CN1691464A - 功率控制装置、发电系统以及电力网系统 - Google Patents
功率控制装置、发电系统以及电力网系统 Download PDFInfo
- Publication number
- CN1691464A CN1691464A CNA2005100652862A CN200510065286A CN1691464A CN 1691464 A CN1691464 A CN 1691464A CN A2005100652862 A CNA2005100652862 A CN A2005100652862A CN 200510065286 A CN200510065286 A CN 200510065286A CN 1691464 A CN1691464 A CN 1691464A
- Authority
- CN
- China
- Prior art keywords
- output
- mentioned
- power
- control device
- scheduled period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
Abstract
本发明提供一种功率控制装置、发电系统以及电力网系统。在包括把来自发电装置的输出进行功率转换的功率转换装置、把来自发电装置的输出或者功率转换装置的输出进行蓄存的同时根据需要来释放所蓄存的电力的蓄电装置,并把该功率转换装置的输出输出给电力系统的功率控制装置中,检测发电装置在预定时间内所发电的电能,根据各期间的电能,决定功率控制装置在下一个预定期间的输出图形,并根据输出图形来控制功率控制装置的输出,由此,即使在来自发电装置的输出变动的情况下,也能够预先确定输出给电力系统的电能,通过向蓄电装置充电或者从蓄电装置放电来吸收相当于与该电能的差异的功率。
Description
技术领域
本发明涉及功率控制装置、发电系统以及电力网系统,更详细地讲,涉及包括功率转换装置和蓄电装置、并把来自发电装置的输出进行功率转换后输出到电力系统的功率控制装置的控制。
背景技术
近年来,例如由于伴随传统燃料的使用释放二氧化碳而使地球变暖、因原子能设备的意外事故以及核废弃物引起的放射性污染等环境问题非常严重,并且关注的焦点集中在陆地环境和能量方面。在这种情况下,在全世界已经实际使用了太阳能电池等利用太阳光这种无穷无尽而且清洁能源的装置等。
太阳能电池根据入射到感光面的太阳光的强度,输出功率产生很大变动。当把这种输出变动剧烈的发电单元连接到电力系统(以下,也简单地称为「系统」)时,为了稳定系统的频率或者电压,需要使用蓄电池等蓄电装置以使输出稳定。
通过这种输出稳定化,改善由以下两个原因引起的系统频率或者电压的品质恶化。原因之一是发电一侧剧烈的输出变动,另一个原因是连接在系统上的负荷的变动。
提出了很多用于这种输出稳定化的控制方法或者系统。例如,在特公平2-61227号公报中,记载了在把太阳能电池连接到系统上时,为了使太阳能电池的急剧输出变动在系统中不产生影响,把太阳能电池的输出暂时在蓄电池等中蓄存,检测太阳能电池的输出或者日照,控制电力网连接变换器的输出使其成为平滑的值。
另外,在特开昭63-186538号公报中,记载了如下方法:在电力系统中设置由蓄电池和双向变压器构成的系统稳定化装置,在产生负荷变动时,调整来自系统稳定化装置的输出。
即,在连接太阳能发电系统时发生的系统输出变动在负荷中产生影响的情况下,在电力不足时从系统稳定化装置进行供给,而在电力富裕时在系统稳定化装置中进行所蓄存的负荷调整。
另一方面,在电力系统一侧,通常连接多台发电机(以下,把它们称为系统发电单元),这些发电机根据预先确定的供需计划,决定发电机的运转(起动以及停止)。通过考虑到过去的负荷变动而制定这些供需计划,根据该计划来控制起动或者停止。
如上所述,在根据单纯基于过去的负荷时间情况的供需计划来控制系统的发电单元的系统中,在连接太阳能电池等不稳定的发电单元后进行系统连接时,由于不能够过于指望由太阳能电池等不稳定的发电单元产生的电力,因此与通常动作时相比较,需要相当低地估计其电力。从而,在连接了太阳能电池等输出不稳定的发电单元时,在发电机的运用上,浪费非常多。
为了消除浪费,考虑使用上述专利文献2记述的蓄电装置使太阳能电池等输出不稳定的发电单元的输出稳定化。
然而,记载在特开昭63-186538号公报中的方法基本上以设置在系统中的发电机根据恒定的供需计划发电为前提。因此,例如,如果考虑在台风或者局部天气急剧变化的大规模范围内对太阳能电池等的输出产生很大影响的情况,则为了安全需要充分加大蓄电装置的容量,其结果,具备太阳能电池等不稳定的发电单元的发电系统成为很高的成本。
发明内容
本发明的目的在于减少功率控制装置的蓄电装置的容量,所述功率控制装置包括功率转换装置和蓄电装置,把来自发电装置的输出进行功率转换后输出到电力系统中。
实现上述目的的本发明的一种方式的功率控制装置是把来自发电装置的输出进行功率转换后输出到电力系统的功率控制装置,具备:
功率转换装置,把上述发电装置的输出进行功率转换;
蓄电装置,在把来自上述发电装置的输出或者来自上述功率转换装置的输出进行蓄存的同时,根据需要释放所蓄存的电力;
检测单元,检测由上述发电装置在预定期间内发电的电能;以及
控制单元,根据各预定期间的上述电能,决定上述功率控制装置在下一个预定期间的输出图形(pattern),并根据该输出图形来控制上述功率控制装置的输出。
即,在本发明中,在包括把来自发电装置的输出进行功率转换的功率转换装置、把来自发电装置的输出或者来自功率转换装置的输出进行蓄存的同时根据需要把所蓄存的电力进行释放的放电装置,并把该功率转换装置的输出向电力系统输出的功率控制装置中,检测由发电装置在预定期间内发电的电能,根据各预定期间的电能,决定下一个预定期间中的功率控制装置的输出图形,根据输出图形,控制功率控制装置的输出。
如果这样做,则由于根据在各预定期间内的发电电能,来控制功率控制装置下一个预定期间的输出,因此例如即使在来自发电装置的输出发生变动的情况下,也能够预先决定向电力系统输出的电能,通过向蓄电装置充电或者从蓄电装置放电来吸收与其电能差异相当的电力。
从而,能够减少功率控制装置内的蓄电装置的容量的同时,在电力系统一侧能够具有余量建立供需计划。
另外,最好是控制单元决定输出图形使得在下一个预定期间内从功率控制装置输出的电能与在预定期间内从功率控制装置输出的电能实际上相等。
在这种情况下,作为输出图形,可以把在下一个预定期间内从功率控制装置输出的功率取为恒定,也可以具有使在下一个预定期间的一部分从功率控制装置输出的功率值变化的移动部。在具有移动部的情况下,最好把功率控制装置在移动部中的输出的变化速度限制为小于或等于预定值。
也可以将蓄电装置的输入输出连接到功率转换装置的输入一侧,使得控制单元可以控制来自功率转换装置的输出功率。
也可以还具备检测蓄电装置的蓄电状态的蓄电状态检测单元,使得控制单元依据检测出的蓄电状态而修正输出图形。
另外,上述目的还通过使用了依据本发明的功率控制装置的发电系统或者电力网系统而实现。
本发明的其它特征和优点将从以下结合附图进行的描述中明了,其中,相同的参考符号在所有的附图中表示相同或者相似的部分。
附图说明
被引入说明书的附图构成说明书的一部分,本发明中举例说明的具体实施例与说明书一起用于解释本发明的原理。
图1是表示依据本发明的发电系统的基本结构例的方框图。
图2是表示图1的发电系统的功率控制装置的基本结构例的方框图。
图3是表示图1的发电系统的功率控制装置的基本结构例的方框图。
图4是表示本发明的发电系统的第1实施方式的结构的方框图,
图5A到5C用于说明第1实施方式的预定输出图形,
图6A到6C用于说明第2实施方式的预定输出图形,
图7是表示本发明的发电系统的第3实施方式的结构的方框图,
图8是表示本发明的发电系统的第4实施方式的结构的方框图,
图9是表示依据本发明的电力系统的基本结构例的方框图,
图10是表示第1实施方式中的控制单元所进行的处理的流程图。
具体实施方式
下面将参照附图详细地描述本发明的最佳实施方式。应注意以下实施方式的每一个元件都不是想要限定本发明的范围,而仅是作为一个例子来描述。
基本的结构
图1是表示本发明的发电系统的基本结构例的框图。
发电系统1具备发电装置2和以从发电装置2输出的电力为输入向电力系统4进行输出的功率控制装置3。功率控制装置3具有功率转换装置5、蓄电装置6、控制单元7以及检测单元8,来自控制单元7的输出被输出给通知单元9,通知单元9的输出向电力系统4输入。
进而,图9是表示本发明的电力网系统100的基本结构例的框图,更详细地示出图1的电力系统4的结构。电力系统4具备包括104a、104b、104c3个发电机的发电机104、接收来自发电系统1中的通知单元9的信号的接收单元101、根据来自接收单元101的信号决定发电机104的供需计划的供需计划决定单元102、根据供需计划起动以及停止发电机的发电机起动停止单元103,其中来自发电系统1以及发电机104的输出被供给到负荷110。
功率控制装置3具有把发电装置2所产生的电力进行变换后输出的功率转换装置5、蓄存来自发电装置2的输出或者来自功率转换装置5的输出,并且根据需要放电的蓄电装置6、检测发电装置2的发电量的检测单元8、输入由检测单元8检测出的发电量,预先确定在下一个预定期间从功率控制装置3输出的输出图形,发出指令以根据输出图形从功率控制装置3进行输出的控制单元7。另外,具有根据输出图形把发电预定信息通知给电力系统4(供需计划决定单元)的通知单元9。
作为发电装置2,只要是输出有变动的装置就可以。例如,能够使用太阳能电视、风力发电机、热电发电机等或者它们的组合。在使用输出不稳定而且输出变动难以预测的、利用自然能量的太阳能电池或者风力发电机等的情况下,可以得到特别显著的效果,非常适宜。另外,还可以构成为由变压器把来自太阳能电池等的发电输出进行功率转换后输出。
图2是表示功率控制装置3的更具体的结构例的框图,在图示的结构中,蓄电装置6的输入输出单元连接在检测单元8与功率转换装置5之间,向功率转换装置5中输入来自发电装置2和/或蓄电装置6的输出。来自控制单元7的指令被输入到功率转换装置5,功率转换装置5能够得到基于指令的输出,在进行功率转换后向电力系统4输出。
