through perforations 24 is stopped, valve 33 is opened wide, and pump 29 is operated to reduce the pressure inside screen 26 rapidly to as low a value as possible.
Now, consider what happens to a droplet of steam condensate in the zone 4-3 at a representative point 44. it is initially at, say 350 degrees F. and 250 pounds per square inch, absolute, pressure. Due to the temperature drop across zone 43, its temperature is somewhat less than the maximum 400 degrees F. of the steam in zone 42. As liquid is drawn into the well bore, the pressure at 44 drops rapidly. When it becomes less than about 135 pounds per square inch, absolute, the droplet of condensate at 350 degrees F. and in contact with sand and other liquids at the same temperature, can no longer remain a liquid but returns to vapor form, extracting its heat of vaporization from the heated solids and liquids surrounding it. With continuing pressure reduction, it expands as a gas and drives heated oil ahead of it toward the well bore.
What happens at point 44 is representative of the revaporization of steam condensate everywhere in the zone 43, as the pressure at each point drops below that correspondin to saturated steam for the temperature existing at that point within the zone. It is the relatively large force of his revaporized condensate within the body of accumulated liquids, compared with the smaller force of gravity drainage, that so effectively supplements the latter in the recovery process.
It is a matter of substantial importance in the application of the present invention to choose the proper time for cut-off of steam injection and reduction of the pressure at the well bore. If the steam injection is stopped and the pressure at the well bore is reduced too early in the life of a recovery project at the well, only a relatively small part of the oil in-place will be recovered during the pressure-drive stage because too small a volume of the reservoir has been heated and the condensate is close to the well where it is immediately produced without driving a quantity of oil ahead of it as occurs with late depressuring. On the other hand, if the cut-off of steam injection and reduction of well-bore pressure are delayed until a large body of condensate and heated oil accumulates and is ready to be produced into the well bore, reduction of the pressure at the well bore then accomplishes the rapid production of a large fraction of this oil.
In further substantiation of this aspect of our invention, the following experiments are cited. A model apparatus was constructed somewhat similar to that shown in FIG- URE 2 of the above-mentioned Patent 2,881,838. The relative vertical and horizontal dimensions of the model were changed, however, so that the tar-sand body had a diameter of about 15 inches and a height of 3 inches.
Given these dimensions and this dimensional ratio, by choice of the proper sizes of sand particles, the model approximated a volume of the Athabasca tar sand 50 feet thick and 250 feet in diameter. From a consideration of the theoretical equations governing the fiow of heat and the gravity drainage of liquids in porous media, it Was calculated that 1 minute of operating time of the model was equivalent to about 28 days of operation in the field. A flow of 1 cubic centimeter per minute in the model was calculated to correspond to about 1.8 barrels per day of fluids produced in the field. For each of several test runs, the model was filled with a mixture of Athabasca tar and sized sand particles in substantially the ratio of their natural occurrence. Connate water was also present in substantially its natural concentration, but compared to the steam condensate its volume and effect were negligible.
With the model at room temperature, operation of each run was initiated by admitting into the perforated annulus around the central tube of the model, 400 F. saturated steam at a gauge pressure of about 235 pounds per square inch. Liquid was removed from the central tube as fast as it collected there by draining directly into a product vessel. A back pressure was held on the liquidproduct receiver connected to the model to maintain the entire system under the desired pressure of 235 pounds per square inch except during the intervals when the model was depressured. At these times the input steam was shut oil, and the product recovery was transferred to a receiver at atmospheric pressure. When the pressure in the model reached atmospheric, the depressuring was considered to be completed, and steam injection was immediately resumed. Each experimental run of the model was considered ended when the temperature at the top of'the outside edge of the bed had risen 25 F. above its initial room-temperature value, steam injection then being completely stopped. This was equivalent to the arrival of heat at a radial distance of 125 feet from the well modeled.
In the accompanying Table I are shown the basic data obtained in four consecutive, directly comparable runs with this model. As will be immediately apparent from an inspection of this table, Runs 13, 14, and 16 produced rather similar results, both as regards the weight-percentage of recovery of the tar present in the model and as regards the water/tar ratio, which is a measure of the amount of steam injection required to obtain this production. In all of these tests, the amount of connate water present in the tar was negligible compared to the amount of condensate Water produced by the introduced steam.
Table I.-M0del Data The results of Run 15, however, are markedly different, as is evident from the fact that the percentage-recovery is almost two and one-half times that of the average of the other three runs, whereas the amount of steam injected and condensate produced is very little different. This increase in tar production gives an over-all water/tar ratio of about 2.9 instead of an average of around 7.3 and thus represents a marked increase in efficiency of utilization of the injected steam.
