US2244255A - Well clearing system - Google Patents
Well clearing system Download PDFInfo
- Publication number
- US2244255A US2244255A US309594A US30959439A US2244255A US 2244255 A US2244255 A US 2244255A US 309594 A US309594 A US 309594A US 30959439 A US30959439 A US 30959439A US 2244255 A US2244255 A US 2244255A
- Authority
- US
- United States
- Prior art keywords
- tubing
- well
- congealed
- bodies
- fluid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B36/00—Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
- E21B36/04—Heating, cooling, insulating arrangements for boreholes or wells, e.g. for use in permafrost zones using electrical heaters
Definitions
- This invention has to do generally with the removing of congealed paraffinic and asphaltic bodies in oil wells, and relates particularly to an improved system for electrically heating wells whereby it is made possible to eiectively remove such congealed bodies at whatever location they may occur in the well.
- This application is a continuation-impart of my abandoned copending application Ser. No. 251,606, namelyd January 18, 1939, on Well clearing means.
- the apparatus features of the invention are claimed in a copending application, Ser. No, 337,031, ⁇ i'lled May 24, 1940, on Apparatus for clearing wells.
- My primary object is to provide an improved and, in fact, characteristically diierent type of well heating system whereby it is possible to remove congealed bodies from any location or locations in which they may occur within the Well or iiow tubing, and to so control the heating as .to be able to limit or 'confine the application of heat to particular or pre-determined portions of the well or tubing where heating is necessary.
- heat is supplied to the well fluid by passing electrical current through a conductor run in the well and directly contacting the well fluid.
- This conductor ordinarily and preferably comprises simply the usual ow tubing, which is of uniform thickness and conductivity so that a given amount of specially generated or transformed electric current of high amperage and suiiicient voltage may be introduced to permit a necessary pre-determined degree of heat to be maintained throughout the heated length of the tubing, and which is provided with insulators to maintain the tubing in spaced relation to the wall of the well or casing. Provision is made for heating only a portion and variable length of the tubing from a point above its lower end, by suitable means such as a conductor or adapter carried by the tubing and engaging the wall of the well, the position of the conductor being adjustable and variable longitudinally of the tubing.
- the heated section of the tubing may be confined and limited to rthe necessary A section or depth of the Well that requires heating.
- This system has the further advantage of permitting less than the entire length of the tubing to be heated, and therefore with a given potential of current, which is variably controlled,
- the invention is also distinguished from prior well heating systems in that it is operable in conjunction with any known method'of production and especially a well pump carried by the tubing.
- the pump serves a purpose in addition to its usual function, of providing valve means for retaining pressure in the well, and alternately, it also enables production to be maintained, if desired, While the well is being heated, due to the fact that the entire length of the tubing above the adapter may be heated and uniform heating of the traveling fluid maintained until the iiuid is exhausted at the surface.
- the Texas Panhandle has many wells in which the formation of parafne is considered to be one of the major production problems.
- the last string of casing may be set at a point approximating 2700 feet and then the well is drilled to a total depth ranging upwards from 180 feet below the casing.
- the tubing string is run toa point within say 5 feet of the bottom of the hole, and thus to a depth
- the present system may be used to advantage not only for the removal of paraiiine but also for purposes of restoring production in wells that have ceased to iiow.
- the uid shows definite heat losses as it is pumped through these points of low ⁇ temperature, and further heat losses are caused by the expansion of gases carried by the fluid at elevations of reduced pressures, so that the temperature of the fluid drops below that of the bottom hole temperature and paraiiine begins to congeal in the tubing.
- the iiuid level in the well may extend up into the cooler zones so that the fluid toward the top may be conbottom of the hole.
- Darafline will collect on the outside of the tubing from the iiuid level down to that point at which the iiuid again becomes warm enough to -keep the parane in solution. Under such conditions it is necessary to be able to place the conductor at any point either above or below the fluid level, and either Within the casing string, or below it, in
- Fig. 1 is a vertical section showing the upper portion of a cased well containing the flow pipe equipped with insulators and connected with a source of electrical current;
- Fig. 2 is a lower continuation of Fig. 1 showing the bottomA portion of the tubing string and the adapter or conductor;
- Fg.l3 is a view similar to Fig. 2 showing the tubing and adapter lowered in open hole below the casing;
- Fig. 4 is an enlarged cross section on line 4--4 of Fig. 1;
- Fig. 5 is'an enlarged cross section on line 5-5 of Fig. 2.
- the well bore I is shown to contain lthe usual casing II carrying at its lower end a screen or perforated liner I2.
- the upper end ofthe casing carries the usual head I3 which may have any suitable number and arrangement of kfluid connections shown typically as the valved lines Ill and I5.
- Lowered within the casing is the usual tubing string I6 which may be supported on the casing head I3 by any of the usual forms of tubing hangers, as for example the conventionally illustrated type comprising a flange II receiving the tubing coupling I8 and resting on an annulus I9- of suitable electrical insulating mate' rial within the upper end I3a. of the casing head.
- the tubing I6 carries at its lower end the usual well pump generally indicated at20 and shown typically to comprise a barrel 2I connected to the tubing by coupling 22 and having at its lower end .a strainer 23 below the ball check foot valve denoted generally at 24.
- the pump barrel 2I contains the ordinary tubular plunger 25 carrying the downwardly seating ball check valve 26, the plunger being operated by the usual rods 21 extended upwardly through the tubing to the ground surface.
- any suitable means may be employed to maintain the tubing I6 in spaced and electrically insulatedprelation to the wall of the casing II or the wall 28 of the well bore where the tubing extends down in open hole as shown in Fig. 3.
- the latter is shown to carry longitudinally spaced insulators 29 each comprising a sleeve 30 of rubber or other suitable insulating material placed about and receiving within its interior recess 3I the tubing coupling 32.
- the ends of the insulator sleeve may be beveled as at 33 to facilitate movement past irregularities in the well, and the sleeve is provided with suitable openings such as continuously extending, circularly spaced passages 34 to permit upward flow and escape of gases past the insulators within the space 35 between the tubing and casing or well bore.
- any suitable source such as avariably'controlled motor generator unit or specially built and variably controlled transformer conventionally illustrated at 36 and connected by lead wire 31 with the tubing above the casing head I3, as illustrated.
- the opposite pole of the generator may be connected'with the casing I I through the lead wire shown at 38.
- 'I'he vertical extent of the electrical circuit through the tubing, and therefore the length of tubing heated by the current is determined by the location of an adapter or electrical connection generally indicated at 3Q, carried by the tubing and engageable with the casing or well bore, depending upon the location ofthe adapter.
- any suitable means or attachment may be employed for maintainingan adjustably variable electrical connection between the tubing and the wall of the well.
- the adapter 39 is shown to comprise a plurality of bowed springs 40 having their upper ends 40a seated and secured within recesses 4I of coupling 32a, the lower ends 40h of the lsprings similarly being secured to a sleeve 42 that is slidable longitudinally on the tubing to accommodate Varying expansion and contraction of the springs as they pass through different diameter portions of the well bore.
- the adapter may be located at any position on the tubing intermediate its upper and lower ends and with reference to the well itself, it may be positioned at substantially the liquid level in the well, or any desired distance above or below that level, all depending upon the location of the congealed paraflinic or asphaltic bodies in the Well at the outside of the tubing, as explained in the introductory discussion. t may be ⁇ mentioned that in the majority of instances the adapter will be positioned a substantial distance above the lower end of the tubing or pump.
- the heated length of the tubing may be confined to within the well casing il, for example the upper section of the tubing shown above the adapter in Figs. 1 and 2. or the heated length of tubing may extend any desired distance within the unlined well bore 28 below the casing, as illustrated in Fig. 3.
- the adapter heats that section of tubing and produces adirect transference of heat from the tube to the surrounding well fluid, suiicient to raise the temperature of the fluids both inside and outside the tubing to melt the congealed bodies and thus effect their removal fromA the zones being heated.
- the heating may serve not only to remove congealed bodies in the well, but also to free the formation of clogging bodies and thereby increase production.
- check valve 24 serves to support within the tubing a column of fluid that may extend any distance up to the ground surface, and above the level of liquid standing in the well, the liquid ⁇ column in the tubing thus providing, in effect, a hydrostatic back pressure which must be overcome by the pressure in the well before further flow into the, tubing will occur.
- the fixed resistance in order to gain the required amperage, that the voltage could not be controlled or properly insulated within the tubing string.
- high voltages would arc across and
- the tubing may be heated to around 120 F. by using a current of 50 volts and 750 amperes, or 37,500 watts, for a period of 35 to 40 minutes.
- a properly wound transformer may be used, instead of a generator unit, to supply current at relatively high amperage and low voltage, as indicated.
Description
l. LOOMAN WELL CLEARING SYSTEM June 3, 1941.
Original Filed Jan. 18, 1959 2 Sheets-Sheet 1 EEE .June 3, 1941. l. c. LooMAN WELL CLEARING SYSTEM Original Filed Jan. 18, 1959 2 Sheets-Sheet 2 Patented June 3, 1941 2,244,255 WELL CLEARING SYSTEM Iris C. Looman, Borger, Tex., assigner to Electrical Treating Company, Dallas, Tex., a corporation of Texas Original application January 18, 1939, Serial Nc.
251,606. Divided and this application December 16, 1939, Serial No. 309,594
6 Claims.
This invention has to do generally with the removing of congealed paraffinic and asphaltic bodies in oil wells, and relates particularly to an improved system for electrically heating wells whereby it is made possible to eiectively remove such congealed bodies at whatever location they may occur in the well. This application is a continuation-impart of my abandoned copending application Ser. No. 251,606, iiled January 18, 1939, on Well clearing means. The apparatus features of the invention are claimed in a copending application, Ser. No, 337,031, `i'lled May 24, 1940, on Apparatus for clearing wells.
