US2626779A - Method of recovering lost circulation occurring in production strata in wells - Google Patents

Method of recovering lost circulation occurring in production strata in wells Download PDF

Info

Publication number
US2626779A
US2626779A US133387A US13338749A US2626779A US 2626779 A US2626779 A US 2626779A US 133387 A US133387 A US 133387A US 13338749 A US13338749 A US 13338749A US 2626779 A US2626779 A US 2626779A
Authority
US
United States
Prior art keywords
well
circulation
gravel
sand
fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US133387A
Inventor
Arthur L Armentrout
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US133387A priority Critical patent/US2626779A/en
Application granted granted Critical
Publication of US2626779A publication Critical patent/US2626779A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/003Means for stopping loss of drilling fluid

Definitions

  • This invention relates to a method of recovering lost circulation occurring in productive strata in the course of drilling wells and placing the well on production when the drilling has been completed.
  • a primary object of the present invention is to provide a method of recovering lost circulation where the circulation is lost in the productive stratum and wherein the plug or barrier formed will eflectively prevent the escape or loss of circulation fluid into the productive stratum but when the well is subsequently placed on production it will not prevent or impede the entry of the wanted fluid into the well bore.
  • the seal produced in the productive stratum is designed to prevent the loss therein of the circulation fluid used in drilling the well but it will not prevent or retard the flow of the wanted fluid in the reverse direction when the well is ultimately placed on production.
  • Figure l is a diagrammatic view of apparatus employed in performing the present method
  • Fig. 2 is a partial view in vertical section illustrating details of construction of the apparatus.
  • Fig. 3 is a partial vertical section on a somewhat enlarged scale illustrating the manner in which the seal to prevent loss of circulation fluid is formed in the well.
  • Fig. 1 diagrammatically illustrated in Fig. 1 is a rotary well drilling apparatus wherein the drill pipe Ill having the bit I l is rotated by the rotary table I2.
  • the drill pipe is illustrated as having passed through a productive stratum I3 which may be assumed to be capable of producing oil or gas and which has cracks or crevices therein through which the circulation fluid pumped down through the drill pipe becomes lost.
  • the loss of circulation fluid may be due to the cracks or crevices in the productive stratum or it may be due to the fact that the productive stratum is highly pervious but has a low natural pressure.
  • the conventional well drilling mud or circulation fluid is supplied to the drill pipe through a pump l4 and after being discharged from the drill pipe the circulation fluid is normally returned to the surface, passed over a conventional shaker screen and returned to a sump from which it is recycled through the pump [4.
  • a manifold 11 Between the pump [4 and the hose I5 that leads to the swivel at the top of the kelly Hi there is a manifold 11.
  • a manifold 11 Connected to this manifold there are one or more tanks i8 and 19, the outlets from which are connected through valves 20 and 2
  • At the top of each tank there are hoppers 22 and 23 which are connected to the tops of the tanks throughvalves 24 and 25, respectively. Branch connections lead from the manifold I!
  • valves 26 and 21 are merely drain valves controlling outlets at the bottoms of the tanks whenever it is desired to empty the tanks without introducing their contents into the manifold.
  • the manifold is preferably provided with a nozzle 30 through which the circulation fluid is discharged at high velocity so as to pick up and carry with the circulation fluid the solid material that is introduced into the manifold from the tanks I8 and I9.
  • a substantial batch or batches of screened sand and gravel is discharged into the manifold followed closely by a batch of diatomaceous earth.
  • the sand and gravel that is introduced into the manifold may have a particle size running as high as inch. However, the minimum size will ordinarily be that sand or gravel which will be caught on a screen having a mesh size of .065 inch. Whatever sand is capable of passing through a .065 inch screen is normally discarded. In some instances the minimum sand size may be somewhat larger.
  • the sand and gravel is quickly fed to the manifold by using the tanks l8 and I9 consecutively so as to deliver the sand and gravel in batches of from 25 to 100 cu. ft.
  • This sand and gravel is picked up by the circulation fluid pumped by the pump through the manifold and is quickly carried down through the drill pipe and discharged at the bit II. It is carried by the circulation fluid that is escaping into the formation I3 into the cracks, crevices or interstices forming a sand and gravel foundation for the diatomaceous earth that is supplied to the manifold immediately following the last batch. In the usual situation from 100 to 300 cu. ft.
  • diatomaceous earth is supplied to the manifold and carried down through the drill pipe.
  • the diatomaceous earth that is discharged from the bit H is carried by the circulation fluid to the previously deposited sand and gravel and, in effect, forms a type of filter cake over the sand and gravel which will form a base or foundation for the ingredients in the circulation fluid or well drilling mud. Consequently in a given crevice in the formation l3 there will be first deposited a fill of sand and gravel over which there will be deposited diatomaceous earth on which the sheath of the constituents of the well drilling mud is deposited.
  • the casing When the drilling of the well is completed the casing is normally installed and the perforated liner is installed opposite the producing stratum.
  • the well may then be brought on production such as by bailing the well down.
  • the pressure in the well opposite the stratum I3 When the pressure in the well opposite the stratum I3 is less than the pressure existing in the stratum the wanted fluid will commence to flow from the stratum into the well bore. In so doing the sand and gravel fill being relatively clean will permit the fluid to flow therethrough.
  • the mud sheath and the diatomaceous earth will be carried by the fluid into the well bore and as these are formed of very fine particles they may pass readily through the perforations of the liner into the liner and be removed from the well.
  • the sand and gravel particles being larger than the perforation size in the liner, will be retained in the well on the outside of the liner but form no serious impediment to the entry of the wanted fluid from the productive stratum into the well bore.
  • the improved method temporarily seals the productive stratum against the entry of the circulation fluid thereto.
  • the seal formed does not impede such flow.
  • the above described method may be employed whenever it is known or suspected that circulation fluid is being lost in the productive stratum.
  • I maintain sand and gravel in the circulation fluid at all times to the extent of about five to ten percent and observe the condition of the shaker screen and the sump at all times. If the sand and gravel is not returned to the shaker screen along with the circulation fluid this indicates, that the sand and gravel is being deposited in the well and if the level in the sump falls, indicating that circulation is being lost, I then quickly dump one or more batches of sand and gravel into the manifold I! by the apparatus illustrated and immediately follow the last batch with a substantial batch of diatomaceous earth.
  • the improved method primarily concerns the recovering of lost circulation which has been lost in a productive zone or stratum and that herein a temporary barrier is formed that prevents the escape of the drilling mud from the well bore into the zone l3 but that it does not prevent or impede flow of fluid in the opposite direction.
  • the present method is readily distinguished from other methods of recovering lost circulation wherein plugging or sealing materials are introduced into the circulation fluid which when deposited will form more or less permanent plugs or seals that not only retard or prevent the flow of drilling mud in a direction from the Well bore but also would equally prevent or retard the flow of fluid from the formation into the well bore.
  • the minimum screen size of the sand and gravel introduced should bear a definite relationship to the perforation size in the liner that is finally installed so that although the mud sheath and diatomaceous earth may enter the liner substantially all of the sand and gravel will be retained in the formation by the liner.
  • This sand and gravel, however, being screened and being relatively clean will form no substantial impediment to the entry of the wanted fluid into the well bore.
  • diatomaceous earth is preferably employed, other finely divided siliceous materials suitable for forming filter cakes can be substituted therefor such as for example the fines obtamed from the manufacture of expanded pearlite. Even pumice stone powder can be employed.
  • the diatomaceous earth or other siliceous material should be of a mesh size of around 100 or smaller. Ordinarily, diatomaceous earth has a particle size ranging from 275 mesh particles to 375 mesh particles. That is, the individual particle of diatomaceous earth are capable of passing through a. screen having 275 meshes per inch to 375 meshes per inch. Diatomaceous earth that is suitable for making filter cakes in various filtering processes is suitable for this process and when other siliceous materials are substituted for diatomaceous earth they should have comparable particle sizes.