The reason for this marked change in efficiency of operation is brought out in Table II showing the depressuring data applicable to these model runs. As is clear from this table, no depressuring of any sort was done during either of Runs 13 and 16, so that the sole re covery mechanism in operation for these runs was gravity drainage as described in the aforementioned patent. In the cases of Runs 14 and 15, however, one or more depressuring steps were carried out during the run, which steps comprised cutting otf the input steam by closing an inlet valve and directing the fluids produced from the model into a receiver at atmospheric rather than elevated pressure until the pressure in the model vessel reached atmospheric.
during this time interval is roughly proportional to the time involved, and no appreciable change in water-to-tar ratio was observed during the interval. It appears that there was no substantial body of heated oil and condensate formed and ready to be forced into the well bore.
In the case of Run 15, the early depressuring step was carried out somewhat later in the duration of the run, namely, between 10 and 11.75 minutes after the start. Thus, this step was performed about midway in the duration of the run at a time when heating had probably occurred out from the well at a distance about equal to the formation thickness. Although not a significantly greater amount of tar was produced during this interval than in the depressuring step of Run 14, it is apparent from the reduced water-to-tar ratio of 2.5 that there was some substantial benefit to carrying out the depressuring step at this time. In other words, there was an appreciable body of heated oil ready to be driven to the well bore by flashing condensate.
As compared with the second or late depressuring step, which was begun just after the tempera-hire rise had occurred at the outer edge of the model, the effect of this early depressun'ng step is relatively small. By starting the depressuring of the model at a time relatively late in the operation when there is a quite large body of heated tar and condensate in the formation, as is indicated by the occurrence of heating at a distance nearly two and one-half times the bed thickness from the well bore, more tar is produced during the late depressuring step than in all the rest of the operation put together. Furthermore, tar and condensate are produced in almost equal quantities rather than in the patio of 1 to 7 characteristic of gravity drainage. Thus, the over-all efiect of the late depressuring step is to more than double the amount of tar recovery for a given amount of input energy in the form of steam at elevated temperature and pressure. In summary, the too-early depressuring step of Run 14 is clearly below the lower time limit by which the present invention may be defined. The first depressuring step of Run 15 appears to be close to but above the minimum time duration of the steam-injecting step, when some of the benefits of the invention may be obtained. In other words, the initial period of steam injection should be at least about half as long as the time required for heat to proppagate through a radial distance equal to 2.5 times the formation thickness. Preferably, it should be even longer, namely, about equal to the time for radial heat propagation out to a distance 2.0 to 2.5 times the formation thickness.
From temperature observations at various points in the model during the foregoing and other runs, it was found that the radial propagation of the tar-melting face at Table II .-M0del Depressurzng Data Run No 13 14 15 16 Early depressuring interval Not done- Between 4 and 9 min- Between 10 and 11.76 Not done.
utes after start. minutes after start. Percent of produced tar obtained 18 during early depressnring. Water/tar ratio during this intervaL 7.8 2.5 Late depressuring interval Not done Not done Between 18.75 and 21 Do.
minutes after start Percent of produced tar obtained during late depressuring. Yfater/tar ratio during this intervaL 1.l
As will be seen from Table II, depressuring was used in different ways in Runs 14 and 15. From these runs it is possible to see the effect of a depressuring step carried out very early. in the duration of a run as compared with carrying it out in the middle or much later in the run. Thus, in Run 14 only one depressuringstep was performed, between the times of 4 and 9 minutes after the start of the run. This depressuring was obviously too early to have any. appreciable effect on the results of the run, as the 18 percent of produced tar obtained by computation from memurernents on cores, when percent of this volume of tar has been recovered by gravity drainage, then the tar-melting face will have propagated a distance r from the well bore. The minimum time duration for the initial steam-injection step can thus be defined as extending until about 10 percent of the in place oil within a cylindrical volume of radius equal to the formation thickness has been produced by gravity drainage. The preferred time for depressuring is when about 10 percent of the in-place oil within a cylindrical volume having a radius 2 to 2.5 times the formation thickness has been produced. Subsequent pressuring intervals in a series of alternate pressuring and depres'suring steps should be of similar length, until there is substantial depletion, and/ or heat losses to the overburden become prohibitive,
in terms of l'erd operations, the above test results can be scaled up in accordance with the factors previously stated. The calculated field results from such scaling up of the model data are shown in Table Ill. Thus, the average production rate of 66.7 barrels of tar per day for Run is more than double the best average production rate of 27.1 barrels or tar per day for Run 13. These are the calculated results obtainable from a tar formation 50 feet thick, heated out to a radius of 125 feet from the well core. The over-all water-to-tar ratios for these production figures are the same as for the model and thus likewise demonstrate a marked improvement in utilization of the energy of the input steam.
