EP2409892A1 - Data input support device and data input support method - Google Patents

Data input support device and data input support method Download PDF

Info

Publication number
EP2409892A1
EP2409892A1 EP10753474A EP10753474A EP2409892A1 EP 2409892 A1 EP2409892 A1 EP 2409892A1 EP 10753474 A EP10753474 A EP 10753474A EP 10753474 A EP10753474 A EP 10753474A EP 2409892 A1 EP2409892 A1 EP 2409892A1
Authority
EP
European Patent Office
Prior art keywords
train
route
information database
signal aspect
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP10753474A
Other languages
German (de)
French (fr)
Other versions
EP2409892A4 (en
Inventor
Daisuke Yagyu
Koji Tomita
Hideki Osumi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of EP2409892A1 publication Critical patent/EP2409892A1/en
Publication of EP2409892A4 publication Critical patent/EP2409892A4/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
    • B61L25/06Indicating or recording the setting of track apparatus, e.g. of points, of signals
    • B61L25/08Diagrammatic displays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/14Following schedules

Definitions

  • the present invention relates to a data entry support device and a data entry support method for displaying graphic data such as the train lines (lines) in a train operation diagram, and more particularly to a data entry support device and a data entry support method that display a route control status on a train line to reduce the time required for judging the entry contents of a traffic schedule change and to allow an operator to readily enter a traffic schedule change that need immediate processing.
  • a conventional train traffic management system which controls trains based on a diagram, judges the contents of an entered diagram change based on the information from the traffic schedule change entry screen, on which graphic data such as the train lines of the train operation diagram are displayed, and on the information from the operation control display screen on which graphic data, such as the train locations and the route control status, is displayed in the interlocking table.
  • the operator must search the operation control display screen for the number of a train to which a traffic schedule change is to be applied, check the control status of the route on which the train is to travel and, after that, enter a traffic schedule change from the traffic schedule change entry screen. To do so, the operator must compare the information displayed on multiple screens for comprehensively checking information necessary for the traffic schedule change processing and, so, the operator sometimes makes an entry error in which case re-entry operation is necessary-
  • Another problem is that judging the contents of an entered traffic schedule change takes long and so, during the traffic schedule change processing that needs immediate processing, the train may pass the location, to which a traffic schedule change is to be applied, before data is entered.
  • One way to solve this problem is to add information, other than train lines, to the traffic schedule change entry screen.
  • One of conventional traffic schedule change entry screens is disclosed, for example, in Patent literature 1.
  • a location is specified on the train schedule diagram, and the predicted route map screen display data, which indicates the predicted train operation corresponding to the time and the location on the route calculated by the location specification unit, is displayed on the traffic schedule change entry screen, on which the train schedule diagram is displayed, as the predicted route map screen in the route map format.
  • Patent literature 2 Another method is disclosed in Patent literature 2. In this method, when the travel result of the train schedule diagram is displayed, the travel result is captured for each track circuit and the result diagram, in which the length of each track circuit is reflected, is displayed to allow the operator to identify the location of the train on the train schedule diagram.
  • the location of the train can be identified on the train schedule diagram but the route control status at each station is not displayed on the train diagram display device. This requires the dispatcher to reference the operation control display screen to understand the route control status, sometimes preventing the dispatcher from taking action when the train is in the control range of a station and a traffic schedule change must be entered immediately.
  • a data entry support device and a data entry support method of the present invention comprehensively display information, necessary for judging the contents of a traffic schedule change, on the traffic schedule change entry screen by displaying a route control status, which will be controlled next by a train, on the train line on the traffic schedule change entry screen.
  • the present invention prevents an entry error when a traffic schedule change is entered and reduces the time required for judging the contents of the entry, thus allowing the dispatcher to process a traffic schedule change that needs immediate processing and to enter a traffic schedule change without delay.
  • FIG. 1 to FIG. 5 One embodiment of the present invention will be described with reference FIG. 1 to FIG. 5 using an example of a traffic schedule change device on which a train operation diagram is displayed.
  • FIG. 1 is a diagram showing the configuration of a train traffic management system that manages train operation.
  • the train traffic management system in this embodiment comprises a traffic schedule change device 1 that displays a train operation diagram, receives a train operation change, and displays a train operation result on the train operation diagram, station control devices 2 such as station systems each of which controls the routes at a station or on rail tracks or controls the train operation, and a train operation management device 3 that manages the train operation, relays data between the traffic schedule change device 1 and the station control device 2, and checks data consistency.
  • Those devices are connected via a network.
  • the traffic schedule change device 1 receives information on the train operation and displays the information on the display as the train operation diagram to support the entry of a train operation change (also called a traffic schedule change).
  • the contents of a change in the train operation entered into the traffic schedule change device I are sent to the station control device 2 via the train operation management device 3.
  • the station control device 2 controls the operation of the routes and trains based on a train operation change received from the train operation management device 3.
  • FIG. 2 is a processing block diagram of the traffic schedule change device in this embodiment
  • FIG.2 shows an example of the required configuration and other components may be added as necessary.
  • the traffic schedule change device 1 has a train operation information database 201, a train location information database 202, a train route information database 203, and a signal aspect information database 204, and comprises a control information reception unit 205 that receives control information from the station control device 2, a train operation information reception unit 206 that receives train operation information from the train operation management device 3, a train operation change processing unit 207 that changes the train operation based on received traffic schedule change information, a train schedule diagram data creation processing unit 208 that creates train schedule diagram data from the train operation information, a control status judgment processing unit 209, a signal aspect display position judgment processing unit 210, and a display processing unit 211 that displays data on a display 212.