Description

Jan. 27, 1953 A. ARMENTROUT ,77
METHOD OF RECOVERING LOST-CIRCULATION occuaamc IN PRODUCTIVE STRATA IN WELLS Filed Doc. 16. 1949,
MUD swear D/HTUMRCMS ffler aears;
erm/e L. aw
INVENTOR,
BY W M Patented Jan. 27, 1953 UNITED STATES PATENT OFFICE METHOD OF RECOVERING LOST CIRCU- LATION OCCURRING IN PRODUCTIVE STRATA IN WELLS This invention relates to a method of recovering lost circulation occurring in productive strata in the course of drilling wells and placing the well on production when the drilling has been completed.
In the course of drilling oil and gas wells it frequently occurs that the well bore passes through pervious strata including water sands so that the drilling mud or circulation fluid that is pumped down through the drill pipe and which returns to the surface between the drill pipe and the walls of the well passes into such pervious strata and becomes lost. Usually such strata are either non-productive or produce unwanted fluids and in recovering the lost circulation under such circumstances various remedial steps are taken to plug or seal such strata against the entry of circulation fluid. Various types of sealing materials have heretofore been used such as, for example, straw, cotton seed hulls, fragments of sponge rubber, and various types of self-hardening materials. These materials are carried by the escaping circulation fluid into the cracks and crevices and form plugs or seals that retard or prevent the loss of the circulation fluid. As a general rule the plugging material used under these circumstances forms an immovable barrier in the well which is not objectionable when the strata through which circulation has been lost is either non-productive or produces an unwanted fluid.
It frequently occurs, however, that circulation fluid is lost in a productive stratum traversed by the well bore. 'This may be due to cracks and crevices in such productive stratum or it may be due to the fact that the stratum is not only highly pervious but has a relatively low pressure. Under these circumstances if the sealing materials heretofore used in non-productive strata are employed the sealing material which forms an immovable plug or barrier preventing the escape of circulation fluid subsequently forms a plug or barrier against the entry of the wanted fluid into the well bore. A primary object of the present invention is to provide a method of recovering lost circulation where the circulation is lost in the productive stratum and wherein the plug or barrier formed will eflectively prevent the escape or loss of circulation fluid into the productive stratum but when the well is subsequently placed on production it will not prevent or impede the entry of the wanted fluid into the well bore. Stated in another manner, in accordance with the present invention the seal produced in the productive stratum is designed to prevent the loss therein of the circulation fluid used in drilling the well but it will not prevent or retard the flow of the wanted fluid in the reverse direction when the well is ultimately placed on production.
With the foregoing and other objects in view, which will be made manifest in the following detailed description and specifically pointed out in the appended claims, reference is had to the accompanying drawings for an illustrative embodiment of the invention, wherein:
Figure l is a diagrammatic view of apparatus employed in performing the present method;
Fig. 2 is a partial view in vertical section illustrating details of construction of the apparatus; and
Fig. 3 is a partial vertical section on a somewhat enlarged scale illustrating the manner in which the seal to prevent loss of circulation fluid is formed in the well.
Referring to the accompanying drawings wherein similar reference characters designate similar parts throughout, diagrammatically illustrated in Fig. 1 is a rotary well drilling apparatus wherein the drill pipe Ill having the bit I l is rotated by the rotary table I2. The drill pipe is illustrated as having passed through a productive stratum I3 which may be assumed to be capable of producing oil or gas and which has cracks or crevices therein through which the circulation fluid pumped down through the drill pipe becomes lost. The loss of circulation fluid may be due to the cracks or crevices in the productive stratum or it may be due to the fact that the productive stratum is highly pervious but has a low natural pressure. The conventional well drilling mud or circulation fluid is supplied to the drill pipe through a pump l4 and after being discharged from the drill pipe the circulation fluid is normally returned to the surface, passed over a conventional shaker screen and returned to a sump from which it is recycled through the pump [4. Between the pump [4 and the hose I5 that leads to the swivel at the top of the kelly Hi there is a manifold 11. Connected to this manifold there are one or more tanks i8 and 19, the outlets from which are connected through valves 20 and 2|, respectively, to the manifold. At the top of each tank there are hoppers 22 and 23 which are connected to the tops of the tanks throughvalves 24 and 25, respectively. Branch connections lead from the manifold I! to the tops of the tanks and are equipped with valves 26 and 21, respectively. The valves 28 and 29 are merely drain valves controlling outlets at the bottoms of the tanks whenever it is desired to empty the tanks without introducing their contents into the manifold. The manifold is preferably provided with a nozzle 30 through which the circulation fluid is discharged at high velocity so as to pick up and carry with the circulation fluid the solid material that is introduced into the manifold from the tanks I8 and I9.
It will be appreciated that only a single tank It might be employed but preferably two tanks are used and even more tanks may be employed if desired. Two tanks are employed so that while one tank is being emptied into the manifold I1 the other may be in the process of being refilled through its hopper. In the course of refilling a tank the outlet valve 20 Or 2| is closed and the pressure inlet valve 26 or 21 is also closed. Valves 24 or 25, as the case may be, are opened to empty the hopper into the tank. Thereafter the valves 24 or 25 are closed and the other valves are opened again to conduct pressure from the pump to the top of the tank and permit its contents to be discharged into the manifold.
In accordance with the present invention when it is suspected or determined that circulation fluid is being lost through the productive stratum I3 a substantial batch or batches of screened sand and gravel is discharged into the manifold followed closely by a batch of diatomaceous earth. The sand and gravel that is introduced into the manifold may have a particle size running as high as inch. However, the minimum size will ordinarily be that sand or gravel which will be caught on a screen having a mesh size of .065 inch. Whatever sand is capable of passing through a .065 inch screen is normally discarded. In some instances the minimum sand size may be somewhat larger. In the usual situation in recovering lost circulation in an oil well the sand and gravel is quickly fed to the manifold by using the tanks l8 and I9 consecutively so as to deliver the sand and gravel in batches of from 25 to 100 cu. ft. This sand and gravel is picked up by the circulation fluid pumped by the pump through the manifold and is quickly carried down through the drill pipe and discharged at the bit II. It is carried by the circulation fluid that is escaping into the formation I3 into the cracks, crevices or interstices forming a sand and gravel foundation for the diatomaceous earth that is supplied to the manifold immediately following the last batch. In the usual situation from 100 to 300 cu. ft. of diatomaceous earth is supplied to the manifold and carried down through the drill pipe. The diatomaceous earth that is discharged from the bit H is carried by the circulation fluid to the previously deposited sand and gravel and, in effect, forms a type of filter cake over the sand and gravel which will form a base or foundation for the ingredients in the circulation fluid or well drilling mud. Consequently in a given crevice in the formation l3 there will be first deposited a fill of sand and gravel over which there will be deposited diatomaceous earth on which the sheath of the constituents of the well drilling mud is deposited.