Table III.Calculated Field Results From Scaled-Up Model Data Run N o l3 14: 15 16 Field time, years 1. 33 2.44 1. 60 1.60 Average production in barrels per day:
Tar 27. 1 19. v 66. 7 25 Voter 209 141 193 175 Over-all water/tar ratio 7. 7 7. 3 2. 9 7.0
While the foregoing results of the model runs and calculated results of field operation are presented quanti tatively, they are to be considered as only qualitative as regards actual field operation. The scaling factors between the model and the field operations are strictly applicable only to the case of gravity drainage (i.e., to Runs 13 and 16), and even for that case with a precision which is not completely known. While a dc pressuring step in field operations, performed at a time when the tar-melting face has propagated a distance from the well bore equal to two to two and one-half times the bed thickness, can certainly be expected to improve the efiiciency of the operation by a substantial factor, it will probably be different from the 2.5 factor characterizing these model tests. Nevertheless, it is clear that the force of gravity drainage can be greatly supplemented in the manner set forth in the above description.
Although the model runs were terminated when heat has been carried radially by the steam out to about 2.5 times the stratum thickness, a field operation would probably not have reached its economic limit of recovery at a corresponding time. Thus, at the conclusion of production induced by the depressuring step designated as late depressuring above, the entire pressuring and depressuring cycle will be repeated one or more additional times. That is, steam injection at an elevated temperature and pressure will be resumed and continued until there is another large body of condensate and melted tar present in the formation. Depressuring will then bring this body of liquid rapidly to the well bore for recovery. As a result of the higher producing rates and greater steam economy accompanying this alternate pressuring and depressuring of the formation, a larger percentage of in-place tar or oil can be recovered before heat losses become prohibitive than can be recovered when gravity drainage alone is relied upon to move the liquids to the producing well.
While we have described our invention in terms of the foregoing specific examples and details, it is to be understood that other and further modifications of the procedure may be made in particular instances. The scope of the hivention, therefore, should not be considered as limited to the details set forth, but it is properly to be ascertained from the appended claims.
We claim: 1. In a method of recovering, from an undergroun stratum in which it occurs, heavy oil which is substantially nonfiowable by the application of driving-fluid pressure thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate flow downwardly by gravity drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and withdrawing said heated oil and condensate from near the bottom of said well at substantially the rate they collect there while holding sutlicient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propagates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises performing said method as a. series of alternating pressuring and depressuring steps in which each pressuring step cornprises continuing said steam-injecting, Withdrawing, and back-pressure-holding steps until there is an accumulation of heated heavy oil and steam condensate of substantial size in said stratum, and each depressuring step comprises releasing said back pressure and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish throughout said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.
2. In a method of recovering, from an underground stratum in which it occurs, heavy oil which is substantially nonfiowable by the application of driving-fluid pressure thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate flow downwardly by gravity drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and withdrawing said heated oil and condensate from near the bottom of said well at substantially the rate they collect there while holding sufiicient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propagates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises performing said method as a series of alternating pressuring and depressuring steps, all of said pressuring steps being of approximately equal time duration, each of said pressuring steps comprising continuing said steam-injecting, withdrawing, and backpressure-holding steps for a period of time at least as long as that required to produce by gravity drainage percent of the in-place heavy oil in a cylindrical volume of said stratum surrounding said well of a radius equal to the stratum thickness, and each depressuring step comprising releasing said baek pressure and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well sore to a low value and thereby establish throughout said .leated volume a substantial pressure gradient to aid the fOIcc of gravity drainage in moving said accumulation toward said well bore.
3. In a method of recovering, from an underground stratum in which it occurs, heavy oil which is substantially nonfiowable by the application of driving-fluid pressure thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate flow downwardly by gravity drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and withdrawing said heated oil and condensate from near the bottom of said well at substantially the rate they collect there while holding sufficient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propagates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises performing said method as a series of alternating pressuring and depressuring steps, all of said pressuring steps being of approximately equal time duration, each of said pressuring steps comprising continuing said steam-injecting, withdrawing, and back-pressureholding steps for a period of time equal to that required to produce by gravity drainage 10 percent of the in-place heavy oil in a cylindrical volume surrounding said well and of a radius between about 2.0 and 2.5 times the stratum thickness, and each depressuring step comprising releasing said back pressure and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish throughout said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.