  • the train operation information database 201 stores train operation information received by the train operation information reception unit 206, and the train location information database 202 stores received train traveling locations.
  • the signal aspect information database 204 stores control information received by the control information reception unit 205.
  • the control status judgment processing unit 209 judges the route control status (signal aspect), which will be controlled next by a train being processed, based on the information in the train location information database 202, train route information database 203, and signal aspect information database 204.
  • the signal aspect display position judgment processing unit 210 calculates a position in the train schedule diagram data, created by the train schedule diagram data creation processing unit 208, where the route control status of a train determined by the control status judgment processing unit 209 is displayed.
  • FIG. 3 is a diagram showing an example of the screen of the display 212.
  • the operation plan information is displayed as train lines 30 with station names on the vertical axis and the time on the horizontal axis, and a route control status 31 is displayed on the train line 30 to support the dispatcher in the traffic schedule change operation.
  • the route control status 31 indicates, in color, the control status of a route which is one of the arrival routes or departure routes to be controlled next by each train and which is near to the location of the train. This display allows the operator to immediately understand the status of a train to which a traffic schedule change is to be applied.
  • the train schedule diagram managed by the traffic schedule change device 1 on a train basis is made to correspond to the control status of a route, which is a facility in the field, to allow the route control status to be displayed on the train schedule diagram.
  • the following describes the flow of processing for establishing the correspondence between the train schedule diagram and the route control status with reference to FIG. 4 .
  • FIG. 4 shows the outline of the processing flow of the control status judgment processing unit 209 that judges the signal aspect that will be controlled by a train to be processed and the processing flow of the signal aspect display position judgment processing unit 210 that judges the location at which the route control status is displayed on the train schedule diagram.
  • step 402 the control status judgment processing unit 209 acquires train numbers from the train operation information database 201 and, in step 403, selects a train number to be processed.
  • step 404 the control status judgment processing unit 209 acquires the train location information corresponding to the train number selected from the train location information database 202 and, in step 405, acquires the train route information from the train route information database 203.
  • control status judgment processing unit 209 judges the train location from the acquired train location information and passes control to one of the three, (1) to (3), according to the train location.
  • control is passed to step 407 and the signal aspect is set to "red".
  • control is passed to step 408 and the route to the arrival track is acquired from the train route information acquired in step 405.
  • the signal aspect status information on the route on the acquired route is obtained from the signal aspect information database 204, and the signal aspect of the arrival route is used as the signal aspect.
  • step 410 When the train is at a location between the arrival route and the departure route, control is passed to step 410 and the arrival track is obtained from the train route information acquired in step 405.
  • the signal aspect of the departure route corresponding to the acquired track number is obtained from the signal aspect information database 204 and the obtained signal aspect is used as the signal aspect.
  • step 412 of the processing flow control of the processing flow is passed to one of the two, (1) and (2), according to the train location acquired from the train location information database 202.
  • control is passed to step 413 and the control status is displayed on the train line that indicates the departure time at the station at which the train is located.
  • step 414 If the train is at a location not between the arrival route and the departure route, control is passed to step 414 and the control status is displayed on the train line that indicates the arrival time at the next station of the station at which the train is located.
  • step 415 A check is made in step 415 if there is another train number to be edited. If there is no train number to be edited, control is passed to step 416 to terminate the processing; if there is another train number to be edited, control is passed back to step 403.
  • the following describes the processing for relating a train number to the arrival track, train location, and the route to the arrival track corresponding to the train based on the train operation information database 201, train location information database 202, and train route information database 203.
  • the train operation information database 201 has a train operation information table 501 that manages the stop stations, arrival times, departure times, and arrival tracks for each train number.
  • the train location information database 202 has a train location information table 502 that manages the train-located station name and the track circuits for each train number.
  • the train location information database 202 may be related to the train operation information database 201 by the processing in step 404 in FIG. 4 using the train number as the key.
  • the train route information database 203 has a train route information table 503 that manages, for each train number, the track circuits on which the train travels and the facility information and the route names corresponding to the track circuits.
  • the train route information database 203 may be related to the train location information database 202 by the processing in step 405 in FIG. 4 using the train number and the track circuit as the key so that the track circuits on which the train travels, the facility information, and the route names may be acquired. Therefore, executing a sequence of processing from step 404 to step 405 allows the arrival track, the train location, and the route to the arrival track corresponding to a train to be acquired.
  • the train operation is related to the route control status, which will be controlled next by the train, to display the route control status on the train operation diagram. This allows the dispatcher to judge the entry contents of a traffic schedule change, which have conventionally been acquired from multiple terminals, on the traffic schedule change entry screen alone.
  • the traffic schedule change device in this embodiment prevents an entry error and allows the dispatcher to take action on a traffic schedule change that needs immediate processing.