图3是表示功率控制装置的其它具体结构例的框图,在图示的结构中,蓄电装置6的输入输出单元连接在功率转换装置5的输出一侧,向功率转换装置5中输入来自发电装置2的输出。来自控制单元7的指令被输入到功率转换装置5,功率转换装置5能够得到基于指令的输出,在把经功率转换后的输出通过蓄电装置6的充放电进行调整后向电力系统4输出。
作为电力系统4,能够适用三相3线制、单相2线制或单相3线制等交流系统或者直流系统等各种系统。特别是,系统内的发电机104在比较小的容量(小于或等于数十MW)或者发电系统1中的发电装置2的电能相对于系统发电机的总发电量占有大于或等于5%的情况下,由于易于受到发电系统1的输出变动的影响,因此适用本发明这样的确定输出图形以谋求系统稳定的方法。
特别是,作为发电机104,以柴油发电机为主体运用的独立电力系统由于发电容量是比较小的规模,因此柴油发电机的运转(起动和停止)易于受到发电系统1的输出变动的影响,因此确定输出图形以谋求输出稳定的本发明是适宜的。
功率转换装置5只要是能够按照与电力系统4相对应的电方式进行输出的电路结构,在方式或者结构方面就没有特别限定。例如,在电力系统4是三相3线制的情况下,作为三相输出逆变器,能够使用三相桥接电路及其变形电路。另外,还能够构成为在三相输出逆变器的前级设置DC/DC变压器,把来自发电装置2的电压升降压到所希望的电压,并供给到三相输出逆变器。
蓄电装置6只要是能够响应发电装置2的输出变动的装置即可。例如,能够使用铅蓄电池、锂离子蓄电池、镍氢电池、NAS电池等蓄电池、电双层电容器等电容器、续流(フライホイ一ル)蓄电装置等能量可充放电的蓄电器件。另外,还可以具备充电用以及/或者放电用的功率转换电路。
在把这样的功率转换电路设置在蓄电装置6中的情况下,如图3所示,能够在发电系统1的功率转换装置5与电力系统4的中间设置蓄电装置6。还可以构成为兼用作充电用功率转换电路和放电用功率转换电路,这种情况下,能够达到小型、重量轻和低成本。另外,还可以采用具备多个蓄电装置6的结构,这种情况下,作为各蓄电装置能够使用相同种类或者不同种类的蓄电器件。例如,如果把包括小型和大容量的铅蓄电池或者锂离子电池等在内的蓄电装置与包括长寿命和可高速充放电的电双层电容器或者续流蓄电装置在内的蓄电装置组合起来使用,则由于能够相互补偿缺点而十分理想。
控制单元7可通过包括RAM、ROM、I/O等的CPU或者DSP、模拟处理电路、数字处理电路而适当构成。输出图形如果设定成在下一个预定期间输出用预定期间平均化由检测单元8计算出的积分发电量的预定输出值,则在下一个预定期间内,从发电系统向电力系统4输出恒定值。发电系统4一侧的发电机能够在预定期间结束时或者其结束稍前,得知在下一个预定期间向电力系统4输出上述恒定电能。
因此,通过在制定供需计划和按照该供需计划来控制电力系统4一侧的发电机104的运转(起动和停止)的过程中考虑到该恒定电能,就不需要因考虑到来自发电系统1的功率变动而具有较大裕度的蓄电装置(从而,不会浪费相当大的功率),能够大幅度减少发电机104的运用成本。另外,输出图形在从预定期间的输出值向下一个预定期间的输出值移动时,还可以设定成来自功率转换装置5的输出的变动速度(变动程度、斜率)小于或等于预定值,在这种情况下,能够减少在移动到下一个预定期间时发生的、发电单元的输出变动对电力系统4产生的影响,因而十分理想。
另外,也可以考虑功率转换装置5的变换效率(变换损失)设定输出图形,这种情况下,由于能够更正确地控制向蓄电装置6蓄存的电力,因此能够使蓄电装置6小容量、小型和低成本的同时,由于容易进行蓄电电平的管理和控制,因此十分理想。
在预定期间的长度方面没有特别限定,而由于如果缩短预定期间,则能够减小蓄电装置6的容量,因此最好在电力系统4中的发电机104的运转(起动/停止)能够跟踪的范围内缩短预定期间,例如,在发电机104是柴油发电机等内燃发电装置的情况下,起动时间为从数十秒到5分钟左右,需要使预定时间比该起动时间长。但是,如果电力系统4的发动机起动/停止的频度(次数)比较多,则由于发电机的寿命降低,考虑到这些问题,可以将预定期间设定在10分钟到2小时左右的范围内。
检测单元8只要能够检测出发电装置2在预定期间内的发电量的电路即可。例如,检测发电装置2的输出电流和输出电压,把检测电流与检测电压相乘后求出输出装置2的输出功率,通过把该检测功率在预定期间内积分(累积),能够检测出发电量。另外,在发电装置2的输出电压大致恒定的情况下,仅检测发电装置2的输出电流,通过在预定期间内把输出电流进行积分,得到与发电量相当的值,可以把其作为检测发电量。另外,还能够构成为使得把检测电流与检测电压相乘的结构或者在预定期间内把检测功率积分的结构等兼作为上述控制单元7的一部分,在这种情况下,具有能够实现小型和低成本的优点。
通知单元9至少在预定期间结束时或者在预定期间结束稍前(通信时间+电力系统的发电单元的起动时间所需要的时间之前),根据输出图形把发电系统的预定输出的信息(在下一个预定期间从发电系统向电力系统输出的输出功率的时序图形)通知给决定电力系统的发电机的供需计划的供需计划决定单元102。作为在该通知中使用的通信单元,能够适宜地使用有线通信或者无线通信,例如,电话线路通信、基于互联网/以太网的通信、专用线通信、卫星线路通信或者它们的组合。通知单元9如果具有相同种类或者不同种类的多个通信单元,则由于能够提高发电系统以及电力系统的可靠性,因此十分理想。
另外,在图2所示的结构的情况下,从控制单元7对功率转换装置5的指令值不必是功率转换装置5的输出功率的指示值。也可以是考虑了功率转换装置5的变换效率的损失量而计算出的对功率转换装置5的输入功率的指示值,这种情况下,功率转换装置5由输入功率值控制,因此在功率转换装置5中设置检测输入功率的单元。由此,具有能够容易地管理蓄电装置6的蓄电状态的效果。
在具备多个连接到电力系统4上的发电系统1的系统中,如果构成为进行设定和控制以使各发电系统中划分预定期间的定时不同,则由于各发电系统按照不同的定时进行输出调整,因此进一步减小各发电系统的输出变动对于电力系统产生的影响,从而十分理想。另外,这种情况下,从电力系统的发电机的观点出发,具有与缩短预定期间相同的效果,在以较短的时间间隔更新输出预定信息的基础上,由于多个发电系统中,从下一更新输出预定信息的发电系统以外的其它发电系统输出的功率不发生变化,能够更详细地建立电力系统的发电机的运转计划,从而十分理想。
还能够构成为在蓄电装置6中设置检测蓄电状态的蓄电状态检测单元,以根据检测出的蓄电状态来修正输出图形。这种情况下,由于能够进行对蓄电装置的增加量的控制·抑制或者对蓄电状态的下限值的控制,因此能够提高蓄电装置6的可靠性。另外,由于能够抑制蓄电装置6的容量,因此能够使蓄电装置6小型化和低成本。作为这种蓄电状态检测单元,例如,包括检测蓄电装置6的充放电电流,对该值积分以检测充放电电流量的装置。另外,在蓄电装置6中使用电双层电容器的情况下,还能够利用电双层电容器的电压。
另外,也可以考虑在蓄电装置6中所使用的蓄电器件的充放电效率,或者在蓄电装置6中为输入输出部而具备功率转换电路的功率转换电路的变换效率,来修正输出图形。另外,也可以检测发电装置2的输出电流量和功率转换装置5的输入电流量,根据这些电流量来修正输出图形,例如,可以计算预定期间的发电装置2的输出电流量与下一个预定期间的功率转换装置5的输入电流量的差,根据上述电流量差来修正下一个预定期间的输出图形。作为修正预定输出图形的方法,例如,可以通过计算希望在下一个预定期间修正的电流量,与蓄电装置6的输出电压(=发电装置2的输出电压=功率转换装置5的输入电压)相乘而计算出电能,把该电能加入到预定期间的检测发电量中,并把该值作为下一个预定期间的发电量来进行修正。通过根据所修正的下一个预定期间的发电量设定输出图形,能够修正输出图形。
以下,说明基于以上说明的本发明的发电系统的基本结构的具体
实施方式。
第1实施方式
图4是表示依据本发明的发电系统的第1实施方式的框图。本实施方式的发电系统10由功率控制装置30调整来自太阳能电池20的输出,同时功率转换为三相交流后输出到三相交流系统40。
本实施方式的发电系统10的结构基于图1以及图2所示的基本结构,太阳能电池20与发电装置2、功率控制装置30与功率控制装置3、电力网连接变换器50与功率转换装置5、铅蓄电池60与蓄电装置6、控制单元70与控制单元7、电流检测单元80以及电压检测单元81与检测单元8、通信装置90与通信单元9分别对应。
太阳能电池20的输出连接到电力网连接变换器50的输入单元以及铅蓄电池60的输入输出单元,根据太阳能电池20的发电状态以及电力网连接变换器50的输出状态,控制铅蓄电池60的充放电。即,如果提高电力网连接变换器的输入指示功率,则太阳能电池20的输出为铅蓄电池60充电,另一方面,如果降低电力网连接变换器的输入指示功率,则太阳能电池20的输出为铅蓄电池60放电。
电力网连接变换器50根据后述的来自控制单元70的指令,把太阳能电池20的输出以及来自铅蓄电池60的输出功率转换为所希望大小的三相交流。电流检测单元80以及电压检测单元81分别检测太阳能电池20的输出电流以及输出电压,把检测电流值以及检测电压值输出到控制单元70。在控制单元70中,通过将检测电流值与检测电压值相乘,计算太阳能电池20的输出功率。然后,控制单元70通过在大约20分钟(=预定期间)之间对计算出的功率值积分,计算出太阳能电池20的发电量。根据该计算出的发电量,如以下那样决定用于控制电力网连接变换器50的输出的输出图形。
图5A到5C是用于说明本实施方式的输出图形的模式图。图中,横轴表示时间,纵轴在图5A中表示太阳能电池20的输出功率,在图5B中表示电力网连接变换器50的输入目标值,在图5C中表示输出图形。另外,纵向虚线表示各预定期间的划分位置(时刻)。
太阳能电池20的预定期间内的发电量如图5A所示,与把在各预定期间中的输出功率积分得到的面积等价,而如上所述,由控制单元70计算。接着,从计算出的预定期间的发电量计算出预定期间的输出功率的平均值,把该值作为下一个预定期间的电力网连接变换器50的输入功率目标值。图5B示出这样求出的输入目标值。这里,图5A的表示太阳能电池20的预定期间的发电量的各面积实际上与图5B的表示电力网连接变换器50的输入目标值在下一个预定期间的积分值的各面积相等,只是错开一个预定期间。