Heretofore it has been proposed Ato electrically heat wells interiorally, or to so heat the production fluid Within the ow pipe or tubing, by the use of various specific forms of heating apparatus and for various particular purposes. In the comparatively early development of the art it was proposed to heat the uid in the bottom of a Well by an electrically energized heater sus-l pended on a pipe or cable, and in at least one instance to supply electric current to the heater through a suspension means without the latter however being itself utilized as a heating element. These methods in which heating elements have been used are generally, or to the best of my knowledge wholly impractical and ineilicient because it has been necessary to confine the hea-ting action to a very limited space. Consequently it has not been possible to heat enough uid so that the required temperature may be maintained as the fluid passes through the low temperature zones considerable distances above the heating element, Where it is found that because of the temperature drop the substances begin to congeal. And, further, such devices are unsuited to my purposes in that all of the heat concentration is Within such a short space that it is impossible to heat the uid at that point sufficiently to cause the uid to maintain the desired temperatures in the normally cooler zonesabove, as the fluid passes upwardly through them or to attempt to do so Without over-heating the oil or causing congealed bodies to become so plastic as to have excessive adherence to the tubing at the high temperatures. To lattempt to supply locally all the heat necessary to elevate the fluid temperatures in other parts of thewell,
above the melting or softening point of the con-v gealed' bodies; would also involve dangerously overheating the tubing itself. Another proposal has been to heat the well uid being discharged through the tubing by an electrical-conductor run down within and spaced from the tubing.
iiuids. While perhaps beingsuitable as a means of melting or removing meltable congealed bodies in the bottom of the well or within the flow tubing, such prior systems are not adaptable, and insofar as I know have never been attempted to be used, for the purpose of removing accumula` tions of congealed parainic and asphaltic bodies from any or all the various locations where they may occur in a well, and. from which these bodies must be removed if satisfactory production and operating conditions are to be maintained.
` My primary object is to provide an improved and, in fact, characteristically diierent type of well heating system whereby it is possible to remove congealed bodies from any location or locations in which they may occur within the Well or iiow tubing, and to so control the heating as .to be able to limit or 'confine the application of heat to particular or pre-determined portions of the well or tubing where heating is necessary. In accordance with the invention, heat is supplied to the well fluid by passing electrical current through a conductor run in the well and directly contacting the well fluid. This conductor ordinarily and preferably comprises simply the usual ow tubing, which is of uniform thickness and conductivity so that a given amount of specially generated or transformed electric current of high amperage and suiiicient voltage may be introduced to permit a necessary pre-determined degree of heat to be maintained throughout the heated length of the tubing, and which is provided with insulators to maintain the tubing in spaced relation to the wall of the well or casing. Provision is made for heating only a portion and variable length of the tubing from a point above its lower end, by suitable means such as a conductor or adapter carried by the tubing and engaging the wall of the well, the position of the conductor being adjustable and variable longitudinally of the tubing. By positioning the conductor with proper relation to the pre-determined location of the congealed bodies to -be melted in the well, the heated section of the tubing may be confined and limited to rthe necessary A section or depth of the Well that requires heating. This system has the further advantage of permitting less than the entire length of the tubing to be heated, and therefore with a given potential of current, which is variably controlled,
' order to meet all the requirements.
the degree of heat necessary is conned to that section of the tubing through which the current is passed and eliminates the possibility of intense or excessive heating.-
The invention is also distinguished from prior well heating systems in that it is operable in conjunction with any known method'of production and especially a well pump carried by the tubing. As will appear later, the pump serves a purpose in addition to its usual function, of providing valve means for retaining pressure in the well, and alternately, it also enables production to be maintained, if desired, While the well is being heated, due to the fact that the entire length of the tubing above the adapter may be heated and uniform heating of the traveling fluid maintained until the iiuid is exhausted at the surface.
The advantages of the invention willperhaps be better appreciated by referring briefly to illustrative conditions that have been encountered in actual operations, and the manner in which the present system has operated to improve them. For example, the Texas Panhandle has many wells in which the formation of parafne is considered to be one of the major production problems. In these wells the last string of casing may be set at a point approximating 2700 feet and then the well is drilled to a total depth ranging upwards from 180 feet below the casing. The tubing string is run toa point within say 5 feet of the bottom of the hole, and thus to a depth The present system may be used to advantage not only for the removal of paraiiine but also for purposes of restoring production in wells that have ceased to iiow. In many instances parafline congeals in the tubing to the extent that it has been necessary to run a parafne knife or to use chemicals. Frequently the bottom hole gas pressure is overcome by the hydrostatic presconsiderably below`the casing. Fluid levels are usually at varying-points up to 1500 feet. In most cases, the bottom hole temperatures are suflicient to keep the parafline in solution, but as the fluid is being pumped through the tubing, it passes through locations in the well at which the temperatures are considerably lower than bottom hole temperature. These colderzones may be below the usual fluid level or they may be above it. The uid shows definite heat losses as it is pumped through these points of low` temperature, and further heat losses are caused by the expansion of gases carried by the fluid at elevations of reduced pressures, so that the temperature of the fluid drops below that of the bottom hole temperature and paraiiine begins to congeal in the tubing. Also it is often found that the iiuid level in the well may extend up into the cooler zones so that the fluid toward the top may be conbottom of the hole. In such cases, when the Well is started pumping andthe fluid level is lowered, Darafline will collect on the outside of the tubing from the iiuid level down to that point at which the iiuid again becomes warm enough to -keep the parane in solution. Under such conditions it is necessary to be able to place the conductor at any point either above or below the fluid level, and either Within the casing string, or below it, in
It is also found that when some wells l are pumped from time to timeand their normal fluid levels are depressed, the expansion of gases liberated and escaping from the formation will lower .the temperature of the remaining fluid in the Well and cause a settling out of parafline ir`i\the formation. l:By properly setting the conductor above the bottom of the tubing string it is possible to heat the remaining iiuids in the hole to a temperature suiiicient to -re-dissolve the congealed material, and thereby clean the surfaceof lthe formation and allow the paraine tn .be removed from the well bore by the method of production being used.
l5o siderably lower in temperature than that at they sure of an accumulated column of fluid so that the well 'ceases to iiow and it is necessary to use a swab or compressor, or some other artificial means for causing the well to flow until it becomes live enough to produce of its own accord. These usual artificial methods require considerable time, special equipment, and are at best expensive. By installing the conductor of my system some distance below the top of the fluid level andlprovlding a standing valve in the tubing string to permit upward flow of the uid and gas but prevent downward flow, and then by heating the tubing and thereby generating gas from the fluid in the well, the expansion of the confined gases between the casing and tubing caused by the heat creates a downward pressure on the well liquid, giving somewhat the same effect as a compressor or swab, sufficient to cause the well to iiow. At the same time I eliminate the accumulated paraine much more cheaply and efficiently than. by the usual chemical, or parafiine knife procedure.
In some Oklahoma and other fields a very bad paraine condition is experienced both inside and outside the tubing. The outside accumulation of parafline is caused by the lowering of the fluid in the hole, and cooling as a result of the expansion of gas liberated from the fluid. The accumulation of paraiiine between the casing and tubing is in many cases so great that it becomes necessary to remove the tubing from the hole and spend weeks and even months with cable tools cleaning or removing the parailine from the casing. By placing the adapter well in the bottom of the hole at proper depth it is easily possible to heat the tubing sufficiently to raise the temperature of the fluid in the hole to re-dissolve the congealed paraine and ,permit it to be pumped, flowed, or removed from the hole by any suitablemethod. Ordinarily, it is unnecessary at any time to heat the tubing string above F. in
rorder to accomplish the Vdesired result. This amount of heat is in no way detrimental to the tubing or to the fluids, but is suiiicient to cause an enormous generation of gas.
All the above mentioned features and objects of the invention, as well as the details of a typical and illustrative embodiment thereof, will be understood to better advantage from the description to follow. Throughout the description reference-is had to the accompanying drawings in which:
Fig. 1 is a vertical section showing the upper portion of a cased well containing the flow pipe equipped with insulators and connected with a source of electrical current;
Fig. 2 is a lower continuation of Fig. 1 showing the bottomA portion of the tubing string and the adapter or conductor;
Fg.l3 is a view similar to Fig. 2 showing the tubing and adapter lowered in open hole below the casing;
Fig. 4 is an enlarged cross section on line 4--4 of Fig. 1; and
Fig. 5 is'an enlarged cross section on line 5-5 of Fig. 2.
Referring first to Figs. 1 and 2 of the drawings, ,4
the well bore I is shown to contain lthe usual casing II carrying at its lower end a screen or perforated liner I2. The upper end ofthe casing carries the usual head I3 which may have any suitable number and arrangement of kfluid connections shown typically as the valved lines Ill and I5. Lowered within the casing is the usual tubing string I6 which may be supported on the casing head I3 by any of the usual forms of tubing hangers, as for example the conventionally illustrated type comprising a flange II receiving the tubing coupling I8 and resting on an annulus I9- of suitable electrical insulating mate' rial within the upper end I3a. of the casing head. The tubing I6 carries at its lower end the usual well pump generally indicated at20 and shown typically to comprise a barrel 2I connected to the tubing by coupling 22 and having at its lower end .a strainer 23 below the ball check foot valve denoted generally at 24. The pump barrel 2I contains the ordinary tubular plunger 25 carrying the downwardly seating ball check valve 26, the plunger being operated by the usual rods 21 extended upwardly through the tubing to the ground surface. f
Any suitable means may be employed to maintain the tubing I6 in spaced and electrically insulatedprelation to the wall of the casing II or the wall 28 of the well bore where the tubing extends down in open hole as shown in Fig. 3. As typical means for so spacing and electrically insulating the tubing, the latter is shown to carry longitudinally spaced insulators 29 each comprising a sleeve 30 of rubber or other suitable insulating material placed about and receiving within its interior recess 3I the tubing coupling 32. The ends of the insulator sleeve may be beveled as at 33 to facilitate movement past irregularities in the well, and the sleeve is provided with suitable openings such as continuously extending, circularly spaced passages 34 to permit upward flow and escape of gases past the insulators within the space 35 between the tubing and casing or well bore.
Electrical current is supplied to the tubing I6 from any suitable source, such as avariably'controlled motor generator unit or specially built and variably controlled transformer conventionally illustrated at 36 and connected by lead wire 31 with the tubing above the casing head I3, as illustrated. The opposite pole of the generator may be connected'with the casing I I through the lead wire shown at 38. 'I'he vertical extent of the electrical circuit through the tubing, and therefore the length of tubing heated by the current is determined by the location of an adapter or electrical connection generally indicated at 3Q, carried by the tubing and engageable with the casing or well bore, depending upon the location ofthe adapter. Again, any suitable means or attachment may be employed for maintainingan adjustably variable electrical connection between the tubing and the wall of the well. As typical, the adapter 39 is shown to comprise a plurality of bowed springs 40 having their upper ends 40a seated and secured within recesses 4I of coupling 32a, the lower ends 40h of the lsprings similarly being secured to a sleeve 42 that is slidable longitudinally on the tubing to accommodate Varying expansion and contraction of the springs as they pass through different diameter portions of the well bore. Springs 40 frictionally engage the wall of the well to maintain an electrical connection from the tubing and the adapter may be located at any position on the tubing intermediate its upper and lower ends and with reference to the well itself, it may be positioned at substantially the liquid level in the well, or any desired distance above or below that level, all depending upon the location of the congealed paraflinic or asphaltic bodies in the Well at the outside of the tubing, as explained in the introductory discussion. t may be `mentioned that in the majority of instances the adapter will be positioned a substantial distance above the lower end of the tubing or pump.