Abstract

A data input device is capable of displaying the control state of a traffic signal on a train diagram by acquiring train operation information from a diagram information database (201), creating a train line, displaying the train line on an operation arrangement input device (1), and bringing the train diagram and the control state of a traffic signal to be controlled next by the train into correspondence from control state determination processing (209) and indication display position determination processing (210). As a result, the content of operation arrangement can be determined simply by looking at the display on the operation arrangement input device, thereby making it possible to achieve the prevention of input errors in the operation arrangement, and the input of urgent operation arrangement.

Description

    TECHNICAL FIELD
  • The present invention relates to a data entry support device and a data entry support method for displaying graphic data such as the train lines (lines) in a train operation diagram, and more particularly to a data entry support device and a data entry support method that display a route control status on a train line to reduce the time required for judging the entry contents of a traffic schedule change and to allow an operator to readily enter a traffic schedule change that need immediate processing.
  • BACKGROUND ART
  • A conventional train traffic management system, which controls trains based on a diagram, judges the contents of an entered diagram change based on the information from the traffic schedule change entry screen, on which graphic data such as the train lines of the train operation diagram are displayed, and on the information from the operation control display screen on which graphic data, such as the train locations and the route control status, is displayed in the interlocking table.
  • In this case, the operator must search the operation control display screen for the number of a train to which a traffic schedule change is to be applied, check the control status of the route on which the train is to travel and, after that, enter a traffic schedule change from the traffic schedule change entry screen. To do so, the operator must compare the information displayed on multiple screens for comprehensively checking information necessary for the traffic schedule change processing and, so, the operator sometimes makes an entry error in which case re-entry operation is necessary- Another problem is that judging the contents of an entered traffic schedule change takes long and so, during the traffic schedule change processing that needs immediate processing, the train may pass the location, to which a traffic schedule change is to be applied, before data is entered.
  • One way to solve this problem is to add information, other than train lines, to the traffic schedule change entry screen. One of conventional traffic schedule change entry screens is disclosed, for example, in Patent literature 1. In this method, a location is specified on the train schedule diagram, and the predicted route map screen display data, which indicates the predicted train operation corresponding to the time and the location on the route calculated by the location specification unit, is displayed on the traffic schedule change entry screen, on which the train schedule diagram is displayed, as the predicted route map screen in the route map format.
  • Another method is disclosed in Patent literature 2. In this method, when the travel result of the train schedule diagram is displayed, the travel result is captured for each track circuit and the result diagram, in which the length of each track circuit is reflected, is displayed to allow the operator to identify the location of the train on the train schedule diagram.
  • CITATION LIST PATENT LITERATURE
    • Patent literature 1: JP-A-2004-230958
    • Patent literature 2: JP-A-2005-319927
    SUMMARY OF INVENTION TECHNICAL PROBLEM
  • In the method disclosed in Patent literature 1, because a location is specified on the train schedule diagram to acquire information necessary for changing the traffic schedule, the control status display range is limited to a part of the range for which the dispatcher is responsible. In addition, displaying both the train schedule diagram and the predicted route map on the same screen requires the dispatcher to compare the displays, sometimes preventing the dispatcher from taking action for a traffic schedule change that need immediate processing.
  • In the method disclosed in Patent literature 2, the location of the train can be identified on the train schedule diagram but the route control status at each station is not displayed on the train diagram display device. This requires the dispatcher to reference the operation control display screen to understand the route control status, sometimes preventing the dispatcher from taking action when the train is in the control range of a station and a traffic schedule change must be entered immediately.
  • It is an object of the present invention to provide a data entry support device and a data entry support method that display information, necessary for judging the entry contents of a traffic schedule change, on one display device to reduce the time required before entering the traffic schedule change to solve a train schedule disruption problem.
  • SOLUTION TO PROBLEM
  • To achieve the object described above, a data entry support device and a data entry support method of the present invention comprehensively display information, necessary for judging the contents of a traffic schedule change, on the traffic schedule change entry screen by displaying a route control status, which will be controlled next by a train, on the train line on the traffic schedule change entry screen.
  • ADVANTAGEOUS EFFECTS OF INVENTION
  • The present invention prevents an entry error when a traffic schedule change is entered and reduces the time required for judging the contents of the entry, thus allowing the dispatcher to process a traffic schedule change that needs immediate processing and to enter a traffic schedule change without delay.