接着,控制单元70使用作为数据预先存储的电力网连接变换器50的功率转换效率,计算与电力网连接变换器50的输入目标值相对应的电力网连接变换器50的输出,把该值作为在下一个预定期间从电力网连接变换器50输出的功率的输出图形。图5C中各期间的输出图形与图5B的电力网连接变换器50的输入目标值几乎是相似形状,只是减小了由于电力网连接变换器50的功率转换而产生的损失量。电力网连接变换器50根据这样由控制单元70决定的输出图形,把太阳能电池20的输出以及/或者铅蓄电池60的输出作为输入,功率转换后输出到三相交流系统40。
通信装置90由控制单元70把基于在各预定期间的划分定时决定的输出图形的、发电系统10的预定输出功率信息向三相交流系统40发送。
另外,在图5A到5C中表示在图5A的预定期间结束的定时决定了5B的输入目标值以及5C的输出图形,而实际上,如上所述,由于需要比预定期间结束提前通信时间+电力系统的发电单元的起动时间,通过通信装置90把下一个预定期间的输出图形通知给三相交流系统40,因此5A的划分位置(时刻)比5B以及5C的划分位置提前一些。
这里,参照图10的流程图再次说明本实施方式中的控制单元70进行的处理。
首先,如果开始动作,则检查最初的预定期间是否结束(步骤S101)。如果预定期间没有结束则待机到结束,如果预定期间结束,则计算预定期间内太阳能电池的发电量(图5A的各期间的面积)(步骤S102)。
接着,根据计算出的预定期间的发电量计算预定期间的输出功率的平均值,把该值作为下一个预定期间的电力网连接变换器50的输入功率目标值(图5B)(步骤S103)。
然后,使用预先存储的电力网连接变换器50的功率转换效率,计算与输入目标值相对应的电力网连接变换器50的输出,把该值作为在下一个预定期间从电力网连接变换器50输出的功率的输出图形(图5C)(步骤S104)。
判定动作是否结束(步骤S105),在动作结束之前反复进行步骤S101以后的处理。
如上所述,通过构成为根据各期间内的太阳能电池的输出功率,决定下一个期间的电力网连接变换器50的输出图形,能够事前建立系统一侧的发电机在各期间的供需计划,因此能够减小铅蓄电池的容量。进而,由于能够使三相交流系统40的发电机的运转状态稳定,因此抑制了对系统电压或者系统频率的影响,稳定了三相交流系统40。
另外,也可以构成为在预定期间中途(例如中间),计算该时刻之前的发电量的平均值,把该平均值作为该时刻的下一个预定期间中的最小保证输出值,从通信装置90通知给三相交流系统40。另外,也可以发送其后在预定期间结束的时刻确定的输出图形。这种情况下,能够以更多的时间余量建立系统一侧发电机的供需计划。因此,具有稳定电力系统以及进一步减小铅蓄电池的容量的效果。进而,进一步抑制对于系统电压或者系统频率的影响,进一步稳定三相交流系统40。
同样,也可以构成为在预定期间中(例如中间),计算至该时刻的发电量的平均值,把该平均值作为该时刻的下一个预定期间中的期望输出值,从通信装置90通知给三相交流系统40。另外,也可以发送其后在预定期间结束的时刻确定的输出图形。这种情况下,能够具有更多的时间余量建立系统一侧的发电机的供需计划。因此,具有进一步稳定电力系统以及进一步减小铅蓄电池的容量的效果。进而,进一步抑制对于系统电压或者系统频率的影响,进一步稳定三相交流系统40。
第2实施方式
其次,说明本发明的发电系统的第2实施方式。以下,对于与上述第1实施方式相同的部分省略说明,而只说明本实施方式的特征部分。
第2实施方式也与第1实施方式相同,由功率控制装置30调整来自太阳能电池20的输出,同时将其功率转换为三相交流后输出到三相交流系统40。第2实施方式与第1实施方式的不同点是输出图形的决定方法,使用图6说明这一点。
图6A到6C是用于说明本实施方式的预定输出图形的模式图,与图5A到5C相同,横轴表示时间,纵轴在6A中表示太阳能电池20的输出功率,在6B中表示电力网连接变换器50的输入目标值,在6C中表示输出图形。另外,纵向虚线表示各预定期间的划分位置(时刻)。另外,图6A的输出功率与图5A所示的相同,图6B以及图6C与图5B以及图5C分别不同。即,在本实施方式中,控制单元70如以下那样设定电力网连接变换器50的输入目标值以及输出图形。
在第2实施方式中,也根据预定时间内太阳能电池20的发电量来决定下一个预定期间的电力网连接变换器50的输入目标值,但输入目标值在自成为下一个预定期间起的一定变动期间(例如,小于或等于预定期间的1/6)中,如图6B图示的那样,设定成从预定期间的输入目标值的最终值起线性变化,在经过了变动期间以后成为输入目标值。另外,在本实施方式中,也象使以图6B中的预定期间内的输入目标值划定的面积与6A的前一个预定期间内的输出功率的发电量(面积)相等那样,设定输入目标值的最终值。这是因为知道变动时间长度、预定期间的长度、预定期间的输入目标值的最终值以及预定期间的太阳能电池20的发电量,因此能够容易地计算。
根据这样得到的输入目标值和电力网连接变换器50的功率转换效率,计算应该从电力网连接变换器50输出的值,决定6C的输出图形。然后,电力网连接变换器50根据6C的输出图形,把电力输出到三相交流系统40。
通信装置90根据由控制单元70在各预定期间的划分定时决定的输出图形,把发电系统10的预定输出功率信息向三相交流系统40发送。
在本实施方式的发电系统中,通过根据上述输出图形来控制输出功率,能够大幅度地抑制在预定期间移动之后电力网连接变换器50的急剧输出变动。因此,抑制了三相交流系统的发电机的运动状态剧烈地变化,抑制对于系统电压或者系统频率的影响,稳定了三相交流系统40。进而,还能够在系统一侧的供需计划方面具有时间余量。
另外,如果把上述变动期间设定为较长,则从电力网连接变换器50(功率转换装置)输出恒定功率的期间缩短。这里,如果设在预定期间内输出的电能与变动期间短的情况相同,则预定期间内的最终输出值与下一个预定期间内的最终输出值的差增大。即,图6B以及6C各期间中的恒定值增大。因此,如果加长变动期间,则有必要增加电力网连接变换器50(功率转换装置)的输出容量以及铅蓄电池60(蓄电装置)的容量,同时,增加铅蓄电池的充放电,从而增加了功率损失。因此,变动期间的长度最好在可以抑制对系统的影响的范围内缩短。作为具体的例子,最好设定为小于或等于预定期间的1/4。
另外,在上述变动期间中的电力网连接变换器50的输出变动的速度(变动期间的斜率)大于预定值的情况下,也可以调整输出图形,使得暂时加长变动期间的长度,把输出变动的速度限定到一定值。如果这样做,则能够在时间上具有余量建立供需计划,具有稳定电力系统和减少铅蓄电池的容量的效果。进而,抑制对于系统电压或者系统频率的影响,稳定三相交流系统40。
另外,在本实施方式中,也能够构成为在预定期间中途(例如中间)计算该时刻之前的发电量的平均值,把该平均值作为该时刻的下一个预定期间中的最小保证输出值,从通信装置90向三相交流系统40发送。另外,也可以随后发送在预定期间结束的时刻确定的输出图形。这种情况下,能够以更多的时间余量建立系统一侧发电机的供需计划。因此,在稳定电力系统以及减少铅蓄电池容量方面具有进一步的效果。进而,进一步抑制对于系统电压或者系统频的影响,进一步稳定三相交流系统40。
第3实施方式
下面,说明本发明的发电系统的第3实施方式。以下,对于与上述第1以及第2实施方式相同的部分省略说明,而只说明本实施方式的特征部分。
图7是表示依据本发明的发电系统的第3实施方式的结构的框图。第1以及第2实施方式作为发电装置仅使用太阳能电池20,而在第3实施方式中,如图示那样,由太阳能电池20和把太阳能电池20的输出电压进行变换(升压)的DC/DC变压器21构成。
在本实施方式的结构的情况下,能够与电力网连接变换器50的可操作的输入电压或者铅蓄电池60的电压无关地选定所使用的太阳能电池20的输出电压,提高系统设计的自由度。另外,由于能够用DC/DC变压器21任意地控制太阳能电池20的动作点,因此能够进行从太阳能电池20取出最大输出、即所谓的最大输出跟踪控制(MPPT控制),从而作为发电系统的效率提高,十分理想。
另外,如果构成为在铅蓄电池60过充电或者充电电流过大时调整DC/DC变压器21的输出电压,则还能够得到可以保护铅蓄电池防止过充电或者过大充电电流。
第4实施方式
下面,说明本发明的发电系统的第4实施方式。以下,对于与上述第1到第3实施方式相同的部分省略说明,说明本实施方式的特征部分。
图8是表示本发明的发电系统的第4实施方式的结构的框图。在第1到第3实施方式中,仅用铅蓄电池60构成功率控制装置30的蓄电装置,而在第4实施方式中,通过由铅蓄电池60和用于对铅蓄电池60的充电电压以及放电电压双方进行变换(升压/降压)的DC/DC变压器61来构成功率控制装置32的蓄电装置62。
在上述结构的情况下,能够与电力网连接变换器50的可动作的输入电压或者太阳能电池20的电压无关地选定铅蓄电池60的电压,提高了系统设计的自由度。另外,由于能够通过经由DC/DC变压器61连接铅蓄电池60来任意地控制太阳能电池20的动作点,因此通过控制DC/DC变压器61以及/或者电力网连接变换器50,能够进行从太阳能电池20取出最大输出的、所谓最大输出跟踪控制(MPPT控制),作为发电系统的效率提高,十分理想。
另外,通过构成为在铅蓄电池60过充电或者充电电流过大时调整DC/DC变压器61的输入,可以得到保护铅蓄电池防止过充电或者过大充电电流的效果。
其它的实施方式
本发明并不限于上述的实施方式,根据本发明的宗旨能够进行各种变形。
在上述的实施方式中,如果严密地讲,太阳能电池的输出功率当然不能够直接从蓄电装置(铅蓄电池)利用。因此,可以设置检测蓄电装置的充放电电流、功率转换装置(电力网连接变换器)的输入电流等的电流检测单元,根据蓄电装置在预定期间的电流量、蓄电装置通常的电流量、来自发电装置的输入电流在预定期间的电流量以及功率转换装置的输入电流在下一个预定期间的电流量偏差,调整上述预定输出图形。
如果这样做,则可以得到控制蓄电装置的最大充电能,另外,能够控制为使从一天的开始到结束时的充电电平差异相同这样的效果。
另外,作为电力系统,以包括发电机的系统为例进行说明,而本发明也能够适用在不包括发电机的电力系统中,这种情况下,也可以得到能够稳定功率控制装置的输出,同时减小蓄电装置的容量这样的效果。