When the drilling of the well is completed the casing is normally installed and the perforated liner is installed opposite the producing stratum. The well may then be brought on production such as by bailing the well down. When the pressure in the well opposite the stratum I3 is less than the pressure existing in the stratum the wanted fluid will commence to flow from the stratum into the well bore. In so doing the sand and gravel fill being relatively clean will permit the fluid to flow therethrough. The mud sheath and the diatomaceous earth will be carried by the fluid into the well bore and as these are formed of very fine particles they may pass readily through the perforations of the liner into the liner and be removed from the well. The sand and gravel particles, being larger than the perforation size in the liner, will be retained in the well on the outside of the liner but form no serious impediment to the entry of the wanted fluid from the productive stratum into the well bore. In this manner it will be appreciated that where the circulation fluid is lost into the productive stratum the improved method temporarily seals the productive stratum against the entry of the circulation fluid thereto. 0n the other hand, when it is desired to have the wanted fluid in the productive stratum to flow in the opposite direction, that is, from the stratum into the well bore, the seal formed does not impede such flow.
The above described method may be employed whenever it is known or suspected that circulation fluid is being lost in the productive stratum. However, where conditions are such that lost circulation into the productive stratum is to be anticipated, I maintain sand and gravel in the circulation fluid at all times to the extent of about five to ten percent and observe the condition of the shaker screen and the sump at all times. If the sand and gravel is not returned to the shaker screen along with the circulation fluid this indicates, that the sand and gravel is being deposited in the well and if the level in the sump falls, indicating that circulation is being lost, I then quickly dump one or more batches of sand and gravel into the manifold I! by the apparatus illustrated and immediately follow the last batch with a substantial batch of diatomaceous earth.
It will be readily appreciated that the improved method primarily concerns the recovering of lost circulation which has been lost in a productive zone or stratum and that herein a temporary barrier is formed that prevents the escape of the drilling mud from the well bore into the zone l3 but that it does not prevent or impede flow of fluid in the opposite direction. To this extent the present method is readily distinguished from other methods of recovering lost circulation wherein plugging or sealing materials are introduced into the circulation fluid which when deposited will form more or less permanent plugs or seals that not only retard or prevent the flow of drilling mud in a direction from the Well bore but also would equally prevent or retard the flow of fluid from the formation into the well bore.
The minimum screen size of the sand and gravel introduced should bear a definite relationship to the perforation size in the liner that is finally installed so that although the mud sheath and diatomaceous earth may enter the liner substantially all of the sand and gravel will be retained in the formation by the liner. This sand and gravel, however, being screened and being relatively clean will form no substantial impediment to the entry of the wanted fluid into the well bore.
While diatomaceous earth is preferably employed, other finely divided siliceous materials suitable for forming filter cakes can be substituted therefor such as for example the fines obtamed from the manufacture of expanded pearlite. Even pumice stone powder can be employed. The diatomaceous earth or other siliceous material should be of a mesh size of around 100 or smaller. Ordinarily, diatomaceous earth has a particle size ranging from 275 mesh particles to 375 mesh particles. That is, the individual particle of diatomaceous earth are capable of passing through a. screen having 275 meshes per inch to 375 meshes per inch. Diatomaceous earth that is suitable for making filter cakes in various filtering processes is suitable for this process and when other siliceous materials are substituted for diatomaceous earth they should have comparable particle sizes.
Various changes may be made in the details of the construction without departing from the spirit and scope of the invention as defined by the appended claims.
I claim:
1. The method of recovering lost circulation in a. drilling well wherein the circulation has been lost into a productive stratum which consists of introducing into the circulation fluid screened sand and gravel so that it will be carried thereby to the interstices or fractures in the productive formation and immediately thereafter introducing into the circulation fluid diatomaceous earth so as to form a filter cake on the screened sand and gravel for the deposit thereon of the mud sheath produced by the circulation fluid.
2. The method of recovering lost circulation in a drilling well wherein the circulation has been lost into a productive stratum which consists of introducing into the circulation fluid screened sand and gravel having a minimum size larger than the size of the perforations in the liner subsequently to be installed in the well, thereafter introducing into the circulation fluid diatomaceous earth to form a filter cake for the deposit thereon of the mud sheath produced by the circulation fluid and on completion of the well installing the liner and bailing down the well causing the mud sheath and diatomaceous earth to enter the liner and be removed from the well and the sand and gravel to be retained in the 8 well by the liner whereby the sand and gravel left in the well will not impede the flow of fluid from the productive formation into the well.
3. The method of recovering lost circulation in a drilling well wherein the circulation has been lost into a productive stratum which consists of introducing into the circulation fluid sand and gravel so that it will be carried thereby into the interstices or fractures in the productive formation and immediately thereafter introducing into the circulation fluid finely divided siliceous material of a particle size finer than mesh so as to form a filter cake on the sand and gravel for the deposit thereon of the mud sheath produced by the circulation fluid,
ARTHUR L. ARMENTROUT.
REFERENCES CITED The following references are of record in the file of this patent:
UNITED STATES PATENTS Number Name Date 1,635,500 Potts July 12, 1927 1,807,082 Boynton May 26, 1931 2,094,316 Cross et al Sept. 28, 1937 2,139,929 Blow Dec. 13, 1938 2,214,366 Freeland et al Sept. 10, 1940 2,283,564 Means May 19, 1942 2,455,188 Oxford Nov. 30, 1948 OTHER REFERENCES Knapp, "Action of Mud-laden Fluids in Wells, Transactions of American Institute of Mining Engineers, vol. 69, pages 1076-1100, February 1923.
Parsons, "What Is Good Drilling Mud?" The Petroleum World and Oil Age, vol. 2'7, No. 7, July 1930, pages 79-82.
Gravel Packing of Liners, The Oil and Gas Journal, December 30, 1937, page 222.
Sidwell, "Trends in Combating Lost Circulation, World Oil, November 1949, pages 123, 124, 128 and 130.