    Other objects, features and advantages of the present invention will become apparent from the following description of the embodiments according to the invention taken in conjunction the accompanying drawings.
  • BRIEF DESCRIPTION OF DRAWINGS
    • FIG. 1 is a diagram showing the configuration of a train traffic management system that manages the train operation in one embodiment of the present invention.
    • FIG. 2 is a processing block diagram showing a traffic schedule change device in the embodiment.
    • FIG. 3 is a diagram showing an example of a train operation screen.
    • FIG. 4 is a processing flow showing control status judgment processing and signal aspect display location judgment processing.
    • FIG. 5 is a diagram showing processing in which a train number is related to the arrival track, the train location, and the route to the arrival track corresponding to the train.
    DESCRIPTION OF EMBODIMENTS
  • One embodiment of the present invention will be described with reference FIG. 1 to FIG. 5 using an example of a traffic schedule change device on which a train operation diagram is displayed.
  • FIG. 1 is a diagram showing the configuration of a train traffic management system that manages train operation. As shown in FIG. 1, the train traffic management system in this embodiment comprises a traffic schedule change device 1 that displays a train operation diagram, receives a train operation change, and displays a train operation result on the train operation diagram, station control devices 2 such as station systems each of which controls the routes at a station or on rail tracks or controls the train operation, and a train operation management device 3 that manages the train operation, relays data between the traffic schedule change device 1 and the station control device 2, and checks data consistency. Those devices are connected via a network.
  • The traffic schedule change device 1 receives information on the train operation and displays the information on the display as the train operation diagram to support the entry of a train operation change (also called a traffic schedule change). The contents of a change in the train operation entered into the traffic schedule change device I are sent to the station control device 2 via the train operation management device 3. The station control device 2 controls the operation of the routes and trains based on a train operation change received from the train operation management device 3.
  • FIG. 2 is a processing block diagram of the traffic schedule change device in this embodiment FIG.2 shows an example of the required configuration and other components may be added as necessary.
  • As shown in FIG. 2, the traffic schedule change device 1 has a train operation information database 201, a train location information database 202, a train route information database 203, and a signal aspect information database 204, and comprises a control information reception unit 205 that receives control information from the station control device 2, a train operation information reception unit 206 that receives train operation information from the train operation management device 3, a train operation change processing unit 207 that changes the train operation based on received traffic schedule change information, a train schedule diagram data creation processing unit 208 that creates train schedule diagram data from the train operation information, a control status judgment processing unit 209, a signal aspect display position judgment processing unit 210, and a display processing unit 211 that displays data on a display 212.
  • The train operation information database 201 stores train operation information received by the train operation information reception unit 206, and the train location information database 202 stores received train traveling locations. The signal aspect information database 204 stores control information received by the control information reception unit 205.
  • The control status judgment processing unit 209 judges the route control status (signal aspect), which will be controlled next by a train being processed, based on the information in the train location information database 202, train route information database 203, and signal aspect information database 204.
  • The signal aspect display position judgment processing unit 210 calculates a position in the train schedule diagram data, created by the train schedule diagram data creation processing unit 208, where the route control status of a train determined by the control status judgment processing unit 209 is displayed.
  • FIG. 3 is a diagram showing an example of the screen of the display 212. On the display 212, the operation plan information is displayed as train lines 30 with station names on the vertical axis and the time on the horizontal axis, and a route control status 31 is displayed on the train line 30 to support the dispatcher in the traffic schedule change operation.
  • The route control status 31 indicates, in color, the control status of a route which is one of the arrival routes or departure routes to be controlled next by each train and which is near to the location of the train. This display allows the operator to immediately understand the status of a train to which a traffic schedule change is to be applied.
  • In this embodiment, the train schedule diagram managed by the traffic schedule change device 1 on a train basis is made to correspond to the control status of a route, which is a facility in the field, to allow the route control status to be displayed on the train schedule diagram. The following describes the flow of processing for establishing the correspondence between the train schedule diagram and the route control status with reference to FIG. 4.
  • FIG. 4 shows the outline of the processing flow of the control status judgment processing unit 209 that judges the signal aspect that will be controlled by a train to be processed and the processing flow of the signal aspect display position judgment processing unit 210 that judges the location at which the route control status is displayed on the train schedule diagram.