本发明既可以适用于由多台设备构成的发电系统,也可以适用于由一台设备构成的发电系统的功率控制装置。
另外,在上述的实施方式中,说明了预定时间是恒定值的情况,但并不限于这种情况,只要是在系统一侧发电机的供需计划方面具有时间余量,能够稳定电力系统以及减少铅蓄电池的容量,抑制对系统电压或者系统频率的影响,则预定时间就能够适当变更。也可以周期性或者不定期地变更预定时间。
进而,本发明能够通过直接或间接地向系统或设备提供软件程序,该软件程序实现上述实施方式的功能(符合上面提及的图10的流程的程序代码)、用系统或设备的计算机读取所提供的程序代码、并且执行该程序代码来实现。在这种情况下,只要系统或设备具有程序的功能,则执行的方式并不需要依赖于程序。
从而,由于本发明的功能由计算机实现,因此安装在计算机中的程序代码也实现本发明。换句话讲,本发明的权利要求还包括意图实现本发明的功能的计算机程序。
这种情况下,只要系统或者设备具有程序的功能,则就能够以任意的形态例如目标代码执行程序,能够用解释程序或者提供给操作系统的脚本数据执行程序。
在不脱离本发明的精神和范围的情况下,能够明显而且广泛地产生本发明的大量的不同实施方式,本发明除去在权利要求中定义以外,不受这些特殊实施方式的限定,这一点是非常明确的。
Claims (12)
1.一种功率控制装置,将来自发电装置的输出进行功率转换后输出到电力系统,包括:
功率转换装置,对上述发电装置的输出进行功率转换;
蓄电装置,在把来自上述发电装置的输出或者来自上述功率转换装置的输出进行蓄存的同时,根据需要释放所蓄存的电力;
检测单元,检测由上述发电装置在预定期间内产生的电能;以及
控制单元,根据各预定期间的上述电能,决定上述功率控制装置在下一个预定期间的输出图形,并根据该输出图形来控制上述功率控制装置的输出。
2.根据权利要求1所述的功率控制装置,其中:
上述控制单元决定上述输出图形,以使在下一个预定期间从上述功率控制装置输出的电能与在上述预定期间从上述功率控制装置输出的电能基本相等。
3.根据权利要求2所述的功率控制装置,其中:
上述输出图形中,在下一个预定期间从上述功率控制装置输出的功率大致相同。
4.根据权利要求2所述的功率控制装置,其中:
上述输出图形具有使上述功率控制装置输出的功率值在下一个预定期间的一部分期间发生变化的移动部。
5.根据权利要求4所述的功率控制装置,其中:
来自上述功率控制装置的输出在上述移动部中的变化速度被限制为小于或等于预定值。
6.根据权利要求1所述的功率控制装置,其中:
上述蓄电装置的输入输出连接在上述功率转换装置的输入一侧,上述控制单元控制来自上述功率转换装置的输出功率。
7.根据权利要求1所述的功率控制装置,其中:
还具备检测上述蓄电装置的蓄电状态的蓄电状态检测单元,
上述控制单元根据检测出的蓄电状态来修正上述输出图形。
8.一种发电系统,包括:
功率控制装置,将来自发电装置的输出进行功率转换后输出到电力系统,包括:功率转换装置,对上述发电装置的输出进行功率转换;蓄电装置,在把来自上述发电装置的输出或者来自上述功率转换装置的输出进行蓄存的同时,根据需要释放所蓄存的电力;检测单元,检测由上述发电装置在预定期间内产生的电能;以及控制单元,根据各预定期间的上述电能,决定上述功率控制装置在下一个预定期间的输出图形,并根据该输出图形来控制上述功率控制装置的输出;
上述发电装置;以及
通知单元,根据上述输出图形,把与预计在上述下一个预定期间从上述功率控制装置输出的电能有关的信息通知给上述电力系统。
9.根据权利要求8所述的发电系统,其中:
上述电力系统包括发电机。
10.根据权利要求8所述的发电系统,其中:
上述发电装置是利用了自然能量的装置。
11.一种电力网系统,包括:
发电系统,包括:
功率控制装置,将来自发电装置的输出进行功率转换后输出到电力系统,包括:功率转换装置,对上述发电装置的输出进行功率转换;蓄电装置,在把来自上述发电装置的输出或者来自上述功率转换装置的输出进行蓄存的同时,根据需要释放所蓄存的电力;检测单元,检测由上述发电装置在预定期间内产生的电能;以及控制单元,根据各预定期间的上述电能,决定上述功率控制装置在下一个预定期间的输出图形,并根据该输出图形来控制上述功率控制装置的输出;
上述发电装置;以及
通知单元,根据上述输出图形,把与预计在上述下一个预定期间从上述功率控制装置输出的电能有关的信息通知给上述电力系统,
接收单元,从上述通知单元接收上述信息,
供需计划决定单元,根据上述接收单元接收的上述信息,决定上述发电机的供需计划,以及
运转控制单元,根据上述供需计划来控制上述发电机的运转。
12.一种功率控制装置的控制方法,其中所述功率控制装置包括将来自发电装置的输出进行功率转换的功率转换装置和在把来自上述发电装置的输出或者来自上述功率转换装置的输出进行蓄存的同时、根据需要来释放所蓄存的电力的蓄电装置,并把该功率转换装置的输出输出给电力系统,所述控制方法包括:
检测步骤,检测上述发电装置在预定期间内所产生的电能;
决定步骤,根据各预定期间的上述电能,决定上述功率控制装置在下一个预定期间的输出图形;以及
输出控制步骤,根据上述输出图形来控制上述功率控制装置的输出。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004123442A JP2005312138A (ja) | 2004-04-19 | 2004-04-19 | 電力制御装置、発電システム及び電力系統システム |
JP2004123442 | 2004-04-19 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1691464A true CN1691464A (zh) | 2005-11-02 |
CN100380774C CN100380774C (zh) | 2008-04-09 |
Family
ID=35097334
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2005100652862A Expired - Fee Related CN100380774C (zh) | 2004-04-19 | 2005-04-19 | 功率控制装置、发电系统以及电力网系统 |
Country Status (3)
Country | Link |
---|---|
US (2) | US7456604B2 (zh) |
JP (1) | JP2005312138A (zh) |
CN (1) | CN100380774C (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101837743A (zh) * | 2009-03-16 | 2010-09-22 | 福特全球技术公司 | 机动车辆 |
CN102109210A (zh) * | 2009-12-28 | 2011-06-29 | 三洋电机株式会社 | 空调系统 |
CN102511117A (zh) * | 2009-09-30 | 2012-06-20 | 三洋电机株式会社 | 充放电控制装置以及发电系统 |
CN102545365A (zh) * | 2011-12-30 | 2012-07-04 | 华为技术有限公司 | 一种发电机控制方法及装置、通信基站 |
CN102624018A (zh) * | 2012-03-31 | 2012-08-01 | 东北大学 | 分布式混合供电型智能电网系统及控制方法 |
CN102658780A (zh) * | 2010-11-30 | 2012-09-12 | 本田技研工业株式会社 | 电动车辆中的输出控制装置 |
CN102687363A (zh) * | 2009-12-22 | 2012-09-19 | 松下电器产业株式会社 | 电力供给系统 |
CN102684185A (zh) * | 2011-01-18 | 2012-09-19 | 西门子公司 | 对由风力发电场生成的电功率的分发的控制 |
CN103270665A (zh) * | 2010-12-24 | 2013-08-28 | 日本电气株式会社 | 电力控制系统及其电力控制方法以及电力网关装置及其电力控制方法 |
CN103683848A (zh) * | 2012-09-19 | 2014-03-26 | 株式会社东芝 | 电源系统和电源控制器 |
CN104170201A (zh) * | 2012-02-16 | 2014-11-26 | 株式会社日立制作所 | 电力系统的运用方法、运用装置以及蓄电池管理装置 |
CN104638650A (zh) * | 2015-01-14 | 2015-05-20 | 国家电网公司 | 一种利用原动机输出转矩控制发电机频率的方法 |
CN105471070A (zh) * | 2015-11-09 | 2016-04-06 | 李哲 | 分布式光伏发电电量分配系统和方法 |
CN107123995A (zh) * | 2016-02-25 | 2017-09-01 | 台达电子企业管理(上海)有限公司 | 电力系统及其控制方法 |
Families Citing this family (105)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005312138A (ja) * | 2004-04-19 | 2005-11-04 | Canon Inc | 電力制御装置、発電システム及び電力系統システム |
US20070005195A1 (en) * | 2005-01-10 | 2007-01-04 | Nicholas Pasquale | Distributed energy storage for reducing power demand |
US20070100506A1 (en) * | 2005-10-31 | 2007-05-03 | Ralph Teichmann | System and method for controlling power flow of electric power generation system |