Claims (1)

  1. 2. THE METHOD OF RECOVERING LOST CIRCULATION IN A DRILLING WELL WHEREIN THE CIRCULATION HAS BEEN LOST INTO A PRODUCTIVE STRATUM WHICH CONSISTS OF INTRODUCTING INTO THE CIRCULATION FLUID SCREENED SAND AND GRAVEL HAVING A MINIMUM SIZE LARGER THAN THE SIZE OF THE PERFORATIONS IN THE LINER SUBSEQUENTLY TO BE INSTALLED IN THE WELL, THEREAFTER INTRODUCING INTO THE CIRCULATION FLUID DIATOMACEOUS EARTH TO FROM A FILTER CAKE FOR THE DEPOSIT THEREON OF THE MUD SHEATH PRODUCED BY THE CIRCULATION FLUID AND ON COMPLETION OF THE WELL INSTALLING THE LINER AND BAILING DOWN THE WELL CAUSING THE MUD SHEATH AND DIATOMACEOUS EARTH TO ENTER THE LINER AND BE REMOVED FROMTHE WELL AND THE SAND AND GRAVEL TO BE RETAINED IN THE WELL BY THE LINER WHEREBY THE SAND AND GRAVEL LEFT IN THE WELL WILL NOT IMPEDE THE FLOW OF FLUID FROM THE PRODUCTIVE FORMATION INTO THE WELL.
US133387A 1949-12-16 1949-12-16 Method of recovering lost circulation occurring in production strata in wells Expired - Lifetime US2626779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US133387A US2626779A (en) 1949-12-16 1949-12-16 Method of recovering lost circulation occurring in production strata in wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US133387A US2626779A (en) 1949-12-16 1949-12-16 Method of recovering lost circulation occurring in production strata in wells

Publications (1)

Publication Number Publication Date
US2626779A true US2626779A (en) 1953-01-27

Family

ID=22458367

Family Applications (1)

Application Number Title Priority Date Filing Date
US133387A Expired - Lifetime US2626779A (en) 1949-12-16 1949-12-16 Method of recovering lost circulation occurring in production strata in wells

Country Status (1)

Country Link
US (1) US2626779A (en)