4. In a method of recovering, from an underground stratum in which it occurs, heavy oil which is substantially nonfiowable by the application of driving-fluid pressure thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate flow downwardly by gravity drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and withdrawing said heated oil and condensate from near the bottom of said well at substantially the rate they collect there while holding suflicient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propagates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises the steps of discontinuing said steam-injecting, withdrawing and back-pressure-holding steps at a time when there is an accumulation of heated heavy oil and steam condensate of substantial size Within said stratum, and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish throughout said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.
5. In a method of recovering, from an underground stratum in which it occurs, heavy oil which is substantially nonfiowable by the application of driving-fluid pressure thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate flow downwardly by ravity drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and withdrawing said heated oil and condensate from near the bottom of said well at substantially the rate they collect there while holding sufiicient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propagates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises the steps of discontinuing said steam-injecting, withdrawing, and back-pressure holding steps at a time when said zone has propagated radially from said well a distance which is at least as great as the stratum thickness, and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish throughout said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.
6. In a method of recovering, from an underground stratum in which it occurs, heavy oil which is substantially nonfiowable by the application of driving-fluid pressure thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate flow downwardly by gravity drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and withdrawing said heated oil and condensate from near the bottom of said well at substantially the rate they collect there while holding sufiicient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propagates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises the steps of discontinuing said steam-injecting, withdrawing, and back-pressureholding steps at a time when said zone has propagated radially from said well a distance between about 2.0 and 2.5 times the stratum thickness, and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish throughout said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.
7. In a method of recovering, from an underground strattun in which it occurs, heavy oil which is substantially nonfiowable by the application of driving-fluid pressure thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate flow downwardly by gravity drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and withdrawing said heated oil and condensate from near the bottomof said well at substantially the rate they collect there while holding suthcient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propogates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises the steps of discon tinuing said steam-injecting, withdrawing, and backpressure-holding steps at a time when at least 10 percent of the in-place heavy oil in a cylindrical volume of said stratum surrounding said well and of a radius equal to the stratum thickness has been produced by gravity drainage, and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish throughout said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.
8. In a method of recovering, from an underground stratum in which it occurs, heavy oil which is substantially nonflowableby the application of driving-fluid pressure 3 thereto and which retains substantial viscosity at elevated temperatures, said stratum being substantially completely penetrated by a well extending from the ground surface, which method comprises the steps of injecting substantially only steam at an elevated temperature and pressure into said well and thence into said stratum to heat by condensation substantially the entire stratum face exposed in said well and reduce the viscosity of the oil at said face, whereby heated oil and steam condensate fiow downwardly by graruty drainage toward the bottom of said well and continuously expose unheated oil and formation behind said face, and Withdrawing said heated oil and condensate from near the bottom of said well at substantially the rate they collect there while holding sufficient back pressure on said well to maintain said pressure and temperature at their elevated values within the heated volume of said stratum, whereby a zone of melting oil and gravity drainage of heated oil and steam condensate propagates radially outwardly from said well through at least the upper part of said stratum, the improvement which comprises the steps of discontinuing said steam-injecting, withdrawing, and back-pressure holding steps at a time when 10 percent of the in-place heavy oil in a cylindrical volume of said stratum surrounding said well and of a radius between about 2.0 and 2.5 times the stratum thickness has been produced by gravity, and rapidly withdrawing fluids from near the bottom of said well to reduce the pressure at said well bore to a low value and thereby establish through said heated volume a substantial pressure gradient to aid the force of gravity drainage in moving said accumulation toward said well bore.
References Cited in the file of this patent UNITED STATES PATENTS 2,412,765 Buddrus et al Dec. 17, 1946 2,862,558 Dixon Dec. 2, 1958 2,881,838 Morse et a1 Apr. 14, 1959