  • First, the following describes the processing flow of the control status judgment processing unit 209. In step 402, the control status judgment processing unit 209 acquires train numbers from the train operation information database 201 and, in step 403, selects a train number to be processed. In step 404, the control status judgment processing unit 209 acquires the train location information corresponding to the train number selected from the train location information database 202 and, in step 405, acquires the train route information from the train route information database 203.
  • In step 406, the control status judgment processing unit 209 judges the train location from the acquired train location information and passes control to one of the three, (1) to (3), according to the train location.
  • (1) When the train is at a location between the departure route and the control point, control is passed to step 407 and the signal aspect is set to "red".
  • (2) When the train is at a location between the control point and the arrival route, control is passed to step 408 and the route to the arrival track is acquired from the train route information acquired in step 405. The signal aspect status information on the route on the acquired route is obtained from the signal aspect information database 204, and the signal aspect of the arrival route is used as the signal aspect.
  • (3) When the train is at a location between the arrival route and the departure route, control is passed to step 410 and the arrival track is obtained from the train route information acquired in step 405. The signal aspect of the departure route corresponding to the acquired track number is obtained from the signal aspect information database 204 and the obtained signal aspect is used as the signal aspect.
  • Next, the following describes the processing flow of the signal aspect display position judgment processing unit 210. In step 412 of the processing flow, control of the processing flow is passed to one of the two, (1) and (2), according to the train location acquired from the train location information database 202.
  • (1) If the train is at a location between the arrival route and the departure route, control is passed to step 413 and the control status is displayed on the train line that indicates the departure time at the station at which the train is located.
  • (2) If the train is at a location not between the arrival route and the departure route, control is passed to step 414 and the control status is displayed on the train line that indicates the arrival time at the next station of the station at which the train is located.
  • A check is made in step 415 if there is another train number to be edited. If there is no train number to be edited, control is passed to step 416 to terminate the processing; if there is another train number to be edited, control is passed back to step 403.
  • Referring to FIG. 5, the following describes the processing for relating a train number to the arrival track, train location, and the route to the arrival track corresponding to the train based on the train operation information database 201, train location information database 202, and train route information database 203.
  • The train operation information database 201 has a train operation information table 501 that manages the stop stations, arrival times, departure times, and arrival tracks for each train number. The train location information database 202 has a train location information table 502 that manages the train-located station name and the track circuits for each train number. The train location information database 202 may be related to the train operation information database 201 by the processing in step 404 in FIG. 4 using the train number as the key.
  • The train route information database 203 has a train route information table 503 that manages, for each train number, the track circuits on which the train travels and the facility information and the route names corresponding to the track circuits. The train route information database 203 may be related to the train location information database 202 by the processing in step 405 in FIG. 4 using the train number and the track circuit as the key so that the track circuits on which the train travels, the facility information, and the route names may be acquired. Therefore, executing a sequence of processing from step 404 to step 405 allows the arrival track, the train location, and the route to the arrival track corresponding to a train to be acquired.
  • In this embodiment, the train operation is related to the route control status, which will be controlled next by the train, to display the route control status on the train operation diagram. This allows the dispatcher to judge the entry contents of a traffic schedule change, which have conventionally been acquired from multiple terminals, on the traffic schedule change entry screen alone.
  • As described above, the traffic schedule change device in this embodiment prevents an entry error and allows the dispatcher to take action on a traffic schedule change that needs immediate processing.
  • When this embodiment is applied to a device on which a train operation diagram is displayed and a traffic schedule change is accepted, the control status of a route can be displayed on a train line. And, so, this configuration allows the dispatcher to judge the contents of a traffic schedule change simply by viewing the display on the traffic schedule change entry device, thus preventing an entry error and making it possible to accept a traffic schedule change that needs immediate processing.
    It should be understood by those skilled in the art that although the foregoing description has been made on the embodiments of the present invention, the invention is not limited thereto and various changes and modifications may be made without departing from the spirit and the scope of the appended claims.
  • REFERENCE SIGNS LIST
  • 1
    traffic schedule change device
    2
    station control device
    3
    train operation management device
    30
    train line
    31
    route control status
    201
    train operation information database
    202
    train location information database
    203
    train route information database
    204
    signal aspect information database