US11881814B2 (en) | 2005-12-05 | 2024-01-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US10693415B2 (en) | 2007-12-05 | 2020-06-23 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
JP5094058B2 (ja) * | 2006-06-30 | 2012-12-12 | 三洋電機株式会社 | 電源システム |
US8751053B2 (en) * | 2006-10-19 | 2014-06-10 | Tigo Energy, Inc. | Method and system to provide a distributed local energy production system with high-voltage DC bus |
JP4942454B2 (ja) * | 2006-10-31 | 2012-05-30 | 三洋電機株式会社 | 系統連系装置及び系統連系システム |
US11888387B2 (en) | 2006-12-06 | 2024-01-30 | Solaredge Technologies Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US11309832B2 (en) | 2006-12-06 | 2022-04-19 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US11735910B2 (en) | 2006-12-06 | 2023-08-22 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US8947194B2 (en) | 2009-05-26 | 2015-02-03 | Solaredge Technologies Ltd. | Theft detection and prevention in a power generation system |
US8473250B2 (en) | 2006-12-06 | 2013-06-25 | Solaredge, Ltd. | Monitoring of distributed power harvesting systems using DC power sources |
US8618692B2 (en) | 2007-12-04 | 2013-12-31 | Solaredge Technologies Ltd. | Distributed power system using direct current power sources |
US11687112B2 (en) | 2006-12-06 | 2023-06-27 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US8531055B2 (en) | 2006-12-06 | 2013-09-10 | Solaredge Ltd. | Safety mechanisms, wake up and shutdown methods in distributed power installations |
US9130401B2 (en) | 2006-12-06 | 2015-09-08 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US8963369B2 (en) | 2007-12-04 | 2015-02-24 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US8319471B2 (en) | 2006-12-06 | 2012-11-27 | Solaredge, Ltd. | Battery power delivery module |
US11296650B2 (en) | 2006-12-06 | 2022-04-05 | Solaredge Technologies Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US8816535B2 (en) | 2007-10-10 | 2014-08-26 | Solaredge Technologies, Ltd. | System and method for protection during inverter shutdown in distributed power installations |
US11569659B2 (en) | 2006-12-06 | 2023-01-31 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US9088178B2 (en) | 2006-12-06 | 2015-07-21 | Solaredge Technologies Ltd | Distributed power harvesting systems using DC power sources |
US11855231B2 (en) | 2006-12-06 | 2023-12-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
US8319483B2 (en) | 2007-08-06 | 2012-11-27 | Solaredge Technologies Ltd. | Digital average input current control in power converter |
US11728768B2 (en) | 2006-12-06 | 2023-08-15 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US8013472B2 (en) | 2006-12-06 | 2011-09-06 | Solaredge, Ltd. | Method for distributed power harvesting using DC power sources |
US9112379B2 (en) | 2006-12-06 | 2015-08-18 | Solaredge Technologies Ltd. | Pairing of components in a direct current distributed power generation system |
US8384243B2 (en) | 2007-12-04 | 2013-02-26 | Solaredge Technologies Ltd. | Distributed power harvesting systems using DC power sources |
JP5194458B2 (ja) * | 2007-01-24 | 2013-05-08 | 株式会社明電舎 | 太陽光発電システムの制御方法と太陽光発電システムの発電量予測装置 |
US7920942B2 (en) * | 2007-03-01 | 2011-04-05 | Wisconsin Alumni Research Foundation | Control of combined storage and generation in distributed energy resources |
JP5006104B2 (ja) * | 2007-05-24 | 2012-08-22 | 川崎重工業株式会社 | 電力平滑化方法、電力平滑化装置および同装置の設計方法 |
US7986122B2 (en) * | 2007-09-26 | 2011-07-26 | Enphase Energy, Inc. | Method and apparatus for power conversion with maximum power point tracking and burst mode capability |
US9291696B2 (en) | 2007-12-05 | 2016-03-22 | Solaredge Technologies Ltd. | Photovoltaic system power tracking method |
US8049523B2 (en) | 2007-12-05 | 2011-11-01 | Solaredge Technologies Ltd. | Current sensing on a MOSFET |
EP2232690B1 (en) | 2007-12-05 | 2016-08-31 | Solaredge Technologies Ltd. | Parallel connected inverters |
US11264947B2 (en) | 2007-12-05 | 2022-03-01 | Solaredge Technologies Ltd. | Testing of a photovoltaic panel |
US20090273481A1 (en) * | 2008-01-15 | 2009-11-05 | John Traywick | Solar-Charged Power Source |
EP2722979B1 (en) | 2008-03-24 | 2022-11-30 | Solaredge Technologies Ltd. | Switch mode converter including auxiliary commutation circuit for achieving zero current switching |
JP4535297B2 (ja) * | 2008-03-28 | 2010-09-01 | 三菱自動車工業株式会社 | 車両用発電制御装置 |