Claims (1)

  1. 4. IN A METHOD OF RECOVERING, FROM AN UNDERGROUND STRATUM IN WHICH IT OCCURS, HEAVY OIL WHICH IS SUBSTANTIALLY NONFLOWABLE BY THE APPLICATION OF DRIVING-FLUID PRESSURE THERETO AND WHICH RETAINS SUBSTANTIAL VISCOSITY AT ELEVATED TEMPERATURES, SAID STRATUM BEING SUBSTANTIALLY COMPLETELY PENETRATED BY A WELL EXTENDING FROM THE GROUND SURFACE, WHICH METHOD COMPRISES THE STEPS OF INJECTING SUBSTANTIALLY ONLY STEAM AT AN ELEVATED TEMPERATURE AND PRESSURE INTO SAID WELL AND THENCE INTO SAID STRATUM TO HEAT BY CONDENSATION SUBSTANTIALLY THE ENTIRE STRATUM FACE EXPOSED IN SAID WELL AND REDUCE THE VISCOSITY OF THE OIL AT SAID FACE, WHEREBY HEATED OIL AND STEAM CONDENSATE FLOW DOWNWARDLY BY GRAVITY DRAINAGE TOWARD THE BOTTOM OF SAID WELL AND CONTINUOUSLY EXPOSE UNHEATED OIL AND FORMATION BEHIND SAID FACE, AND WITHDRAWING SAID HEATED OIL AND CONDENSATE FROM NEAR THE BOTTOM OF SAID WELL AT SUBSTANTIALLY THE RATE THEY COLLECT THERE WHILE HOLDING SUFFICIENT BACK PRESSURE ON SAID WELL TO MAINTAIN SAID PRESSURE AND TEMPERATURE AT THEIR ELEVATED VALUES WITHIN THE HEATED VOLUME OF SAID STRATUM, WHEREBY A ZONE OF MELTING OIL AND GRAVITY DRAINAGE OF HEATED OIL AND STEAM CONDENSATE PROPAGATES RADIALLY OUTWARDLY FROM SAID WELL THROUGH AT LEAST THE UPPER PART OF SAID STRATUM, THE IMPROVEMENT WHICH COMPRISES THE STEPS OF DISCONTINUING SAID STEAM-INJECTING, WITHDRAWING AND BACK-PRESSURE-HOLDING STEPS AT A TIME WHEN THERE IS AN ACCUMULATION OF HEATED HEAVY OIL AND STEAM CONDENSATE OF SUBSTANTIAL SIZE WITHIN SAID STRATUM, AND RAPIDLY WITHDRAWING FLUIDS FROM NEAR THE BOTTOM OF SAID WELL TO REDUCE THE PRESSURE AT SAID WELL BORE TO A LOW VALUE AND THEREBY ESTABLISH THROUGHOUT SAID HEATED VOLUME A SUBSTANTIAL PRESSURE GRADIENT TO AID THE FORCE OF GRAVITY DRAINAGE IN MOVING SAID ACCUMULATION TOWARD SAID WELL BORE.
US855510A 1959-11-27 1959-11-27 Recovery of heavy oils by steam extraction Expired - Lifetime US3155160A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US855510A US3155160A (en) 1959-11-27 1959-11-27 Recovery of heavy oils by steam extraction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US855510A US3155160A (en) 1959-11-27 1959-11-27 Recovery of heavy oils by steam extraction