Claims (7)

  1. A data entry support device, comprising:
    a train schedule diagram data creation processing unit that acquires train operation information on a train from a train operation information database in which information on a train operation plan is stored, creates train schedule diagram data, and displays a train schedule diagram on a train operation screen;
    a control status judgment processing unit that selects a train number from train numbers acquired from said train operation information database, acquires train location information, corresponding to the train number, from a train location information database and, train route information, corresponding to the train number, from a train route information database, and judges a signal aspect of a route from the acquired route information on the train number and from a signal aspect information database; and
    a signal aspect display position judgment processing unit that judges a position where the signal aspect of the route is displayed on the train schedule diagram
    whereby a route control status is displayed on the train schedule diagram.
  2. The data entry support device according to claim 1 wherein, when a train with the train number is located between an arrival route and a departure route, the route control status is displayed on a train line indicating a departure time at a train-located station.
  3. The data entry support device according to claim 1 wherein, when a train with the train number is located not between an arrival route and a departure route, the route control status is displayed on a train line indicating a departure time at a next station of a train-located station.
  4. A data entry support method comprising the steps of:
    by a train schedule diagram data creation processing unit, acquiring train operation information on a train from a train operation information database in which information on a train operation plan is stored, creating train schedule diagram data, and displaying a train schedule diagram on a train operation screen;
    by a control status judgment processing unit, selecting a train number from train numbers acquired from said train operation information database, acquiring train location information, corresponding to the train number, from a train location information database and, based on the train location information, train route information, corresponding to the train number, from a train route information database, and judging a signal aspect of a route from the acquired route information on the train number and from a signal aspect information database; and
    by a signal aspect display position judgment processing unit, judging a position where the signal aspect of the route is displayed on the train schedule diagram,
    whereby a route control status is displayed on the train schedule diagram.
  5. The data entry support method according to claim 4 wherein, when the train is located between a departure route and a control point, the signal aspect of the route is a red signal.
  6. The data entry support method according to claim 4 wherein, when the train is located between a control point and an arrival route, the signal aspect of the arrival route is obtained from a signal aspect information database and is displayed.
  7. The data entry support method according to claim 4 wherein, when the train is located between an arrival route and a departure route, the signal aspect of the departure route is obtained from a signal aspect information database and is displayed.
EP10753474.5A 2009-03-16 2010-03-12 Data input support device and data input support method Withdrawn EP2409892A4 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009062220A JP5183535B2 (en) 2009-03-16 2009-03-16 Data input support device and data input support method
PCT/JP2010/054232 WO2010106982A1 (en) 2009-03-16 2010-03-12 Data input support device and data input support method