US8154892B2 (en) * | 2008-04-02 | 2012-04-10 | Arraypower, Inc. | Method for controlling electrical power |
TW200943668A (en) * | 2008-04-08 | 2009-10-16 | Princeton Technology Corp | Wind power charging device |
EP2294669B8 (en) | 2008-05-05 | 2016-12-07 | Solaredge Technologies Ltd. | Direct current power combiner |
KR100993108B1 (ko) * | 2008-05-30 | 2010-11-08 | 군산대학교산학협력단 | 전력품질개선 및 절전기능을 갖는 계통연계형 태양광발전시스템 |
WO2009155445A2 (en) * | 2008-06-18 | 2009-12-23 | Premium Power Corporation | Integrated renewable energy generation and storage systems and associated methods |
US8098055B2 (en) * | 2008-08-01 | 2012-01-17 | Tigo Energy, Inc. | Step-up converter systems and methods |
WO2010057250A1 (en) * | 2008-11-19 | 2010-05-27 | Solar Systems Pty Ltd | Method and apparatus for managing power output of an electrical power generation system |
DE102009006671B4 (de) | 2009-01-29 | 2015-09-10 | Nordex Energy Gmbh | Verfahren zum Betrieb eines Windparks |
US8482156B2 (en) * | 2009-09-09 | 2013-07-09 | Array Power, Inc. | Three phase power generation from a plurality of direct current sources |
JP2011061992A (ja) * | 2009-09-10 | 2011-03-24 | Panasonic Electric Works Co Ltd | 電力制御システム並びに電気機器 |
JP2011083058A (ja) * | 2009-10-02 | 2011-04-21 | Panasonic Electric Works Co Ltd | 電力供給システムの蓄電池電力供給源監視装置 |
JP5507959B2 (ja) * | 2009-10-26 | 2014-05-28 | パナソニック株式会社 | 売電システム |
WO2011078151A1 (ja) * | 2009-12-24 | 2011-06-30 | 三洋電機株式会社 | 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム |
FR2961039B1 (fr) * | 2010-06-04 | 2012-06-29 | Commissariat Energie Atomique | Circuit convertisseur et systeme electronique comportant un tel circuit |
EP2413449A3 (en) * | 2010-07-30 | 2018-04-25 | Sanyo Electric Co., Ltd. | Air conditioning system |
JP2012039821A (ja) * | 2010-08-10 | 2012-02-23 | Toshiba Corp | 発電システムの電力変動緩和装置および電力変動緩和方法 |
EP2610486B1 (en) * | 2010-08-26 | 2016-08-10 | Mitsubishi Heavy Industries, Ltd. | Wind power generation apparatus and output control method |
JP5101675B2 (ja) * | 2010-09-09 | 2012-12-19 | 株式会社東芝 | 需給バランス制御装置 |
GB2485527B (en) | 2010-11-09 | 2012-12-19 | Solaredge Technologies Ltd | Arc detection and prevention in a power generation system |
US10673229B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
US10230310B2 (en) | 2016-04-05 | 2019-03-12 | Solaredge Technologies Ltd | Safety switch for photovoltaic systems |
US10673222B2 (en) | 2010-11-09 | 2020-06-02 | Solaredge Technologies Ltd. | Arc detection and prevention in a power generation system |
GB2486408A (en) | 2010-12-09 | 2012-06-20 | Solaredge Technologies Ltd | Disconnection of a string carrying direct current |
JP5580183B2 (ja) * | 2010-12-13 | 2014-08-27 | パナソニック株式会社 | 電力制御装置及びそれを用いた電力制御システム |
KR101243909B1 (ko) * | 2010-12-16 | 2013-03-14 | 삼성에스디아이 주식회사 | 전력 저장 시스템 및 그 제어 방법 |
GB2483317B (en) | 2011-01-12 | 2012-08-22 | Solaredge Technologies Ltd | Serially connected inverters |
US8952672B2 (en) | 2011-01-17 | 2015-02-10 | Kent Kernahan | Idealized solar panel |
US8410750B2 (en) * | 2011-04-07 | 2013-04-02 | National Kaohsiung University Of Applied Sciences | Method for solar power energy management with intelligent selection of operating modes |
JP5526079B2 (ja) * | 2011-05-30 | 2014-06-18 | 株式会社日立パワーソリューションズ | 風力発電システムおよび風力発電システムにおける風力発電機増設方法 |
JP5162008B2 (ja) * | 2011-06-14 | 2013-03-13 | 株式会社東芝 | 電源制御方法、電子機器及び電源制御システム |
US9774189B2 (en) * | 2011-07-18 | 2017-09-26 | Enphase Energy, Inc. | Method and apparatus for multi-phase power conversion having modified burst current |
US8570005B2 (en) | 2011-09-12 | 2013-10-29 | Solaredge Technologies Ltd. | Direct current link circuit |
US9112430B2 (en) | 2011-11-03 | 2015-08-18 | Firelake Acquisition Corp. | Direct current to alternating current conversion utilizing intermediate phase modulation |
CN102522769B (zh) * | 2011-12-01 | 2014-03-19 | 北京动力机械研究所 | 宽风速范围的混合励磁风力发电系统 |
CN103178541B (zh) * | 2011-12-26 | 2015-01-21 | 上海电科电器科技有限公司 | 分布式光伏并网发电与储能设备的控制方法 |
GB2498365A (en) | 2012-01-11 | 2013-07-17 | Solaredge Technologies Ltd | Photovoltaic module |
US20150012147A1 (en) * | 2012-01-20 | 2015-01-08 | Energy Aware Technology Inc. | System and method of compiling and organizing power consumption data and converting such data into one or more user actionable formats |
US9853565B2 (en) | 2012-01-30 | 2017-12-26 | Solaredge Technologies Ltd. | Maximized power in a photovoltaic distributed power system |