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2683690A (en) * 1952-09-26 1954-07-13 Arthur L Armentrout Material for recovering lost circulation in wells
US2811488A (en) * 1954-06-28 1957-10-29 Texas Co Lost circulation
US2836555A (en) * 1956-07-30 1958-05-27 Arthur L Armentrout Material for recovering lost circulation in wells
US3081828A (en) * 1960-07-05 1963-03-19 Thomas E Quick Method and apparatus for producing cuts within a bore hole
US3083765A (en) * 1960-10-28 1963-04-02 Archer W Kammerer Method and apparatus for conditioning bore holes
US3322214A (en) * 1963-12-26 1967-05-30 Phillips Petroleum Co Drilling method and apparatus
US3347316A (en) * 1964-10-26 1967-10-17 Shell Oil Co Method of treating an underground formation to prevent liquid loss to large cavities in a formation
US3486559A (en) * 1966-10-13 1969-12-30 Pan American Petroleum Corp Formation plugging
US3496902A (en) * 1968-04-24 1970-02-24 Atlantic Richfield Co Preventing lost circulation during earth borehole drilling
US4491414A (en) * 1982-06-22 1985-01-01 Petroleum Instrumentation & Technological Services Fluid mixing system
US4586825A (en) * 1982-06-22 1986-05-06 Asadollah Hayatdavoudi Fluid agitation system
US4944347A (en) * 1989-12-04 1990-07-31 Baker Hughes Incorporated Method and apparatus for direct high velocity preparation of completion/workover systems
US5078212A (en) * 1989-09-08 1992-01-07 Her Majesty The Queen In Right Of Canada, As Represented By The Minister Of Energy, Mines And Resources Emplacement of filter packs and seals for groundwater monitoring
US5213414A (en) * 1989-12-04 1993-05-25 Baker Hughes Incorporated Mixing apparatus
US20060011386A1 (en) * 2003-04-16 2006-01-19 Particle Drilling Technologies, Inc. Impact excavation system and method with improved nozzle
US20060191717A1 (en) * 2003-04-16 2006-08-31 Particle Drilling Technologies, Inc. Impact excavation system and method with two-stage inductor
US20080230275A1 (en) * 2003-04-16 2008-09-25 Particle Drilling Technologies, Inc. Impact Excavation System And Method With Injection System
US20090038856A1 (en) * 2007-07-03 2009-02-12 Particle Drilling Technologies, Inc. Injection System And Method
US7503407B2 (en) 2003-04-16 2009-03-17 Particle Drilling Technologies, Inc. Impact excavation system and method
US20090090557A1 (en) * 2007-10-09 2009-04-09 Particle Drilling Technologies, Inc. Injection System And Method
US20090126994A1 (en) * 2007-11-15 2009-05-21 Tibbitts Gordon A Method And System For Controlling Force In A Down-Hole Drilling Operation
US20090200080A1 (en) * 2003-04-16 2009-08-13 Tibbitts Gordon A Impact excavation system and method with particle separation
US20090205871A1 (en) * 2003-04-16 2009-08-20 Gordon Tibbitts Shot Blocking Using Drilling Mud
US20100155063A1 (en) * 2008-12-23 2010-06-24 Pdti Holdings, Llc Particle Drilling System Having Equivalent Circulating Density
US7798249B2 (en) 2003-04-16 2010-09-21 Pdti Holdings, Llc Impact excavation system and method with suspension flow control
US20100294567A1 (en) * 2009-04-08 2010-11-25 Pdti Holdings, Llc Impactor Excavation System Having A Drill Bit Discharging In A Cross-Over Pattern
US7997355B2 (en) 2004-07-22 2011-08-16 Pdti Holdings, Llc Apparatus for injecting impactors into a fluid stream using a screw extruder
US8037950B2 (en) 2008-02-01 2011-10-18 Pdti Holdings, Llc Methods of using a particle impact drilling system for removing near-borehole damage, milling objects in a wellbore, under reaming, coring, perforating, assisting annular flow, and associated methods
US20130213508A1 (en) * 2012-02-16 2013-08-22 Shannon Keith Latimer Fill material dispensing method and apparatus
WO2013043489A3 (en) * 2011-09-20 2014-04-17 Saudi Arabian Oil Company Permeable lost circulation drilling liner
WO2020142414A1 (en) * 2019-01-02 2020-07-09 ISOL8 (Holdings) Limited Expanding thermite reactions for downhole applications
WO2022036093A1 (en) * 2020-08-12 2022-02-17 Saudi Arabian Oil Company Porous lost circulation material for reservoir section
US11371301B2 (en) 2019-02-05 2022-06-28 Saudi Arabian Oil Company Lost circulation shape deployment
US11473396B2 (en) 2019-02-05 2022-10-18 Saudi Arabian Oil Company Lost circulation shapes

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1635500A (en) * 1925-10-14 1927-07-12 Thomas Blandford And Alfred Ge Process of cementation in the ground
US1807082A (en) * 1926-10-19 1931-05-26 Boynton Alexander Method of drilling wells
US2094316A (en) * 1936-03-06 1937-09-28 Kansas City Testing Lab Method of improving oil well drilling muds
US2139929A (en) * 1936-10-16 1938-12-13 Blow George Process of sealing the walls of wells while drilling same
US2214366A (en) * 1939-02-23 1940-09-10 Shell Dev Drilling fluid composition
US2283564A (en) * 1939-06-21 1942-05-19 William Carpenter Drilling mud
US2455188A (en) * 1946-02-25 1948-11-30 Sun Oil Co Drilling fluid