Publications (2)

Publication Number Publication Date
EP2409892A1 true EP2409892A1 (en) 2012-01-25
EP2409892A4 EP2409892A4 (en) 2013-06-19

Family

ID=42082714

Family Applications (1)

Application Number Title Priority Date Filing Date
EP10753474.5A Withdrawn EP2409892A4 (en) 2009-03-16 2010-03-12 Data input support device and data input support method

Country Status (4)

Country Link
EP (1) EP2409892A4 (en)
JP (1) JP5183535B2 (en)
GB (1) GB2468745B (en)
WO (1) WO2010106982A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2899094A4 (en) * 2012-09-18 2016-08-03 Toshiba Kk Timetable creation device, timetable creation method, and timetable display program

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG173871A1 (en) * 2009-03-09 2011-09-29 Mitsubishi Electric Corp Train information display system and train information display device
JP5505229B2 (en) 2010-09-27 2014-05-28 株式会社デンソー Engine control device
JP5492752B2 (en) * 2010-11-26 2014-05-14 株式会社日立製作所 Train stop position display guidance system
CN103226549B (en) 2012-01-31 2016-09-07 国际商业机器公司 The method and apparatus that the display of route map of train is reconstructed
JP5882831B2 (en) * 2012-05-22 2016-03-09 株式会社日立製作所 Train and moving body display method, operation grasping device, and operation management system
CN102963400B (en) * 2012-09-10 2015-04-22 中国铁道科学研究院 Method and device for realizing graphical display of inlet route instructions

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040133315A1 (en) * 2003-01-06 2004-07-08 General Electric Company Multi-level railway operations optimization system and method
US20060212187A1 (en) * 2003-02-27 2006-09-21 Wills Mitchell S Scheduler and method for managing unpredictable local trains

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3089240B1 (en) * 1999-06-01 2000-09-18 株式会社京三製作所 Automatic diamond organizer
US6799097B2 (en) * 2002-06-24 2004-09-28 Modular Mining Systems, Inc. Integrated railroad system
JP4247006B2 (en) * 2003-01-29 2009-04-02 株式会社日立製作所 Train operation prediction device
JP3915741B2 (en) * 2003-06-19 2007-05-16 株式会社日立製作所 Data input support device and data input support method
JP2005153789A (en) * 2003-11-27 2005-06-16 Hitachi Ltd Operation/operation control circumstance display system and method
JP2005212548A (en) * 2004-01-28 2005-08-11 Hitachi Ltd Train service display change system, server computer, and client computer
JP4305272B2 (en) * 2004-05-11 2009-07-29 株式会社日立製作所 Train diagram display device
JP2006131123A (en) * 2004-11-08 2006-05-25 Hitachi Ltd Operation schedule display device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040133315A1 (en) * 2003-01-06 2004-07-08 General Electric Company Multi-level railway operations optimization system and method
US20060212187A1 (en) * 2003-02-27 2006-09-21 Wills Mitchell S Scheduler and method for managing unpredictable local trains