GB2498791A (en) | 2012-01-30 | 2013-07-31 | Solaredge Technologies Ltd | Photovoltaic panel circuitry |
GB2498790A (en) | 2012-01-30 | 2013-07-31 | Solaredge Technologies Ltd | Maximising power in a photovoltaic distributed power system |
US9007027B2 (en) * | 2012-01-31 | 2015-04-14 | Green Charge Networks Llc | Charge management for energy storage temperature control |
GB2499991A (en) | 2012-03-05 | 2013-09-11 | Solaredge Technologies Ltd | DC link circuit for photovoltaic array |
US10115841B2 (en) | 2012-06-04 | 2018-10-30 | Solaredge Technologies Ltd. | Integrated photovoltaic panel circuitry |
US9941813B2 (en) | 2013-03-14 | 2018-04-10 | Solaredge Technologies Ltd. | High frequency multi-level inverter |
US9548619B2 (en) | 2013-03-14 | 2017-01-17 | Solaredge Technologies Ltd. | Method and apparatus for storing and depleting energy |
EP4318001A3 (en) | 2013-03-15 | 2024-05-01 | Solaredge Technologies Ltd. | Bypass mechanism |
US20150021998A1 (en) * | 2013-07-18 | 2015-01-22 | Solantro Semiconductor Corp. | Stabilized power generation |
CN103441534B (zh) * | 2013-07-23 | 2016-08-10 | 清华大学 | Agc系统中传统机组与储能系统配合的控制策略 |
JP6482170B2 (ja) * | 2013-12-27 | 2019-03-13 | 三菱重工業株式会社 | エネルギ・マネジメント・システム、電力システム、エネルギ管理方法、及びプログラム |
JP6158107B2 (ja) * | 2014-02-06 | 2017-07-05 | 株式会社東芝 | エネルギーマネジメントシステム |
JP2015149839A (ja) * | 2014-02-06 | 2015-08-20 | 株式会社東芝 | エネルギーマネジメントシステム |
US9318974B2 (en) | 2014-03-26 | 2016-04-19 | Solaredge Technologies Ltd. | Multi-level inverter with flying capacitor topology |
CN103944492A (zh) * | 2014-05-08 | 2014-07-23 | 阳光电源股份有限公司 | 一种逆变器及光伏发电系统 |
CN104218611A (zh) * | 2014-09-26 | 2014-12-17 | 苏州同虞新能源科技有限公司 | 分布式光伏并网发电与储能设备的控制方法 |
CN104901325A (zh) * | 2015-05-25 | 2015-09-09 | 东北电力大学 | 基于电价峰谷差的智能家居微网系统 |
JP5838006B1 (ja) * | 2015-06-25 | 2015-12-24 | 東邦エネルギア株式会社 | 配電装置 |
CN105305410B (zh) * | 2015-10-16 | 2017-10-27 | 国网上海市电力公司 | 一种直流配电系统储能装置自适应虚拟阻抗下垂控制方法 |
JP2017093266A (ja) * | 2015-11-17 | 2017-05-25 | 日本ゼオン株式会社 | 充電装置 |
US11177663B2 (en) | 2016-04-05 | 2021-11-16 | Solaredge Technologies Ltd. | Chain of power devices |
US11018623B2 (en) | 2016-04-05 | 2021-05-25 | Solaredge Technologies Ltd. | Safety switch for photovoltaic systems |
JP6705319B2 (ja) * | 2016-07-19 | 2020-06-03 | 住友電気工業株式会社 | 統括制御装置、統括制御システム、統括制御方法および統括制御プログラム |
KR101904846B1 (ko) * | 2016-12-09 | 2018-10-10 | 효성중공업 주식회사 | Ess 최적 효율 운영방법 |
US10985566B2 (en) * | 2018-03-20 | 2021-04-20 | Honda Motor Co., Ltd. | Energy system, energy management server, energy management method, and non-transitory computer readable medium |
US11381090B2 (en) | 2020-10-05 | 2022-07-05 | ATMA Energy, LLC | Systems and methods for dynamic control of distributed energy resource systems |
WO2024074187A1 (en) * | 2022-10-03 | 2024-04-11 | Hitachi Energy Ltd | Arc fault suppression in energy storage systems |
Family Cites Families (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63186538A (ja) | 1987-01-27 | 1988-08-02 | 三菱電機株式会社 | 系統安定化装置 |
JPH0261227A (ja) | 1988-08-25 | 1990-03-01 | Shimizu Corp | 構造物の変形抑制工法 |
JP3271730B2 (ja) | 1994-04-28 | 2002-04-08 | キヤノン株式会社 | 発電システムの充電制御装置 |
US5670833A (en) * | 1994-11-23 | 1997-09-23 | General Signal Power Systems, Inc. | Power transfer method and apparatus for uninterruptible power systems |
JPH08275390A (ja) | 1995-03-29 | 1996-10-18 | Canon Inc | 充放電制御方法、充放電制御装置及び該充放電制御装置を有する発電システム |
JPH0916277A (ja) | 1995-04-24 | 1997-01-17 | Canon Inc | 太陽電池を有する直流電源システムおよびその動作方法 |
JP3541982B2 (ja) * | 1995-05-17 | 2004-07-14 | 株式会社安川電機 | 太陽光発電用電力変換装置の系統過電圧保護方法及び装置 |
JP3382434B2 (ja) | 1995-09-22 | 2003-03-04 | キヤノン株式会社 | 電池電源の電圧制御装置および電圧制御方法 |
JP3368124B2 (ja) | 1995-10-26 | 2003-01-20 | キヤノン株式会社 | 過充電防止回路 |
JPH09258838A (ja) * | 1996-03-27 | 1997-10-03 | Mitsubishi Electric Corp | 太陽光発電システムの最大電力制御方法 |
US5745368A (en) * | 1996-03-29 | 1998-04-28 | Siemens Energy & Automation, Inc. | Method for voltage stability analysis of power systems |
JP3571860B2 (ja) | 1996-08-23 | 2004-09-29 | キヤノン株式会社 | 非安定電源を電源とする電動機運転装置 |
JP3352334B2 (ja) | 1996-08-30 | 2002-12-03 | キヤノン株式会社 | 太陽電池の電力制御装置 |
JP3554116B2 (ja) | 1996-09-06 | 2004-08-18 | キヤノン株式会社 | 電力制御装置及びそれを用いた太陽光発電システム |
JP3565470B2 (ja) * | 1997-06-13 | 2004-09-15 | キヤノン株式会社 | 地絡保護装置並びにその動作方法、これを有した太陽光発電システム及びこれを有した太陽光発電システム用インバータ |
US6067458A (en) * | 1997-07-01 | 2000-05-23 | Qualcomm Incorporated | Method and apparatus for pre-transmission power control using lower rate for high rate communication |