As previously observed, the heated length of the tubing may be confined to within the well casing il, for example the upper section of the tubing shown above the adapter in Figs. 1 and 2. or the heated length of tubing may extend any desired distance within the unlined well bore 28 below the casing, as illustrated in Fig. 3. In either instance, passage of current through the tubing above, the adapter heats that section of tubing and produces adirect transference of heat from the tube to the surrounding well fluid, suiicient to raise the temperature of the fluids both inside and outside the tubing to melt the congealed bodies and thus effect their removal fromA the zones being heated. Where the tubing and adapter are run in the unlined hole with the formation engaged by the adapter being used to complete the circuit as in Fig. 3, the heating may serve not only to remove congealed bodies in the well, but also to free the formation of clogging bodies and thereby increase production.
It will be understood that the described h?- ingv operations may be carried on either wfile the well-is being pumped, or when pumping has A stopped, at any suitable intervall and for lengths have previously referred to the fact'that heating of the well fluids in accordance with the present system may be employed to develop pressure within space 35 between the tubing and casing to facilitate downward displacement of the melted bodies vto higher temperature zones and' thence to the lower end of the tubing or pump for removal from the well in the production stream. Capacity' for such pressure development is inherent in the system for the reason that check valve 24 serves to support within the tubing a column of fluid that may extend any distance up to the ground surface, and above the level of liquid standing in the well, the liquid` column in the tubing thus providing, in effect, a hydrostatic back pressure which must be overcome by the pressure in the well before further flow into the, tubing will occur.
It is important that the source 0f current supply have certain power characteristics for proper and most efficient heating of the tubing, A
lthe effect would be uncontrollable.
. the fixed resistance in order to gain the required amperage, that the voltage could not be controlled or properly insulated within the tubing string. In the small spaces between the tubing and casing, high voltages would arc across and To obtain current of desirable high amperage and low voltage, I use a variably controlled generating unit or transformer, of which the designation at 36 may be taken as illustrative, capable of supplying relatively high amperage 'and low voltage current Within the ranges required for all operating conditions. To illustrate, with the adapter set at 1500 feet on 2 inch tubing, the tubing may be heated to around 120 F. by using a current of 50 volts and 750 amperes, or 37,500 watts, for a period of 35 to 40 minutes. As will be understood, where a source of alternating current is available, a properly wound transformer may be used, instead of a generator unit, to supply current at relatively high amperage and low voltage, as indicated.
It will\be understood that the drawings are to be regarded merely as typical and illustrative, and that various changes and modifications may .be made Without departure from the invention in its intended spirit and scope.
I claim:
1. 'I'he methodof clearing congealed parafne or asphaltic bodies within an oil well from which production is taken through the usual ow tubing lowered deep in the well and directly exposed to the fluid therein, which comprises passing through a continuous length of the exposed ow Y tubing extending downwardly from near the top of the well -to the location of said congealed bodies, electric current of suilciently high arnperage to heat said length of the tubing to a temperature sufiicient to melt said congealed bodies in the well.
2. The method of clearing 'congealed'parafne or asphaltic bodies within an oil well from which production is taken through the usual owtubing lowered deep in the well and directly exposed to the fluid therein which comprises passing through a continuous length of the exposed flow tubing extending downwardly from near the top of the Well to the location of said congealed bodies and to a depth above the liquid level in the well outside the tubing, electric current of suiciently high amperage to heat said length of the tubing to a temperature in the neighborhood of 120 F., at which said congealed bodies will melt.
3. The method of clearing congealed parailine or asphaltlc bodies within an oil well from which production is taken through the usual flow tubing lowered deep in the well and directly exposed to the iiuid therein, which comprises passing through a continuous length of the exposed ow tubing extending downwardly from near the top of the well to the location of said congealed bodies, electric current of suflciently high amperage to heat said length of the tubing to a temperature suflicient to melt said congealed bodies in the well, and substantially terminating the passage of the electric current at an intermediate portion of the tubing determined in accordance with the locationof said congealed bodies whereby the length of the tubing heated to a melting temperature does not substantially exceed a length necessary to melt said congealed bodies.
4. 'Ihe method of clearing congealed paraiiine tubing a column of liquid extending a considy erable distance' above the well liquid level outside the tubing, and terminating the passage of current through the tubing at a depth above said well .liquid level.
5. The method of clearing congealed parafne or asphaltic bodies within an oil well from which production is taken through the usual flow tubing lowered deep in the well and directly exposed to' the fluid therein which comprises passing through a continuous length of the exposed flow tubing extending downwardly from near the top of the Well to the location of said congealed bodies, electric current of suiilciently high amperage to heat said length of the tubing to a temperature sulcient to melt said congealed bodies in the well, and pumping the well liquid upwardly through said heated length of the flow tubing and thereby maintaining the pumped liquid at a temperature above that at which said congealed bodies will form.
6 The method of clearing congealed parafne or asphaltic bodies within an oil ,well from which production is taken through the usual ow tubing lowered deep in the well and directly exposed to the fluid therein, which comprises passing through a continuous length of the exposed Iiow tubing extending downwardlyvfrom near the top of the well to the location of said congealed bodies, electric current of suiliciently high amperage to heat said length of the tubing to a temperature sufficient to melt said l congealed bodies in the well and at the same time keeping the well closed so that the pressure therein will increase due to the heating of the Well fluid.
IRIS C. LOOMAN.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US309594A US2244255A (en) | 1939-01-18 | 1939-12-16 | Well clearing system |
US337031A US2244256A (en) | 1939-12-16 | 1940-05-24 | Apparatus for clearing wells |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US25160639A | 1939-01-18 | 1939-01-18 | |
US309594A US2244255A (en) | 1939-01-18 | 1939-12-16 | Well clearing system |
Publications (1)
Publication Number | Publication Date |
---|---|
US2244255A true US2244255A (en) | 1941-06-03 |
Family
ID=26941713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US309594A Expired - Lifetime US2244255A (en) | 1939-01-18 | 1939-12-16 | Well clearing system |
Country Status (1)
Country | Link |
---|---|
US (1) | US2244255A (en) |
Cited By (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2647196A (en) * | 1950-11-06 | 1953-07-28 | Union Oil Co | Apparatus for heating oil wells |
US4319632A (en) * | 1979-12-04 | 1982-03-16 | Gkj, Inc. | Oil recovery well paraffin elimination means |
US4790375A (en) * | 1987-11-23 | 1988-12-13 | Ors Development Corporation | Mineral well heating systems |
WO2002086284A1 (en) * | 2001-04-24 | 2002-10-31 | Shell Internationale Research Maatschappij B.V. | Electrical well heating system and method |
US20030079877A1 (en) * | 2001-04-24 | 2003-05-01 | Wellington Scott Lee | In situ thermal processing of a relatively impermeable formation in a reducing environment |
US20030080604A1 (en) * | 2001-04-24 | 2003-05-01 | Vinegar Harold J. | In situ thermal processing and inhibiting migration of fluids into or out of an in situ oil shale formation |
US20030100451A1 (en) * | 2001-04-24 | 2003-05-29 | Messier Margaret Ann | In situ thermal recovery from a relatively permeable formation with backproduction through a heater wellbore |
US20030155111A1 (en) * | 2001-04-24 | 2003-08-21 | Shell Oil Co | In situ thermal processing of a tar sands formation |
US20030173085A1 (en) * | 2001-10-24 | 2003-09-18 | Vinegar Harold J. | Upgrading and mining of coal |
US20030173081A1 (en) * | 2001-10-24 | 2003-09-18 | Vinegar Harold J. | In situ thermal processing of an oil reservoir formation |
US20030183390A1 (en) * | 2001-10-24 | 2003-10-02 | Peter Veenstra | Methods and systems for heating a hydrocarbon containing formation in situ with an opening contacting the earth's surface at two locations |
US20050051334A1 (en) * | 2003-09-05 | 2005-03-10 | Baugh Benton F. | Electrical tubing control and remediation |
US20050269090A1 (en) * | 2004-04-23 | 2005-12-08 | Vinegar Harold J | Temperature limited heaters with thermally conductive fluid used to heat subsurface formations |
US7011154B2 (en) | 2000-04-24 | 2006-03-14 | Shell Oil Company | In situ recovery from a kerogen and liquid hydrocarbon containing formation |
US7073578B2 (en) | 2002-10-24 | 2006-07-11 | Shell Oil Company | Staged and/or patterned heating during in situ thermal processing of a hydrocarbon containing formation |
US7090013B2 (en) | 2001-10-24 | 2006-08-15 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce heated fluids |