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1635500A (en) * 1925-10-14 1927-07-12 Thomas Blandford And Alfred Ge Process of cementation in the ground
US1807082A (en) * 1926-10-19 1931-05-26 Boynton Alexander Method of drilling wells
US2094316A (en) * 1936-03-06 1937-09-28 Kansas City Testing Lab Method of improving oil well drilling muds
US2139929A (en) * 1936-10-16 1938-12-13 Blow George Process of sealing the walls of wells while drilling same
US2214366A (en) * 1939-02-23 1940-09-10 Shell Dev Drilling fluid composition
US2283564A (en) * 1939-06-21 1942-05-19 William Carpenter Drilling mud
US2455188A (en) * 1946-02-25 1948-11-30 Sun Oil Co Drilling fluid

Cited By (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2683690A (en) * 1952-09-26 1954-07-13 Arthur L Armentrout Material for recovering lost circulation in wells
US2811488A (en) * 1954-06-28 1957-10-29 Texas Co Lost circulation
US2836555A (en) * 1956-07-30 1958-05-27 Arthur L Armentrout Material for recovering lost circulation in wells
US3081828A (en) * 1960-07-05 1963-03-19 Thomas E Quick Method and apparatus for producing cuts within a bore hole
US3083765A (en) * 1960-10-28 1963-04-02 Archer W Kammerer Method and apparatus for conditioning bore holes
US3322214A (en) * 1963-12-26 1967-05-30 Phillips Petroleum Co Drilling method and apparatus
US3347316A (en) * 1964-10-26 1967-10-17 Shell Oil Co Method of treating an underground formation to prevent liquid loss to large cavities in a formation
US3486559A (en) * 1966-10-13 1969-12-30 Pan American Petroleum Corp Formation plugging
US3496902A (en) * 1968-04-24 1970-02-24 Atlantic Richfield Co Preventing lost circulation during earth borehole drilling
US4491414A (en) * 1982-06-22 1985-01-01 Petroleum Instrumentation & Technological Services Fluid mixing system
US4586825A (en) * 1982-06-22 1986-05-06 Asadollah Hayatdavoudi Fluid agitation system
US5078212A (en) * 1989-09-08 1992-01-07 Her Majesty The Queen In Right Of Canada, As Represented By The Minister Of Energy, Mines And Resources Emplacement of filter packs and seals for groundwater monitoring
US4944347A (en) * 1989-12-04 1990-07-31 Baker Hughes Incorporated Method and apparatus for direct high velocity preparation of completion/workover systems
US5213414A (en) * 1989-12-04 1993-05-25 Baker Hughes Incorporated Mixing apparatus
US7798249B2 (en) 2003-04-16 2010-09-21 Pdti Holdings, Llc Impact excavation system and method with suspension flow control
US8342265B2 (en) 2003-04-16 2013-01-01 Pdti Holdings, Llc Shot blocking using drilling mud
US7398838B2 (en) * 2003-04-16 2008-07-15 Particle Drilling Technologies, Inc. Impact excavation system and method with two-stage inductor
US20080230275A1 (en) * 2003-04-16 2008-09-25 Particle Drilling Technologies, Inc. Impact Excavation System And Method With Injection System
US7503407B2 (en) 2003-04-16 2009-03-17 Particle Drilling Technologies, Inc. Impact excavation system and method
US20090200080A1 (en) * 2003-04-16 2009-08-13 Tibbitts Gordon A Impact excavation system and method with particle separation
US20090205871A1 (en) * 2003-04-16 2009-08-20 Gordon Tibbitts Shot Blocking Using Drilling Mud
US7757786B2 (en) 2003-04-16 2010-07-20 Pdti Holdings, Llc Impact excavation system and method with injection system
US20060191717A1 (en) * 2003-04-16 2006-08-31 Particle Drilling Technologies, Inc. Impact excavation system and method with two-stage inductor
US7909116B2 (en) 2003-04-16 2011-03-22 Pdti Holdings, Llc Impact excavation system and method with improved nozzle
US8162079B2 (en) 2003-04-16 2012-04-24 Pdti Holdings, Llc Impact excavation system and method with injection system
US7793741B2 (en) 2003-04-16 2010-09-14 Pdti Holdings, Llc Impact excavation system and method with injection system