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
BARKE S ET AL: "LEITSYSTEME VON SIEMENS FUER BETRIEBSZENTRALEN", SIGNAL + DRAHT, TELZLAFF VERLAG GMBH. DARMSTADT, DE, vol. 93, no. 4, 1 April 2001 (2001-04-01), pages 5-11, XP001206498, ISSN: 0037-4997 *
BREU S ET AL: "LEIDIS-N - NETZDISPOSITION IN DER NETZLEITZENTRALE DER DB AG IN FRANKFURT", SIGNAL + DRAHT, TELZLAFF VERLAG GMBH. DARMSTADT, DE, vol. 95, no. 6, 1 June 2003 (2003-06-01), pages 14-19, XP001206496, ISSN: 0037-4997 *
HORST BARNER ET AL: "Rechnerunterstà 1/4 tzte Zugà 1/4 berwachung", SIGNAL + DRAHT,, vol. 75, no. 4, 1 April 1983 (1983-04-01), pages 59-61, XP001389912, *
See also references of WO2010106982A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2899094A4 (en) * 2012-09-18 2016-08-03 Toshiba Kk Timetable creation device, timetable creation method, and timetable display program
US9522689B2 (en) 2012-09-18 2016-12-20 Kabushiki Kaisha Toshiba Diagram creating device, diagram creating method, and diagram display program

Also Published As

Publication number Publication date
GB2468745B (en) 2011-07-13
WO2010106982A1 (en) 2010-09-23
GB201002110D0 (en) 2010-03-24
JP2010215044A (en) 2010-09-30
JP5183535B2 (en) 2013-04-17
EP2409892A4 (en) 2013-06-19
GB2468745A (en) 2010-09-22

Similar Documents

Publication Publication Date Title
EP2409892A1 (en) Data input support device and data input support method
US9393976B2 (en) Train guidance-display system and train guidance-display method
JP2007112321A (en) Train operation information providing system for station staff
US8781803B2 (en) Method and device for generating and publishing a railway signaling diagram
KR100831387B1 (en) Train operation management system
JP4573661B2 (en) Distributed train operation management system and control method thereof
JP2007118674A (en) Operation arrangement supporting system and operation arrangement supporting method
EP3351453A1 (en) Operation rescheduling support apparatus and system
JP6788488B2 (en) Vehicle operation business support system
JP2008184032A (en) Diagram preparation device
JP4721812B2 (en) Vehicle / crew crew operation recovery device
JP2018090139A (en) Vehicle application business support system
WO2012169333A1 (en) Operation rescheduling support system
JP2007276553A (en) Display control method to passenger guide device
JP2019104306A (en) Traffic operational information integrated management system and traffic operational information integrated management method
EP2747005A1 (en) Determining real-time delay of transportation means
EP3393885B1 (en) Display system and method for displaying messages in a passenger compartment of a vehicle
GB2366419A (en) Railway maintenance work administration system
JP2015039994A (en) Train operation command apparatus and train operation management system
JP4142271B2 (en) Operation organization display device for train operation management
JP4157458B2 (en) Transportation information display system
JP2011063213A (en) Device and method for distributing traffic information
JP7182582B2 (en) Intermediate station guidance device
JP2008222223A (en) Railroad traffic operation arrangement apparatus of train operation control system
JPH09132144A (en) Train diagram display device

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20110822

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20130516

RIC1 Information provided on ipc code assigned before grant

Ipc: B61L 27/00 20060101AFI20130510BHEP

Ipc: B61L 21/06 20060101ALI20130510BHEP

Ipc: B61L 25/08 20060101ALI20130510BHEP

17Q First examination report despatched

Effective date: 20170714

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20180515

RIN1 Information on inventor provided before grant (corrected)

Inventor name: YAGYU, DAISUKE

Inventor name: TOMITA, KOJI

Inventor name: OSUMI, HIDEKI

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN

18W Application withdrawn

Effective date: 20180920