US7104319B2 (en) | 2001-10-24 | 2006-09-12 | Shell Oil Company | In situ thermal processing of a heavy oil diatomite formation |
US7121342B2 (en) | 2003-04-24 | 2006-10-17 | Shell Oil Company | Thermal processes for subsurface formations |
US7165615B2 (en) | 2001-10-24 | 2007-01-23 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation using conductor-in-conduit heat sources with an electrically conductive material in the overburden |
US20070045265A1 (en) * | 2005-04-22 | 2007-03-01 | Mckinzie Billy J Ii | Low temperature barriers with heat interceptor wells for in situ processes |
US20070108201A1 (en) * | 2005-04-22 | 2007-05-17 | Vinegar Harold J | Insulated conductor temperature limited heater for subsurface heating coupled in a three-phase wye configuration |
US7533719B2 (en) | 2006-04-21 | 2009-05-19 | Shell Oil Company | Wellhead with non-ferromagnetic materials |
US7540324B2 (en) | 2006-10-20 | 2009-06-02 | Shell Oil Company | Heating hydrocarbon containing formations in a checkerboard pattern staged process |
US7549470B2 (en) | 2005-10-24 | 2009-06-23 | Shell Oil Company | Solution mining and heating by oxidation for treating hydrocarbon containing formations |
US20090194333A1 (en) * | 2007-10-19 | 2009-08-06 | Macdonald Duncan | Ranging methods for developing wellbores in subsurface formations |
US20100071904A1 (en) * | 2008-04-18 | 2010-03-25 | Shell Oil Company | Hydrocarbon production from mines and tunnels used in treating subsurface hydrocarbon containing formations |
US20100147522A1 (en) * | 2008-10-13 | 2010-06-17 | Xueying Xie | Systems and methods for treating a subsurface formation with electrical conductors |
US7798220B2 (en) | 2007-04-20 | 2010-09-21 | Shell Oil Company | In situ heat treatment of a tar sands formation after drive process treatment |
US20100258290A1 (en) * | 2009-04-10 | 2010-10-14 | Ronald Marshall Bass | Non-conducting heater casings |
US20110088904A1 (en) * | 2000-04-24 | 2011-04-21 | De Rouffignac Eric Pierre | In situ recovery from a hydrocarbon containing formation |
US20110124223A1 (en) * | 2009-10-09 | 2011-05-26 | David Jon Tilley | Press-fit coupling joint for joining insulated conductors |
US20110132661A1 (en) * | 2009-10-09 | 2011-06-09 | Patrick Silas Harmason | Parallelogram coupling joint for coupling insulated conductors |
US20110134958A1 (en) * | 2009-10-09 | 2011-06-09 | Dhruv Arora | Methods for assessing a temperature in a subsurface formation |
US8485256B2 (en) | 2010-04-09 | 2013-07-16 | Shell Oil Company | Variable thickness insulated conductors |
US8586867B2 (en) | 2010-10-08 | 2013-11-19 | Shell Oil Company | End termination for three-phase insulated conductors |
US8631866B2 (en) | 2010-04-09 | 2014-01-21 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8701769B2 (en) | 2010-04-09 | 2014-04-22 | Shell Oil Company | Methods for treating hydrocarbon formations based on geology |
US8820406B2 (en) | 2010-04-09 | 2014-09-02 | Shell Oil Company | Electrodes for electrical current flow heating of subsurface formations with conductive material in wellbore |
US8857051B2 (en) | 2010-10-08 | 2014-10-14 | Shell Oil Company | System and method for coupling lead-in conductor to insulated conductor |
US8939207B2 (en) | 2010-04-09 | 2015-01-27 | Shell Oil Company | Insulated conductor heaters with semiconductor layers |
US8943686B2 (en) | 2010-10-08 | 2015-02-03 | Shell Oil Company | Compaction of electrical insulation for joining insulated conductors |
US9016370B2 (en) | 2011-04-08 | 2015-04-28 | Shell Oil Company | Partial solution mining of hydrocarbon containing layers prior to in situ heat treatment |
US9033042B2 (en) | 2010-04-09 | 2015-05-19 | Shell Oil Company | Forming bitumen barriers in subsurface hydrocarbon formations |
US9048653B2 (en) | 2011-04-08 | 2015-06-02 | Shell Oil Company | Systems for joining insulated conductors |
US9080917B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | System and methods for using dielectric properties of an insulated conductor in a subsurface formation to assess properties of the insulated conductor |
US9080409B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | Integral splice for insulated conductors |
US9226341B2 (en) | 2011-10-07 | 2015-12-29 | Shell Oil Company | Forming insulated conductors using a final reduction step after heat treating |
US9309755B2 (en) | 2011-10-07 | 2016-04-12 | Shell Oil Company | Thermal expansion accommodation for circulated fluid systems used to heat subsurface formations |
US9394917B2 (en) * | 2011-10-18 | 2016-07-19 | Los Alamos National Security, Llc | Cooling devices and methods for use with electric submersible pumps |
US9797402B2 (en) | 2011-10-18 | 2017-10-24 | Chevron U.S.A. Inc. | Cooling devices and methods for use with electric submersible pumps |
US10047594B2 (en) | 2012-01-23 | 2018-08-14 | Genie Ip B.V. | Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation |
-
1939
- 1939-12-16 US US309594A patent/US2244255A/en not_active Expired - Lifetime
Cited By (315)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2647196A (en) * | 1950-11-06 | 1953-07-28 | Union Oil Co | Apparatus for heating oil wells |
US4319632A (en) * | 1979-12-04 | 1982-03-16 | Gkj, Inc. | Oil recovery well paraffin elimination means |
US4790375A (en) * | 1987-11-23 | 1988-12-13 | Ors Development Corporation | Mineral well heating systems |
EP0317719A1 (en) * | 1987-11-23 | 1989-05-31 | Uentech Corporation | Heating systems for boreholes |
US20110088904A1 (en) * | 2000-04-24 | 2011-04-21 | De Rouffignac Eric Pierre | In situ recovery from a hydrocarbon containing formation |
US7011154B2 (en) | 2000-04-24 | 2006-03-14 | Shell Oil Company | In situ recovery from a kerogen and liquid hydrocarbon containing formation |
US8789586B2 (en) | 2000-04-24 | 2014-07-29 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US8485252B2 (en) | 2000-04-24 | 2013-07-16 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US8225866B2 (en) | 2000-04-24 | 2012-07-24 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US6918442B2 (en) | 2001-04-24 | 2005-07-19 | Shell Oil Company | In situ thermal processing of an oil shale formation in a reducing environment |
WO2002086284A1 (en) * | 2001-04-24 | 2002-10-31 | Shell Internationale Research Maatschappij B.V. | Electrical well heating system and method |
US20030102126A1 (en) * | 2001-04-24 | 2003-06-05 | Sumnu-Dindoruk Meliha Deniz | In situ thermal recovery from a relatively permeable formation with controlled production rate |
US20030102125A1 (en) * | 2001-04-24 | 2003-06-05 | Wellington Scott Lee | In situ thermal processing of a relatively permeable formation in a reducing environment |
US20030102124A1 (en) * | 2001-04-24 | 2003-06-05 | Vinegar Harold J. | In situ thermal processing of a blending agent from a relatively permeable formation |
US20030111223A1 (en) * | 2001-04-24 | 2003-06-19 | Rouffignac Eric Pierre De | In situ thermal processing of an oil shale formation using horizontal heat sources |
US20030116315A1 (en) * | 2001-04-24 | 2003-06-26 | Wellington Scott Lee | In situ thermal processing of a relatively permeable formation |
US20030130136A1 (en) * | 2001-04-24 | 2003-07-10 | Rouffignac Eric Pierre De | In situ thermal processing of a relatively impermeable formation using an open wellbore |
US20030131993A1 (en) * | 2001-04-24 | 2003-07-17 | Etuan Zhang | In situ thermal processing of an oil shale formation with a selected property |
US20030131995A1 (en) * | 2001-04-24 | 2003-07-17 | De Rouffignac Eric Pierre | In situ thermal processing of a relatively impermeable formation to increase permeability of the formation |
US20030131994A1 (en) * | 2001-04-24 | 2003-07-17 | Vinegar Harold J. | In situ thermal processing and solution mining of an oil shale formation |
US20030131996A1 (en) * | 2001-04-24 | 2003-07-17 | Vinegar Harold J. | In situ thermal processing of an oil shale formation having permeable and impermeable sections |
US20030136558A1 (en) * | 2001-04-24 | 2003-07-24 | Wellington Scott Lee | In situ thermal processing of an oil shale formation to produce a desired product |
US20030136559A1 (en) * | 2001-04-24 | 2003-07-24 | Wellington Scott Lee | In situ thermal processing while controlling pressure in an oil shale formation |
US20030142964A1 (en) * | 2001-04-24 | 2003-07-31 | Wellington Scott Lee | In situ thermal processing of an oil shale formation using a controlled heating rate |
US20030141067A1 (en) * | 2001-04-24 | 2003-07-31 | Rouffignac Eric Pierre De | In situ thermal processing of an oil shale formation to increase permeability of the formation |
US20030141066A1 (en) * | 2001-04-24 | 2003-07-31 | Karanikas John Michael | In situ thermal processing of an oil shale formation while inhibiting coking |
US20030141068A1 (en) * | 2001-04-24 | 2003-07-31 | Pierre De Rouffignac Eric | In situ thermal processing through an open wellbore in an oil shale formation |
US20030146002A1 (en) * | 2001-04-24 | 2003-08-07 | Vinegar Harold J. | Removable heat sources for in situ thermal processing of an oil shale formation |
US20030148894A1 (en) * | 2001-04-24 | 2003-08-07 | Vinegar Harold J. | In situ thermal processing of an oil shale formation using a natural distributed combustor |
US6964300B2 (en) | 2001-04-24 | 2005-11-15 | Shell Oil Company | In situ thermal recovery from a relatively permeable formation with backproduction through a heater wellbore |
US20030164239A1 (en) * | 2001-04-24 | 2003-09-04 | Wellington Scott Lee | In situ thermal processing of an oil shale formation in a reducing environment |
US7096942B1 (en) | 2001-04-24 | 2006-08-29 | Shell Oil Company | In situ thermal processing of a relatively permeable formation while controlling pressure |
US7066254B2 (en) | 2001-04-24 | 2006-06-27 | Shell Oil Company | In situ thermal processing of a tar sands formation |
US20030173078A1 (en) * | 2001-04-24 | 2003-09-18 | Wellington Scott Lee | In situ thermal processing of an oil shale formation to produce a condensate |
US7055600B2 (en) | 2001-04-24 | 2006-06-06 | Shell Oil Company | In situ thermal recovery from a relatively permeable formation with controlled production rate |