Publications (1)

Publication Number Publication Date
US3155160A true US3155160A (en) 1964-11-03

Family

ID=25321432

Family Applications (1)

Application Number Title Priority Date Filing Date
US855510A Expired - Lifetime US3155160A (en) 1959-11-27 1959-11-27 Recovery of heavy oils by steam extraction

Country Status (1)

Country Link
US (1) US3155160A (en)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3273640A (en) * 1963-12-13 1966-09-20 Pyrochem Corp Pressure pulsing perpendicular permeability process for winning stabilized primary volatiles from oil shale in situ
US3292702A (en) * 1966-06-07 1966-12-20 Exxon Production Research Co Thermal well stimulation method
US3333637A (en) * 1964-12-28 1967-08-01 Shell Oil Co Petroleum recovery by gas-cock thermal backflow
US3354954A (en) * 1965-12-20 1967-11-28 Pan American Petroleum Corp Steam injection process for recovery of petroleum
US3379247A (en) * 1965-11-08 1968-04-23 Phillips Petroleum Co Oil recovery process using hot fluids
US3412794A (en) * 1966-11-23 1968-11-26 Phillips Petroleum Co Production of oil by steam flood
US3422893A (en) * 1966-10-03 1969-01-21 Gulf Research Development Co Conduction heating of formations
US3434541A (en) * 1967-10-11 1969-03-25 Mobil Oil Corp In situ combustion process
US3572436A (en) * 1969-01-17 1971-03-30 Frederick W Riehl Method for recovering petroleum
US3913671A (en) * 1973-09-28 1975-10-21 Texaco Inc Recovery of petroleum from viscous petroleum containing formations including tar sand deposits
US4116275A (en) * 1977-03-14 1978-09-26 Exxon Production Research Company Recovery of hydrocarbons by in situ thermal extraction
US4465137A (en) * 1982-06-25 1984-08-14 Texaco Inc. Varying temperature oil recovery method
US4566532A (en) * 1981-03-30 1986-01-28 Megatech Corporation Geothermal heat transfer
US4623022A (en) * 1984-12-06 1986-11-18 Exxon Production Research Co. Well sand packing prevention method
US4637458A (en) * 1986-01-10 1987-01-20 Maraven, S.A. Blowout preventer for use in combination with a deep well pump
FR2601998A1 (en) * 1986-06-26 1988-01-29 Inst Francais Du Petrole Method and system for production using a central well and collecting drains
US4947933A (en) * 1989-01-03 1990-08-14 Mobil Oil Corporation Temperature activated polymer for profile control
US5022466A (en) * 1989-01-03 1991-06-11 Mobil Oil Corporation Method for steam flooding profile control
US5088555A (en) * 1990-12-03 1992-02-18 Mobil Oil Corporation Consolidation agent and method
US5325920A (en) * 1992-12-18 1994-07-05 Mobil Oil Corp. Enhanced oil recovery from low permeability reservoirs using organosilicone surfactants
US5337828A (en) * 1992-12-18 1994-08-16 Mobil Oil Corporation Use of carbon dioxide for gas-lifting heavy oil
US5377764A (en) * 1992-12-18 1995-01-03 Mobile Oil Corporation Means of injecting CO2 into circulation tubing to facilitate CO2 gas lift
US5803171A (en) * 1995-09-29 1998-09-08 Amoco Corporation Modified continuous drive drainage process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2412765A (en) * 1941-07-25 1946-12-17 Phillips Petroleum Co Recovery of hydrocarbons
US2862558A (en) * 1955-12-28 1958-12-02 Phillips Petroleum Co Recovering oils from formations
US2881838A (en) * 1953-10-26 1959-04-14 Pan American Petroleum Corp Heavy oil recovery

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2412765A (en) * 1941-07-25 1946-12-17 Phillips Petroleum Co Recovery of hydrocarbons
US2881838A (en) * 1953-10-26 1959-04-14 Pan American Petroleum Corp Heavy oil recovery
US2862558A (en) * 1955-12-28 1958-12-02 Phillips Petroleum Co Recovering oils from formations