US20060011386A1 (en) * 2003-04-16 2006-01-19 Particle Drilling Technologies, Inc. Impact excavation system and method with improved nozzle
US8113300B2 (en) 2004-07-22 2012-02-14 Pdti Holdings, Llc Impact excavation system and method using a drill bit with junk slots
US7997355B2 (en) 2004-07-22 2011-08-16 Pdti Holdings, Llc Apparatus for injecting impactors into a fluid stream using a screw extruder
US20090038856A1 (en) * 2007-07-03 2009-02-12 Particle Drilling Technologies, Inc. Injection System And Method
US20090090557A1 (en) * 2007-10-09 2009-04-09 Particle Drilling Technologies, Inc. Injection System And Method
US7987928B2 (en) 2007-10-09 2011-08-02 Pdti Holdings, Llc Injection system and method comprising an impactor motive device
US20090126994A1 (en) * 2007-11-15 2009-05-21 Tibbitts Gordon A Method And System For Controlling Force In A Down-Hole Drilling Operation
US7980326B2 (en) 2007-11-15 2011-07-19 Pdti Holdings, Llc Method and system for controlling force in a down-hole drilling operation
US8037950B2 (en) 2008-02-01 2011-10-18 Pdti Holdings, Llc Methods of using a particle impact drilling system for removing near-borehole damage, milling objects in a wellbore, under reaming, coring, perforating, assisting annular flow, and associated methods
US8186456B2 (en) 2008-02-01 2012-05-29 Pdti Holdings, Llc Methods of using a particle impact drilling system for removing near-borehole damage, milling objects in a wellbore, under reaming, coring, perforating, assisting annular flow, and associated methods
US8353367B2 (en) 2008-02-01 2013-01-15 Gordon Tibbitts Methods of using a particle impact drilling system for removing near-borehole damage, milling objects in a wellbore, under reaming, coring perforating, assisting annular flow, and associated methods
US8353366B2 (en) 2008-02-01 2013-01-15 Gordon Tibbitts Methods of using a particle impact drilling system for removing near-borehole damage, milling objects in a wellbore, under reaming, coring, perforating, assisting annular flow, and associated methods
US20100155063A1 (en) * 2008-12-23 2010-06-24 Pdti Holdings, Llc Particle Drilling System Having Equivalent Circulating Density
US20100294567A1 (en) * 2009-04-08 2010-11-25 Pdti Holdings, Llc Impactor Excavation System Having A Drill Bit Discharging In A Cross-Over Pattern
US8485279B2 (en) 2009-04-08 2013-07-16 Pdti Holdings, Llc Impactor excavation system having a drill bit discharging in a cross-over pattern
US9353584B2 (en) 2011-09-20 2016-05-31 Saudi Arabian Oil Company Permeable lost circulation drilling liner
WO2013043489A3 (en) * 2011-09-20 2014-04-17 Saudi Arabian Oil Company Permeable lost circulation drilling liner
US9995108B2 (en) 2011-09-20 2018-06-12 Saudi Arabian Oil Company Permeable lost circulation drilling liner
US10378307B2 (en) 2011-09-20 2019-08-13 Saudi Arabian Oil Company Permeable lost circulation drilling liner
US20130213508A1 (en) * 2012-02-16 2013-08-22 Shannon Keith Latimer Fill material dispensing method and apparatus
WO2020142414A1 (en) * 2019-01-02 2020-07-09 ISOL8 (Holdings) Limited Expanding thermite reactions for downhole applications
US11371301B2 (en) 2019-02-05 2022-06-28 Saudi Arabian Oil Company Lost circulation shape deployment
US11473396B2 (en) 2019-02-05 2022-10-18 Saudi Arabian Oil Company Lost circulation shapes
WO2022036093A1 (en) * 2020-08-12 2022-02-17 Saudi Arabian Oil Company Porous lost circulation material for reservoir section
US11352545B2 (en) 2020-08-12 2022-06-07 Saudi Arabian Oil Company Lost circulation material for reservoir section
US11739249B2 (en) 2020-08-12 2023-08-29 Saudi Arabian Oil Company Lost circulation material for reservoir section