US7051811B2 (en) | 2001-04-24 | 2006-05-30 | Shell Oil Company | In situ thermal processing through an open wellbore in an oil shale formation |
US7051807B2 (en) | 2001-04-24 | 2006-05-30 | Shell Oil Company | In situ thermal recovery from a relatively permeable formation with quality control |
US7040398B2 (en) | 2001-04-24 | 2006-05-09 | Shell Oil Company | In situ thermal processing of a relatively permeable formation in a reducing environment |
US7040399B2 (en) | 2001-04-24 | 2006-05-09 | Shell Oil Company | In situ thermal processing of an oil shale formation using a controlled heating rate |
US6951247B2 (en) | 2001-04-24 | 2005-10-04 | Shell Oil Company | In situ thermal processing of an oil shale formation using horizontal heat sources |
US7040400B2 (en) | 2001-04-24 | 2006-05-09 | Shell Oil Company | In situ thermal processing of a relatively impermeable formation using an open wellbore |
US6782947B2 (en) | 2001-04-24 | 2004-08-31 | Shell Oil Company | In situ thermal processing of a relatively impermeable formation to increase permeability of the formation |
US20040211554A1 (en) * | 2001-04-24 | 2004-10-28 | Vinegar Harold J. | Heat sources with conductive material for in situ thermal processing of an oil shale formation |
US20040211557A1 (en) * | 2001-04-24 | 2004-10-28 | Cole Anthony Thomas | Conductor-in-conduit heat sources for in situ thermal processing of an oil shale formation |
US7032660B2 (en) | 2001-04-24 | 2006-04-25 | Shell Oil Company | In situ thermal processing and inhibiting migration of fluids into or out of an in situ oil shale formation |
US6877555B2 (en) | 2001-04-24 | 2005-04-12 | Shell Oil Company | In situ thermal processing of an oil shale formation while inhibiting coking |
US6880633B2 (en) | 2001-04-24 | 2005-04-19 | Shell Oil Company | In situ thermal processing of an oil shale formation to produce a desired product |
US7013972B2 (en) | 2001-04-24 | 2006-03-21 | Shell Oil Company | In situ thermal processing of an oil shale formation using a natural distributed combustor |
US6915850B2 (en) | 2001-04-24 | 2005-07-12 | Shell Oil Company | In situ thermal processing of an oil shale formation having permeable and impermeable sections |
US6918443B2 (en) | 2001-04-24 | 2005-07-19 | Shell Oil Company | In situ thermal processing of an oil shale formation to produce hydrocarbons having a selected carbon number range |
US20030102130A1 (en) * | 2001-04-24 | 2003-06-05 | Vinegar Harold J. | In situ thermal recovery from a relatively permeable formation with quality control |
US6923257B2 (en) | 2001-04-24 | 2005-08-02 | Shell Oil Company | In situ thermal processing of an oil shale formation to produce a condensate |
US6929067B2 (en) | 2001-04-24 | 2005-08-16 | Shell Oil Company | Heat sources with conductive material for in situ thermal processing of an oil shale formation |
US7004251B2 (en) | 2001-04-24 | 2006-02-28 | Shell Oil Company | In situ thermal processing and remediation of an oil shale formation |
US6948562B2 (en) | 2001-04-24 | 2005-09-27 | Shell Oil Company | Production of a blending agent using an in situ thermal process in a relatively permeable formation |
US20030209348A1 (en) * | 2001-04-24 | 2003-11-13 | Ward John Michael | In situ thermal processing and remediation of an oil shale formation |
US20030155111A1 (en) * | 2001-04-24 | 2003-08-21 | Shell Oil Co | In situ thermal processing of a tar sands formation |
US20100270015A1 (en) * | 2001-04-24 | 2010-10-28 | Shell Oil Company | In situ thermal processing of an oil shale formation |
US7004247B2 (en) | 2001-04-24 | 2006-02-28 | Shell Oil Company | Conductor-in-conduit heat sources for in situ thermal processing of an oil shale formation |
US7735935B2 (en) | 2001-04-24 | 2010-06-15 | Shell Oil Company | In situ thermal processing of an oil shale formation containing carbonate minerals |
US6966374B2 (en) | 2001-04-24 | 2005-11-22 | Shell Oil Company | In situ thermal recovery from a relatively permeable formation using gas to increase mobility |
US20030098605A1 (en) * | 2001-04-24 | 2003-05-29 | Vinegar Harold J. | In situ thermal recovery from a relatively permeable formation |
US20030098149A1 (en) * | 2001-04-24 | 2003-05-29 | Wellington Scott Lee | In situ thermal recovery from a relatively permeable formation using gas to increase mobility |
US20030100451A1 (en) * | 2001-04-24 | 2003-05-29 | Messier Margaret Ann | In situ thermal recovery from a relatively permeable formation with backproduction through a heater wellbore |
US7225866B2 (en) | 2001-04-24 | 2007-06-05 | Shell Oil Company | In situ thermal processing of an oil shale formation using a pattern of heat sources |
US20030080604A1 (en) * | 2001-04-24 | 2003-05-01 | Vinegar Harold J. | In situ thermal processing and inhibiting migration of fluids into or out of an in situ oil shale formation |
US8608249B2 (en) | 2001-04-24 | 2013-12-17 | Shell Oil Company | In situ thermal processing of an oil shale formation |
US6997518B2 (en) | 2001-04-24 | 2006-02-14 | Shell Oil Company | In situ thermal processing and solution mining of an oil shale formation |
US20030079877A1 (en) * | 2001-04-24 | 2003-05-01 | Wellington Scott Lee | In situ thermal processing of a relatively impermeable formation in a reducing environment |
US6981548B2 (en) | 2001-04-24 | 2006-01-03 | Shell Oil Company | In situ thermal recovery from a relatively permeable formation |
AU2002224779B2 (en) * | 2001-04-24 | 2007-02-01 | Shell Internationale Research Maatschappij B.V. | Electrical well heating system and method |
US6991032B2 (en) | 2001-04-24 | 2006-01-31 | Shell Oil Company | In situ thermal processing of an oil shale formation using a pattern of heat sources |
US6994169B2 (en) | 2001-04-24 | 2006-02-07 | Shell Oil Company | In situ thermal processing of an oil shale formation with a selected property |
US6991036B2 (en) | 2001-04-24 | 2006-01-31 | Shell Oil Company | Thermal processing of a relatively permeable formation |
US6991033B2 (en) | 2001-04-24 | 2006-01-31 | Shell Oil Company | In situ thermal processing while controlling pressure in an oil shale formation |
US7100994B2 (en) | 2001-10-24 | 2006-09-05 | Shell Oil Company | Producing hydrocarbons and non-hydrocarbon containing materials when treating a hydrocarbon containing formation |
US20030196810A1 (en) * | 2001-10-24 | 2003-10-23 | Vinegar Harold J. | Treatment of a hydrocarbon containing formation after heating |
US6991045B2 (en) | 2001-10-24 | 2006-01-31 | Shell Oil Company | Forming openings in a hydrocarbon containing formation using magnetic tracking |
US6932155B2 (en) | 2001-10-24 | 2005-08-23 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation via backproducing through a heater well |
US7128153B2 (en) | 2001-10-24 | 2006-10-31 | Shell Oil Company | Treatment of a hydrocarbon containing formation after heating |
US20050092483A1 (en) * | 2001-10-24 | 2005-05-05 | Vinegar Harold J. | In situ thermal processing of a hydrocarbon containing formation using a natural distributed combustor |
US7165615B2 (en) | 2001-10-24 | 2007-01-23 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation using conductor-in-conduit heat sources with an electrically conductive material in the overburden |
US7461691B2 (en) | 2001-10-24 | 2008-12-09 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US20040040715A1 (en) * | 2001-10-24 | 2004-03-04 | Wellington Scott Lee | In situ production of a blending agent from a hydrocarbon containing formation |
US20030205378A1 (en) * | 2001-10-24 | 2003-11-06 | Wellington Scott Lee | In situ recovery from lean and rich zones in a hydrocarbon containing formation |
US20030201098A1 (en) * | 2001-10-24 | 2003-10-30 | Karanikas John Michael | In situ recovery from a hydrocarbon containing formation using one or more simulations |
US7114566B2 (en) | 2001-10-24 | 2006-10-03 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using a natural distributed combustor |
US6969123B2 (en) | 2001-10-24 | 2005-11-29 | Shell Oil Company | Upgrading and mining of coal |
US8627887B2 (en) | 2001-10-24 | 2014-01-14 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation |
US7086465B2 (en) | 2001-10-24 | 2006-08-08 | Shell Oil Company | In situ production of a blending agent from a hydrocarbon containing formation |
US7063145B2 (en) | 2001-10-24 | 2006-06-20 | Shell Oil Company | Methods and systems for heating a hydrocarbon containing formation in situ with an opening contacting the earth's surface at two locations |
US7066257B2 (en) | 2001-10-24 | 2006-06-27 | Shell Oil Company | In situ recovery from lean and rich zones in a hydrocarbon containing formation |
US20030196801A1 (en) * | 2001-10-24 | 2003-10-23 | Vinegar Harold J. | In situ thermal processing of a hydrocarbon containing formation via backproducing through a heater well |
US7156176B2 (en) | 2001-10-24 | 2007-01-02 | Shell Oil Company | Installation and use of removable heaters in a hydrocarbon containing formation |
US7077198B2 (en) | 2001-10-24 | 2006-07-18 | Shell Oil Company | In situ recovery from a hydrocarbon containing formation using barriers |
US7077199B2 (en) | 2001-10-24 | 2006-07-18 | Shell Oil Company | In situ thermal processing of an oil reservoir formation |
US20030183390A1 (en) * | 2001-10-24 | 2003-10-02 | Peter Veenstra | Methods and systems for heating a hydrocarbon containing formation in situ with an opening contacting the earth's surface at two locations |
US7090013B2 (en) | 2001-10-24 | 2006-08-15 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation to produce heated fluids |
US20030173085A1 (en) * | 2001-10-24 | 2003-09-18 | Vinegar Harold J. | Upgrading and mining of coal |
US7051808B1 (en) | 2001-10-24 | 2006-05-30 | Shell Oil Company | Seismic monitoring of in situ conversion in a hydrocarbon containing formation |
US7104319B2 (en) | 2001-10-24 | 2006-09-12 | Shell Oil Company | In situ thermal processing of a heavy oil diatomite formation |
US20030173081A1 (en) * | 2001-10-24 | 2003-09-18 | Vinegar Harold J. | In situ thermal processing of an oil reservoir formation |