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3273640A (en) * 1963-12-13 1966-09-20 Pyrochem Corp Pressure pulsing perpendicular permeability process for winning stabilized primary volatiles from oil shale in situ
US3333637A (en) * 1964-12-28 1967-08-01 Shell Oil Co Petroleum recovery by gas-cock thermal backflow
US3379247A (en) * 1965-11-08 1968-04-23 Phillips Petroleum Co Oil recovery process using hot fluids
US3354954A (en) * 1965-12-20 1967-11-28 Pan American Petroleum Corp Steam injection process for recovery of petroleum
US3292702A (en) * 1966-06-07 1966-12-20 Exxon Production Research Co Thermal well stimulation method
US3422893A (en) * 1966-10-03 1969-01-21 Gulf Research Development Co Conduction heating of formations
US3412794A (en) * 1966-11-23 1968-11-26 Phillips Petroleum Co Production of oil by steam flood
US3434541A (en) * 1967-10-11 1969-03-25 Mobil Oil Corp In situ combustion process
US3572436A (en) * 1969-01-17 1971-03-30 Frederick W Riehl Method for recovering petroleum
US3913671A (en) * 1973-09-28 1975-10-21 Texaco Inc Recovery of petroleum from viscous petroleum containing formations including tar sand deposits
US4116275A (en) * 1977-03-14 1978-09-26 Exxon Production Research Company Recovery of hydrocarbons by in situ thermal extraction
US4566532A (en) * 1981-03-30 1986-01-28 Megatech Corporation Geothermal heat transfer
US4465137A (en) * 1982-06-25 1984-08-14 Texaco Inc. Varying temperature oil recovery method
US4623022A (en) * 1984-12-06 1986-11-18 Exxon Production Research Co. Well sand packing prevention method
US4637458A (en) * 1986-01-10 1987-01-20 Maraven, S.A. Blowout preventer for use in combination with a deep well pump
DE3625748A1 (en) * 1986-01-10 1987-07-16 Intevep Sa DRILLING DEVICE WITH A HOLE HOLE PREVENTER
FR2601998A1 (en) * 1986-06-26 1988-01-29 Inst Francais Du Petrole Method and system for production using a central well and collecting drains
US4947933A (en) * 1989-01-03 1990-08-14 Mobil Oil Corporation Temperature activated polymer for profile control
US5022466A (en) * 1989-01-03 1991-06-11 Mobil Oil Corporation Method for steam flooding profile control
US5088555A (en) * 1990-12-03 1992-02-18 Mobil Oil Corporation Consolidation agent and method
US5325920A (en) * 1992-12-18 1994-07-05 Mobil Oil Corp. Enhanced oil recovery from low permeability reservoirs using organosilicone surfactants
US5337828A (en) * 1992-12-18 1994-08-16 Mobil Oil Corporation Use of carbon dioxide for gas-lifting heavy oil
US5377764A (en) * 1992-12-18 1995-01-03 Mobile Oil Corporation Means of injecting CO2 into circulation tubing to facilitate CO2 gas lift
US5803171A (en) * 1995-09-29 1998-09-08 Amoco Corporation Modified continuous drive drainage process

Similar Documents

Publication Publication Date Title
US3155160A (en) Recovery of heavy oils by steam extraction
US2813583A (en) Process for recovery of petroleum from sands and shale
US2897894A (en) Recovery of oil from subterranean reservoirs
US3057404A (en) Method and system for producing oil tenaciously held in porous formations
US3653438A (en) Method for recovery of petroleum deposits
US4362213A (en) Method of in situ oil extraction using hot solvent vapor injection
US2910123A (en) Method of recovering petroleum
US3442332A (en) Combination methods involving the making of gaseous carbon dioxide and its use in crude oil recovery
US3040809A (en) Process for recovering viscous crude oil from unconsolidated formations
US2876838A (en) Secondary recovery process
US3118499A (en) Secondary recovery procedure
US3093191A (en) Oil recovery method
USRE25918E (en) Recovery of heavy oils by steam extraction
US3170515A (en) In-situ combustion process
US4199028A (en) Enhanced recovery with geopressured water resource
US3027942A (en) Oil recovery process
US2238701A (en) Method of recovering oil from oil and gas bearing sands
US3054448A (en) Counterflow in situ combustion process
US3520367A (en) Method of producing oil using steam condensate trapped in storage zone
Riehl Method for recovering petroleum
Brown et al. Tapered steam injection process
Every et al. Method for removing methane from coal
Odeh Method for recovering hydrocarbons
Shen Application of a scaled, three-dimensional high-pressure physical model to steamflooding
Redford et al. Viscous oil recovery method.[cycles of steam-air injection and production]