Similar Documents

Publication Publication Date Title
US2626779A (en) Method of recovering lost circulation occurring in production strata in wells
US7409990B1 (en) Downhole mixing of encapsulated plug components for abandoning a well
US3675717A (en) Method of gravel packing wells
US5964289A (en) Multiple zone well completion method and apparatus
US2693854A (en) Formation of zones of high permeability in low permeability formations
US6651741B2 (en) Method of increasing productivity of oil, gas and hydrogeological wells
US4232740A (en) High temperature stable sand control method
US2648522A (en) Method of recovering lost circulation in wells
US2356769A (en) Washing gravel out of perforate well casings
CN110529089B (en) Repeated fracturing method for open hole horizontal well
US2214366A (en) Drilling fluid composition
US3219111A (en) Method for stopping loss of circulating fluid in well bores
Durrett et al. Seeking a solution to sand control
US2213987A (en) Screen and gravel washing device and method
US2083625A (en) Method of depositing foraminate beds around well casings
US4397353A (en) Method for vertical fracture growth control
US3548935A (en) Apparatus for development and completion of wells
US2326577A (en) Removal of mud cake in casing cement jobs
US3743021A (en) Method for cleaning well perforations
US3428121A (en) Permeable cementing composition and method
US2205422A (en) Method for forming a gravel pack in a well bore
USRE27227E (en) Permeable cementing composition and method
US2054353A (en) Method and apparatus for shutting off water intrusion through perforated casings
US2109337A (en) Amorphous silica drilling fluid
US3583489A (en) Well cleaning method using foam containing abrasives