US7121341B2 (en) | 2002-10-24 | 2006-10-17 | Shell Oil Company | Conductor-in-conduit temperature limited heaters |
US7219734B2 (en) | 2002-10-24 | 2007-05-22 | Shell Oil Company | Inhibiting wellbore deformation during in situ thermal processing of a hydrocarbon containing formation |
US8224163B2 (en) | 2002-10-24 | 2012-07-17 | Shell Oil Company | Variable frequency temperature limited heaters |
US8224164B2 (en) | 2002-10-24 | 2012-07-17 | Shell Oil Company | Insulated conductor temperature limited heaters |
US7073578B2 (en) | 2002-10-24 | 2006-07-11 | Shell Oil Company | Staged and/or patterned heating during in situ thermal processing of a hydrocarbon containing formation |
US8238730B2 (en) | 2002-10-24 | 2012-08-07 | Shell Oil Company | High voltage temperature limited heaters |
US8579031B2 (en) | 2003-04-24 | 2013-11-12 | Shell Oil Company | Thermal processes for subsurface formations |
US7640980B2 (en) | 2003-04-24 | 2010-01-05 | Shell Oil Company | Thermal processes for subsurface formations |
US7360588B2 (en) | 2003-04-24 | 2008-04-22 | Shell Oil Company | Thermal processes for subsurface formations |
US7942203B2 (en) | 2003-04-24 | 2011-05-17 | Shell Oil Company | Thermal processes for subsurface formations |
US7121342B2 (en) | 2003-04-24 | 2006-10-17 | Shell Oil Company | Thermal processes for subsurface formations |
US7025131B2 (en) * | 2003-09-05 | 2006-04-11 | Baugh Benton F | Electrical tubing control and remediation apparatus and method of use |
US20050051334A1 (en) * | 2003-09-05 | 2005-03-10 | Baugh Benton F. | Electrical tubing control and remediation |
US20050269313A1 (en) * | 2004-04-23 | 2005-12-08 | Vinegar Harold J | Temperature limited heaters with high power factors |
US7357180B2 (en) | 2004-04-23 | 2008-04-15 | Shell Oil Company | Inhibiting effects of sloughing in wellbores |
US20050269091A1 (en) * | 2004-04-23 | 2005-12-08 | Guillermo Pastor-Sanz | Reducing viscosity of oil for production from a hydrocarbon containing formation |
US20050269089A1 (en) * | 2004-04-23 | 2005-12-08 | Sandberg Chester L | Temperature limited heaters using modulated DC power |
US20060289536A1 (en) * | 2004-04-23 | 2006-12-28 | Vinegar Harold J | Subsurface electrical heaters using nitride insulation |
US20050269088A1 (en) * | 2004-04-23 | 2005-12-08 | Vinegar Harold J | Inhibiting effects of sloughing in wellbores |
US8355623B2 (en) | 2004-04-23 | 2013-01-15 | Shell Oil Company | Temperature limited heaters with high power factors |
US20050269092A1 (en) * | 2004-04-23 | 2005-12-08 | Vinegar Harold J | Vacuum pumping of conductor-in-conduit heaters |
US20050269077A1 (en) * | 2004-04-23 | 2005-12-08 | Sandberg Chester L | Start-up of temperature limited heaters using direct current (DC) |
US7320364B2 (en) | 2004-04-23 | 2008-01-22 | Shell Oil Company | Inhibiting reflux in a heated well of an in situ conversion system |
US7353872B2 (en) | 2004-04-23 | 2008-04-08 | Shell Oil Company | Start-up of temperature limited heaters using direct current (DC) |
US20060005968A1 (en) * | 2004-04-23 | 2006-01-12 | Vinegar Harold J | Temperature limited heaters with relatively constant current |
US7510000B2 (en) | 2004-04-23 | 2009-03-31 | Shell Oil Company | Reducing viscosity of oil for production from a hydrocarbon containing formation |
US7370704B2 (en) | 2004-04-23 | 2008-05-13 | Shell Oil Company | Triaxial temperature limited heater |
US7383877B2 (en) | 2004-04-23 | 2008-06-10 | Shell Oil Company | Temperature limited heaters with thermally conductive fluid used to heat subsurface formations |
US20050269093A1 (en) * | 2004-04-23 | 2005-12-08 | Sandberg Chester L | Variable frequency temperature limited heaters |
US7424915B2 (en) | 2004-04-23 | 2008-09-16 | Shell Oil Company | Vacuum pumping of conductor-in-conduit heaters |
US7431076B2 (en) | 2004-04-23 | 2008-10-07 | Shell Oil Company | Temperature limited heaters using modulated DC power |
US20050269090A1 (en) * | 2004-04-23 | 2005-12-08 | Vinegar Harold J | Temperature limited heaters with thermally conductive fluid used to heat subsurface formations |
AU2005238944B2 (en) * | 2004-04-23 | 2008-10-23 | Shell Internationale Research Maatschappij B.V. | Temperature limited heaters with thermally conductive fluid used to heat subsurface formations |
US20050269094A1 (en) * | 2004-04-23 | 2005-12-08 | Harris Christopher K | Triaxial temperature limited heater |
US7481274B2 (en) | 2004-04-23 | 2009-01-27 | Shell Oil Company | Temperature limited heaters with relatively constant current |
US7490665B2 (en) | 2004-04-23 | 2009-02-17 | Shell Oil Company | Variable frequency temperature limited heaters |
US20050269095A1 (en) * | 2004-04-23 | 2005-12-08 | Fairbanks Michael D | Inhibiting reflux in a heated well of an in situ conversion system |
US8224165B2 (en) | 2005-04-22 | 2012-07-17 | Shell Oil Company | Temperature limited heater utilizing non-ferromagnetic conductor |
US20070137856A1 (en) * | 2005-04-22 | 2007-06-21 | Mckinzie Billy J | Double barrier system for an in situ conversion process |
US7527094B2 (en) | 2005-04-22 | 2009-05-05 | Shell Oil Company | Double barrier system for an in situ conversion process |
US20070137857A1 (en) * | 2005-04-22 | 2007-06-21 | Vinegar Harold J | Low temperature monitoring system for subsurface barriers |
US7546873B2 (en) | 2005-04-22 | 2009-06-16 | Shell Oil Company | Low temperature barriers for use with in situ processes |
US20070045268A1 (en) * | 2005-04-22 | 2007-03-01 | Vinegar Harold J | Varying properties along lengths of temperature limited heaters |
US7435037B2 (en) | 2005-04-22 | 2008-10-14 | Shell Oil Company | Low temperature barriers with heat interceptor wells for in situ processes |
US20070045267A1 (en) * | 2005-04-22 | 2007-03-01 | Vinegar Harold J | Subsurface connection methods for subsurface heaters |
US20070045266A1 (en) * | 2005-04-22 | 2007-03-01 | Sandberg Chester L | In situ conversion process utilizing a closed loop heating system |
US20080217321A1 (en) * | 2005-04-22 | 2008-09-11 | Vinegar Harold J | Temperature limited heater utilizing non-ferromagnetic conductor |
US7831134B2 (en) | 2005-04-22 | 2010-11-09 | Shell Oil Company | Grouped exposed metal heaters |
US7860377B2 (en) | 2005-04-22 | 2010-12-28 | Shell Oil Company | Subsurface connection methods for subsurface heaters |
US20070133961A1 (en) * | 2005-04-22 | 2007-06-14 | Fairbanks Michael D | Methods and systems for producing fluid from an in situ conversion process |
US7575053B2 (en) | 2005-04-22 | 2009-08-18 | Shell Oil Company | Low temperature monitoring system for subsurface barriers |
US7575052B2 (en) | 2005-04-22 | 2009-08-18 | Shell Oil Company | In situ conversion process utilizing a closed loop heating system |
US20070108201A1 (en) * | 2005-04-22 | 2007-05-17 | Vinegar Harold J | Insulated conductor temperature limited heater for subsurface heating coupled in a three-phase wye configuration |
US20070144732A1 (en) * | 2005-04-22 | 2007-06-28 | Kim Dong S | Low temperature barriers for use with in situ processes |
US20070045265A1 (en) * | 2005-04-22 | 2007-03-01 | Mckinzie Billy J Ii | Low temperature barriers with heat interceptor wells for in situ processes |
US20070133959A1 (en) * | 2005-04-22 | 2007-06-14 | Vinegar Harold J | Grouped exposed metal heaters |
US20070133960A1 (en) * | 2005-04-22 | 2007-06-14 | Vinegar Harold J | In situ conversion process systems utilizing wellbores in at least two regions of a formation |
US8070840B2 (en) | 2005-04-22 | 2011-12-06 | Shell Oil Company | Treatment of gas from an in situ conversion process |
US8027571B2 (en) | 2005-04-22 | 2011-09-27 | Shell Oil Company | In situ conversion process systems utilizing wellbores in at least two regions of a formation |
US8233782B2 (en) | 2005-04-22 | 2012-07-31 | Shell Oil Company | Grouped exposed metal heaters |
US7986869B2 (en) | 2005-04-22 | 2011-07-26 | Shell Oil Company | Varying properties along lengths of temperature limited heaters |
US7942197B2 (en) | 2005-04-22 | 2011-05-17 | Shell Oil Company | Methods and systems for producing fluid from an in situ conversion process |
US20070108200A1 (en) * | 2005-04-22 | 2007-05-17 | Mckinzie Billy J Ii | Low temperature barrier wellbores formed using water flushing |
US7500528B2 (en) | 2005-04-22 | 2009-03-10 | Shell Oil Company | Low temperature barrier wellbores formed using water flushing |
US8230927B2 (en) | 2005-04-22 | 2012-07-31 | Shell Oil Company | Methods and systems for producing fluid from an in situ conversion process |
US20070119098A1 (en) * | 2005-04-22 | 2007-05-31 | Zaida Diaz | Treatment of gas from an in situ conversion process |
US20110168394A1 (en) * | 2005-10-24 | 2011-07-14 | Shell Oil Company | Methods of producing alkylated hydrocarbons from an in situ heat treatment process liquid |
US7635025B2 (en) | 2005-10-24 | 2009-12-22 | Shell Oil Company | Cogeneration systems and processes for treating hydrocarbon containing formations |
US7591310B2 (en) | 2005-10-24 | 2009-09-22 | Shell Oil Company | Methods of hydrotreating a liquid stream to remove clogging compounds |
US7584789B2 (en) | 2005-10-24 | 2009-09-08 | Shell Oil Company | Methods of cracking a crude product to produce additional crude products |
US7581589B2 (en) | 2005-10-24 | 2009-09-01 | Shell Oil Company | Methods of producing alkylated hydrocarbons from an in situ heat treatment process liquid |
US8151880B2 (en) | 2005-10-24 | 2012-04-10 | Shell Oil Company | Methods of making transportation fuel |
US7562706B2 (en) | 2005-10-24 | 2009-07-21 | Shell Oil Company | Systems and methods for producing hydrocarbons from tar sands formations |
US7559368B2 (en) | 2005-10-24 | 2009-07-14 | Shell Oil Company | Solution mining systems and methods for treating hydrocarbon containing formations |
US7559367B2 (en) | 2005-10-24 | 2009-07-14 | Shell Oil Company | Temperature limited heater with a conduit substantially electrically isolated from the formation |
US8606091B2 (en) | 2005-10-24 | 2013-12-10 | Shell Oil Company | Subsurface heaters with low sulfidation rates |
US7556096B2 (en) | 2005-10-24 | 2009-07-07 | Shell Oil Company | Varying heating in dawsonite zones in hydrocarbon containing formations |
US7556095B2 (en) | 2005-10-24 | 2009-07-07 | Shell Oil Company | Solution mining dawsonite from hydrocarbon containing formations with a chelating agent |
US7549470B2 (en) | 2005-10-24 | 2009-06-23 | Shell Oil Company | Solution mining and heating by oxidation for treating hydrocarbon containing formations |
US7912358B2 (en) | 2006-04-21 | 2011-03-22 | Shell Oil Company | Alternate energy source usage for in situ heat treatment processes |
US8857506B2 (en) | 2006-04-21 | 2014-10-14 | Shell Oil Company | Alternate energy source usage methods for in situ heat treatment processes |
US7785427B2 (en) | 2006-04-21 | 2010-08-31 | Shell Oil Company | High strength alloys |
US7533719B2 (en) | 2006-04-21 | 2009-05-19 | Shell Oil Company | Wellhead with non-ferromagnetic materials |
US7793722B2 (en) | 2006-04-21 | 2010-09-14 | Shell Oil Company | Non-ferromagnetic overburden casing |
US7597147B2 (en) | 2006-04-21 | 2009-10-06 | Shell Oil Company | Temperature limited heaters using phase transformation of ferromagnetic material |
US7604052B2 (en) | 2006-04-21 | 2009-10-20 | Shell Oil Company | Compositions produced using an in situ heat treatment process |
US8083813B2 (en) | 2006-04-21 | 2011-12-27 | Shell Oil Company | Methods of producing transportation fuel |
US7610962B2 (en) | 2006-04-21 | 2009-11-03 | Shell Oil Company | Sour gas injection for use with in situ heat treatment |
US7631689B2 (en) | 2006-04-21 | 2009-12-15 | Shell Oil Company | Sulfur barrier for use with in situ processes for treating formations |
US7635023B2 (en) | 2006-04-21 | 2009-12-22 | Shell Oil Company | Time sequenced heating of multiple layers in a hydrocarbon containing formation |
US7673786B2 (en) | 2006-04-21 | 2010-03-09 | Shell Oil Company | Welding shield for coupling heaters |
US7683296B2 (en) | 2006-04-21 | 2010-03-23 | Shell Oil Company | Adjusting alloy compositions for selected properties in temperature limited heaters |
US7866385B2 (en) | 2006-04-21 | 2011-01-11 | Shell Oil Company | Power systems utilizing the heat of produced formation fluid |
US7703513B2 (en) | 2006-10-20 | 2010-04-27 | Shell Oil Company | Wax barrier for use with in situ processes for treating formations |
US8555971B2 (en) | 2006-10-20 | 2013-10-15 | Shell Oil Company | Treating tar sands formations with dolomite |
US7841401B2 (en) | 2006-10-20 | 2010-11-30 | Shell Oil Company | Gas injection to inhibit migration during an in situ heat treatment process |
US7845411B2 (en) | 2006-10-20 | 2010-12-07 | Shell Oil Company | In situ heat treatment process utilizing a closed loop heating system |
US7540324B2 (en) | 2006-10-20 | 2009-06-02 | Shell Oil Company | Heating hydrocarbon containing formations in a checkerboard pattern staged process |
US7562707B2 (en) | 2006-10-20 | 2009-07-21 | Shell Oil Company | Heating hydrocarbon containing formations in a line drive staged process |
US7730945B2 (en) | 2006-10-20 | 2010-06-08 | Shell Oil Company | Using geothermal energy to heat a portion of a formation for an in situ heat treatment process |
US7730947B2 (en) | 2006-10-20 | 2010-06-08 | Shell Oil Company | Creating fluid injectivity in tar sands formations |
US7730946B2 (en) | 2006-10-20 | 2010-06-08 | Shell Oil Company | Treating tar sands formations with dolomite |
US7644765B2 (en) | 2006-10-20 | 2010-01-12 | Shell Oil Company | Heating tar sands formations while controlling pressure |
US8191630B2 (en) | 2006-10-20 | 2012-06-05 | Shell Oil Company | Creating fluid injectivity in tar sands formations |
US7681647B2 (en) | 2006-10-20 | 2010-03-23 | Shell Oil Company | Method of producing drive fluid in situ in tar sands formations |
US7631690B2 (en) | 2006-10-20 | 2009-12-15 | Shell Oil Company | Heating hydrocarbon containing formations in a spiral startup staged sequence |
US7677314B2 (en) | 2006-10-20 | 2010-03-16 | Shell Oil Company | Method of condensing vaporized water in situ to treat tar sands formations |
US7677310B2 (en) | 2006-10-20 | 2010-03-16 | Shell Oil Company | Creating and maintaining a gas cap in tar sands formations |
US7673681B2 (en) | 2006-10-20 | 2010-03-09 | Shell Oil Company | Treating tar sands formations with karsted zones |
US7635024B2 (en) | 2006-10-20 | 2009-12-22 | Shell Oil Company | Heating tar sands formations to visbreaking temperatures |
US7717171B2 (en) | 2006-10-20 | 2010-05-18 | Shell Oil Company | Moving hydrocarbons through portions of tar sands formations with a fluid |
US20100276141A1 (en) * | 2006-10-20 | 2010-11-04 | Shell Oil Company | Creating fluid injectivity in tar sands formations |
US8381815B2 (en) | 2007-04-20 | 2013-02-26 | Shell Oil Company | Production from multiple zones of a tar sands formation |
US7950453B2 (en) | 2007-04-20 | 2011-05-31 | Shell Oil Company | Downhole burner systems and methods for heating subsurface formations |
US8327681B2 (en) | 2007-04-20 | 2012-12-11 | Shell Oil Company | Wellbore manufacturing processes for in situ heat treatment processes |
US7931086B2 (en) | 2007-04-20 | 2011-04-26 | Shell Oil Company | Heating systems for heating subsurface formations |
US7841408B2 (en) | 2007-04-20 | 2010-11-30 | Shell Oil Company | In situ heat treatment from multiple layers of a tar sands formation |
US8042610B2 (en) | 2007-04-20 | 2011-10-25 | Shell Oil Company | Parallel heater system for subsurface formations |
US8459359B2 (en) | 2007-04-20 | 2013-06-11 | Shell Oil Company | Treating nahcolite containing formations and saline zones |
US8662175B2 (en) | 2007-04-20 | 2014-03-04 | Shell Oil Company | Varying properties of in situ heat treatment of a tar sands formation based on assessed viscosities |
US7832484B2 (en) | 2007-04-20 | 2010-11-16 | Shell Oil Company | Molten salt as a heat transfer fluid for heating a subsurface formation |
US7798220B2 (en) | 2007-04-20 | 2010-09-21 | Shell Oil Company | In situ heat treatment of a tar sands formation after drive process treatment |
US9181780B2 (en) | 2007-04-20 | 2015-11-10 | Shell Oil Company | Controlling and assessing pressure conditions during treatment of tar sands formations |
US7841425B2 (en) | 2007-04-20 | 2010-11-30 | Shell Oil Company | Drilling subsurface wellbores with cutting structures |
US7849922B2 (en) | 2007-04-20 | 2010-12-14 | Shell Oil Company | In situ recovery from residually heated sections in a hydrocarbon containing formation |
US8791396B2 (en) | 2007-04-20 | 2014-07-29 | Shell Oil Company | Floating insulated conductors for heating subsurface formations |
US8162059B2 (en) | 2007-10-19 | 2012-04-24 | Shell Oil Company | Induction heaters used to heat subsurface formations |
US8272455B2 (en) | 2007-10-19 | 2012-09-25 | Shell Oil Company | Methods for forming wellbores in heated formations |
US8536497B2 (en) | 2007-10-19 | 2013-09-17 | Shell Oil Company | Methods for forming long subsurface heaters |
US7866386B2 (en) | 2007-10-19 | 2011-01-11 | Shell Oil Company | In situ oxidation of subsurface formations |
US8196658B2 (en) | 2007-10-19 | 2012-06-12 | Shell Oil Company | Irregular spacing of heat sources for treating hydrocarbon containing formations |
US7866388B2 (en) | 2007-10-19 | 2011-01-11 | Shell Oil Company | High temperature methods for forming oxidizer fuel |
US8276661B2 (en) | 2007-10-19 | 2012-10-02 | Shell Oil Company | Heating subsurface formations by oxidizing fuel on a fuel carrier |
US8146669B2 (en) | 2007-10-19 | 2012-04-03 | Shell Oil Company | Multi-step heater deployment in a subsurface formation |
US8146661B2 (en) | 2007-10-19 | 2012-04-03 | Shell Oil Company | Cryogenic treatment of gas |
US8113272B2 (en) | 2007-10-19 | 2012-02-14 | Shell Oil Company | Three-phase heaters with common overburden sections for heating subsurface formations |
US8011451B2 (en) | 2007-10-19 | 2011-09-06 | Shell Oil Company | Ranging methods for developing wellbores in subsurface formations |
US8240774B2 (en) | 2007-10-19 | 2012-08-14 | Shell Oil Company | Solution mining and in situ treatment of nahcolite beds |
US20090194333A1 (en) * | 2007-10-19 | 2009-08-06 | Macdonald Duncan | Ranging methods for developing wellbores in subsurface formations |
US9528322B2 (en) | 2008-04-18 | 2016-12-27 | Shell Oil Company | Dual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations |
US8172335B2 (en) | 2008-04-18 | 2012-05-08 | Shell Oil Company | Electrical current flow between tunnels for use in heating subsurface hydrocarbon containing formations |
US8177305B2 (en) | 2008-04-18 | 2012-05-15 | Shell Oil Company | Heater connections in mines and tunnels for use in treating subsurface hydrocarbon containing formations |
US8162405B2 (en) | 2008-04-18 | 2012-04-24 | Shell Oil Company | Using tunnels for treating subsurface hydrocarbon containing formations |
US8636323B2 (en) | 2008-04-18 | 2014-01-28 | Shell Oil Company | Mines and tunnels for use in treating subsurface hydrocarbon containing formations |
US8752904B2 (en) | 2008-04-18 | 2014-06-17 | Shell Oil Company | Heated fluid flow in mines and tunnels used in heating subsurface hydrocarbon containing formations |
US8562078B2 (en) | 2008-04-18 | 2013-10-22 | Shell Oil Company | Hydrocarbon production from mines and tunnels used in treating subsurface hydrocarbon containing formations |
US8151907B2 (en) | 2008-04-18 | 2012-04-10 | Shell Oil Company | Dual motor systems and non-rotating sensors for use in developing wellbores in subsurface formations |
US20100071904A1 (en) * | 2008-04-18 | 2010-03-25 | Shell Oil Company | Hydrocarbon production from mines and tunnels used in treating subsurface hydrocarbon containing formations |
US8353347B2 (en) | 2008-10-13 | 2013-01-15 | Shell Oil Company | Deployment of insulated conductors for treating subsurface formations |
US8267170B2 (en) | 2008-10-13 | 2012-09-18 | Shell Oil Company | Offset barrier wells in subsurface formations |
US8881806B2 (en) | 2008-10-13 | 2014-11-11 | Shell Oil Company | Systems and methods for treating a subsurface formation with electrical conductors |
US9051829B2 (en) | 2008-10-13 | 2015-06-09 | Shell Oil Company | Perforated electrical conductors for treating subsurface formations |
US8281861B2 (en) | 2008-10-13 | 2012-10-09 | Shell Oil Company | Circulated heated transfer fluid heating of subsurface hydrocarbon formations |
US20100147522A1 (en) * | 2008-10-13 | 2010-06-17 | Xueying Xie | Systems and methods for treating a subsurface formation with electrical conductors |
US20100147521A1 (en) * | 2008-10-13 | 2010-06-17 | Xueying Xie | Perforated electrical conductors for treating subsurface formations |
US9022118B2 (en) | 2008-10-13 | 2015-05-05 | Shell Oil Company | Double insulated heaters for treating subsurface formations |
US8220539B2 (en) | 2008-10-13 | 2012-07-17 | Shell Oil Company | Controlling hydrogen pressure in self-regulating nuclear reactors used to treat a subsurface formation |
US20100206570A1 (en) * | 2008-10-13 | 2010-08-19 | Ernesto Rafael Fonseca Ocampos | Circulated heated transfer fluid systems used to treat a subsurface formation |
US8267185B2 (en) | 2008-10-13 | 2012-09-18 | Shell Oil Company | Circulated heated transfer fluid systems used to treat a subsurface formation |
US8261832B2 (en) | 2008-10-13 | 2012-09-11 | Shell Oil Company | Heating subsurface formations with fluids |
US20100224368A1 (en) * | 2008-10-13 | 2010-09-09 | Stanley Leroy Mason | Deployment of insulated conductors for treating subsurface formations |
US9129728B2 (en) | 2008-10-13 | 2015-09-08 | Shell Oil Company | Systems and methods of forming subsurface wellbores |
US8256512B2 (en) | 2008-10-13 | 2012-09-04 | Shell Oil Company | Movable heaters for treating subsurface hydrocarbon containing formations |
US20100258290A1 (en) * | 2009-04-10 | 2010-10-14 | Ronald Marshall Bass | Non-conducting heater casings |
US8851170B2 (en) | 2009-04-10 | 2014-10-07 | Shell Oil Company | Heater assisted fluid treatment of a subsurface formation |
US20110042084A1 (en) * | 2009-04-10 | 2011-02-24 | Robert Bos | Irregular pattern treatment of a subsurface formation |
US8434555B2 (en) | 2009-04-10 | 2013-05-07 | Shell Oil Company | Irregular pattern treatment of a subsurface formation |
US20100258291A1 (en) * | 2009-04-10 | 2010-10-14 | Everett De St Remey Edward | Heated liners for treating subsurface hydrocarbon containing formations |
US20100258265A1 (en) * | 2009-04-10 | 2010-10-14 | John Michael Karanikas | Recovering energy from a subsurface formation |
US8448707B2 (en) | 2009-04-10 | 2013-05-28 | Shell Oil Company | Non-conducting heater casings |
US20100258309A1 (en) * | 2009-04-10 | 2010-10-14 | Oluropo Rufus Ayodele | Heater assisted fluid treatment of a subsurface formation |
US8327932B2 (en) | 2009-04-10 | 2012-12-11 | Shell Oil Company | Recovering energy from a subsurface formation |
US8485847B2 (en) * | 2009-10-09 | 2013-07-16 | Shell Oil Company | Press-fit coupling joint for joining insulated conductors |
US20110124228A1 (en) * | 2009-10-09 | 2011-05-26 | John Matthew Coles | Compacted coupling joint for coupling insulated conductors |
US8257112B2 (en) | 2009-10-09 | 2012-09-04 | Shell Oil Company | Press-fit coupling joint for joining insulated conductors |
US20110124223A1 (en) * | 2009-10-09 | 2011-05-26 | David Jon Tilley | Press-fit coupling joint for joining insulated conductors |
US8356935B2 (en) | 2009-10-09 | 2013-01-22 | Shell Oil Company | Methods for assessing a temperature in a subsurface formation |
US20110132661A1 (en) * | 2009-10-09 | 2011-06-09 | Patrick Silas Harmason | Parallelogram coupling joint for coupling insulated conductors |
US9466896B2 (en) | 2009-10-09 | 2016-10-11 | Shell Oil Company | Parallelogram coupling joint for coupling insulated conductors |
US20110134958A1 (en) * | 2009-10-09 | 2011-06-09 | Dhruv Arora | Methods for assessing a temperature in a subsurface formation |
US8816203B2 (en) | 2009-10-09 | 2014-08-26 | Shell Oil Company | Compacted coupling joint for coupling insulated conductors |
US8939207B2 (en) | 2010-04-09 | 2015-01-27 | Shell Oil Company | Insulated conductor heaters with semiconductor layers |
US8631866B2 (en) | 2010-04-09 | 2014-01-21 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8820406B2 (en) | 2010-04-09 | 2014-09-02 | Shell Oil Company | Electrodes for electrical current flow heating of subsurface formations with conductive material in wellbore |
US8859942B2 (en) | 2010-04-09 | 2014-10-14 | Shell Oil Company | Insulating blocks and methods for installation in insulated conductor heaters |
US8739874B2 (en) | 2010-04-09 | 2014-06-03 | Shell Oil Company | Methods for heating with slots in hydrocarbon formations |
US9399905B2 (en) | 2010-04-09 | 2016-07-26 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8502120B2 (en) | 2010-04-09 | 2013-08-06 | Shell Oil Company | Insulating blocks and methods for installation in insulated conductor heaters |
US8701768B2 (en) | 2010-04-09 | 2014-04-22 | Shell Oil Company | Methods for treating hydrocarbon formations |
US8833453B2 (en) | 2010-04-09 | 2014-09-16 | Shell Oil Company | Electrodes for electrical current flow heating of subsurface formations with tapered copper thickness |
US8967259B2 (en) | 2010-04-09 | 2015-03-03 | Shell Oil Company | Helical winding of insulated conductor heaters for installation |
US9127523B2 (en) | 2010-04-09 | 2015-09-08 | Shell Oil Company | Barrier methods for use in subsurface hydrocarbon formations |
US9022109B2 (en) | 2010-04-09 | 2015-05-05 | Shell Oil Company | Leak detection in circulated fluid systems for heating subsurface formations |
US8701769B2 (en) | 2010-04-09 | 2014-04-22 | Shell Oil Company | Methods for treating hydrocarbon formations based on geology |
US9033042B2 (en) | 2010-04-09 | 2015-05-19 | Shell Oil Company | Forming bitumen barriers in subsurface hydrocarbon formations |
US9127538B2 (en) | 2010-04-09 | 2015-09-08 | Shell Oil Company | Methodologies for treatment of hydrocarbon formations using staged pyrolyzation |
US8485256B2 (en) | 2010-04-09 | 2013-07-16 | Shell Oil Company | Variable thickness insulated conductors |
US8943686B2 (en) | 2010-10-08 | 2015-02-03 | Shell Oil Company | Compaction of electrical insulation for joining insulated conductors |
US9337550B2 (en) | 2010-10-08 | 2016-05-10 | Shell Oil Company | End termination for three-phase insulated conductors |
US9755415B2 (en) | 2010-10-08 | 2017-09-05 | Shell Oil Company | End termination for three-phase insulated conductors |
US8586867B2 (en) | 2010-10-08 | 2013-11-19 | Shell Oil Company | End termination for three-phase insulated conductors |
US8586866B2 (en) | 2010-10-08 | 2013-11-19 | Shell Oil Company | Hydroformed splice for insulated conductors |
US8732946B2 (en) | 2010-10-08 | 2014-05-27 | Shell Oil Company | Mechanical compaction of insulator for insulated conductor splices |
US8857051B2 (en) | 2010-10-08 | 2014-10-14 | Shell Oil Company | System and method for coupling lead-in conductor to insulated conductor |
US9016370B2 (en) | 2011-04-08 | 2015-04-28 | Shell Oil Company | Partial solution mining of hydrocarbon containing layers prior to in situ heat treatment |
US9048653B2 (en) | 2011-04-08 | 2015-06-02 | Shell Oil Company | Systems for joining insulated conductors |
US9309755B2 (en) | 2011-10-07 | 2016-04-12 | Shell Oil Company | Thermal expansion accommodation for circulated fluid systems used to heat subsurface formations |
US9226341B2 (en) | 2011-10-07 | 2015-12-29 | Shell Oil Company | Forming insulated conductors using a final reduction step after heat treating |
US9080409B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | Integral splice for insulated conductors |
US9080917B2 (en) | 2011-10-07 | 2015-07-14 | Shell Oil Company | System and methods for using dielectric properties of an insulated conductor in a subsurface formation to assess properties of the insulated conductor |
US9394917B2 (en) * | 2011-10-18 | 2016-07-19 | Los Alamos National Security, Llc | Cooling devices and methods for use with electric submersible pumps |
US9797402B2 (en) | 2011-10-18 | 2017-10-24 | Chevron U.S.A. Inc. | Cooling devices and methods for use with electric submersible pumps |
US10047594B2 (en) | 2012-01-23 | 2018-08-14 | Genie Ip B.V. | Heater pattern for in situ thermal processing of a subsurface hydrocarbon containing formation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2244255A (en) | Well clearing system | |
US2244256A (en) | Apparatus for clearing wells | |
US3149672A (en) | Method and apparatus for electrical heating of oil-bearing formations | |
US3547193A (en) | Method and apparatus for recovery of minerals from sub-surface formations using electricity | |
US2670802A (en) | Reviving or increasing the production of clogged or congested oil wells | |
US4412585A (en) | Electrothermal process for recovering hydrocarbons | |
US3133592A (en) | Apparatus for the application of electrical energy to subsurface formations | |
US2472445A (en) | Apparatus for treating oil and gas bearing strata | |
CA1294309C (en) | Mineral well heating systems | |
US3605888A (en) | Method and apparatus for secondary recovery of oil | |
US2757738A (en) | Radiation heating | |
US4296969A (en) | Thermal recovery of viscous hydrocarbons using arrays of radially spaced horizontal wells | |
US4716960A (en) | Method and system for introducing electric current into a well | |
US4570715A (en) | Formation-tailored method and apparatus for uniformly heating long subterranean intervals at high temperature | |
US5070533A (en) | Robust electrical heating systems for mineral wells | |
US4524827A (en) | Single well stimulation for the recovery of liquid hydrocarbons from subsurface formations | |
CA2049627C (en) | Recovering hydrocarbons from hydrocarbon bearing deposits | |
US4730671A (en) | Viscous oil recovery using high electrical conductive layers | |
US4319632A (en) | Oil recovery well paraffin elimination means | |
US8265468B2 (en) | Inline downhole heater and methods of use | |
US2749989A (en) | Method and means of completing a well | |
US2914124A (en) | Oil well heating system | |
US2980184A (en) | Method and apparatus for producing wells | |
US4378846A (en) | Enhanced oil recovery apparatus and method | |
US2363269A (en) | Method for sealing borehole casings |