JPH1195849A (ja) * | 1997-09-18 | 1999-04-09 | Canon Inc | 電力変換装置及び太陽光発電装置 |
JP3567812B2 (ja) * | 1999-08-27 | 2004-09-22 | 松下電工株式会社 | 太陽電池の最大電力制御方法 |
JP2001161032A (ja) * | 1999-12-01 | 2001-06-12 | Canon Inc | 系統連系パワーコンディショナ及びそれを用いた発電システム |
JP2001275259A (ja) | 2000-03-29 | 2001-10-05 | Canon Inc | 系統連系インバータおよび分散形発電システム |
JP2002112553A (ja) * | 2000-09-29 | 2002-04-12 | Canon Inc | 電力変換装置およびその制御方法、並びに、発電装置 |
US7733069B2 (en) * | 2000-09-29 | 2010-06-08 | Canon Kabushiki Kaisha | Power converting apparatus and power generating apparatus |
JP2002204531A (ja) | 2000-10-31 | 2002-07-19 | Canon Inc | 交流連系装置およびその制御方法 |
JP2002252986A (ja) | 2001-02-26 | 2002-09-06 | Canon Inc | インバータ、電源システム及び電源システムにおける漏れ電流低減方法 |
EP1311048A3 (en) * | 2001-11-09 | 2005-02-16 | Matsushita Electric Industrial Co., Ltd. | Power controller, power generation system and control method of power controller |
JP3901026B2 (ja) * | 2002-06-12 | 2007-04-04 | 日本電気株式会社 | Cdma受信装置 |
JP2004208494A (ja) * | 2002-12-11 | 2004-07-22 | Canon Inc | 信号発生器の制御方法 |
JP4585774B2 (ja) | 2003-03-07 | 2010-11-24 | キヤノン株式会社 | 電力変換装置および電源装置 |
ATE428207T1 (de) * | 2003-06-21 | 2009-04-15 | Abb Research Ltd | Echtzeit-notfallsteuerung fur energieversorgungssysteme |
JP2005312138A (ja) * | 2004-04-19 | 2005-11-04 | Canon Inc | 電力制御装置、発電システム及び電力系統システム |
JP4604798B2 (ja) * | 2004-05-10 | 2011-01-05 | ソニー株式会社 | 無線通信システム、無線通信装置及び無線通信方法、並びにコンピュータ・プログラム |
US20070273342A1 (en) * | 2006-05-25 | 2007-11-29 | Ebara Corporation | Electric power supply apparatus and method of synchronously operating power converter |
US7430675B2 (en) * | 2007-02-16 | 2008-09-30 | Apple Inc. | Anticipatory power management for battery-powered electronic device |
-
2004
- 2004-04-19 JP JP2004123442A patent/JP2005312138A/ja not_active Withdrawn
-
2005
- 2005-04-06 US US11/099,580 patent/US7456604B2/en not_active Expired - Fee Related
- 2005-04-19 CN CNB2005100652862A patent/CN100380774C/zh not_active Expired - Fee Related
-
2008
- 2008-10-29 US US12/290,138 patent/US7550952B2/en not_active Expired - Fee Related
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101837743A (zh) * | 2009-03-16 | 2010-09-22 | 福特全球技术公司 | 机动车辆 |
CN101837743B (zh) * | 2009-03-16 | 2013-06-26 | 福特全球技术公司 | 机动车辆 |
CN102511117B (zh) * | 2009-09-30 | 2014-04-23 | 三洋电机株式会社 | 充放电控制装置以及发电系统 |
CN102511117A (zh) * | 2009-09-30 | 2012-06-20 | 三洋电机株式会社 | 充放电控制装置以及发电系统 |
CN102687363A (zh) * | 2009-12-22 | 2012-09-19 | 松下电器产业株式会社 | 电力供给系统 |
CN102687363B (zh) * | 2009-12-22 | 2015-07-29 | 松下电器产业株式会社 | 电力供给系统 |
CN102109210B (zh) * | 2009-12-28 | 2013-06-26 | 三洋电机株式会社 | 空调系统 |
CN102109210A (zh) * | 2009-12-28 | 2011-06-29 | 三洋电机株式会社 | 空调系统 |
CN102658780B (zh) * | 2010-11-30 | 2015-04-08 | 本田技研工业株式会社 | 电动车辆中的输出控制装置 |
CN102658780A (zh) * | 2010-11-30 | 2012-09-12 | 本田技研工业株式会社 | 电动车辆中的输出控制装置 |
CN103270665A (zh) * | 2010-12-24 | 2013-08-28 | 日本电气株式会社 | 电力控制系统及其电力控制方法以及电力网关装置及其电力控制方法 |
US9467007B2 (en) | 2010-12-24 | 2016-10-11 | Nec Corporation | Power control system and power control method therefor, and power gateway apparatus and power control method therefor |
CN102684185A (zh) * | 2011-01-18 | 2012-09-19 | 西门子公司 | 对由风力发电场生成的电功率的分发的控制 |
US9041248B2 (en) | 2011-01-18 | 2015-05-26 | Siemens Aktiengesellschaft | Control of the distribution of electric power generated by a wind farm between an AC power transmission link and a DC power transmission link |
CN102684185B (zh) * | 2011-01-18 | 2016-12-14 | 西门子公司 | 用于对由风力发电场生成的电功率的分发的控制的系统和方法 |
CN102545365A (zh) * | 2011-12-30 | 2012-07-04 | 华为技术有限公司 | 一种发电机控制方法及装置、通信基站 |
CN102545365B (zh) * | 2011-12-30 | 2015-07-29 | 华为技术有限公司 | 一种发电机控制方法及装置、通信基站 |
CN104170201A (zh) * | 2012-02-16 | 2014-11-26 | 株式会社日立制作所 | 电力系统的运用方法、运用装置以及蓄电池管理装置 |
CN102624018A (zh) * | 2012-03-31 | 2012-08-01 | 东北大学 | 分布式混合供电型智能电网系统及控制方法 |
CN103683848A (zh) * | 2012-09-19 | 2014-03-26 | 株式会社东芝 | 电源系统和电源控制器 |
CN104638650A (zh) * | 2015-01-14 | 2015-05-20 | 国家电网公司 | 一种利用原动机输出转矩控制发电机频率的方法 |
CN104638650B (zh) * | 2015-01-14 | 2016-08-31 | 国家电网公司 | 一种利用原动机输出转矩控制发电机频率的方法 |
CN105471070A (zh) * | 2015-11-09 | 2016-04-06 | 李哲 | 分布式光伏发电电量分配系统和方法 |
CN107123995A (zh) * | 2016-02-25 | 2017-09-01 | 台达电子企业管理(上海)有限公司 | 电力系统及其控制方法 |
US10411474B2 (en) | 2016-02-25 | 2019-09-10 | Delta Electronics (Shanghai) Co., Ltd. | Electric power system and control method thereof |
CN107123995B (zh) * | 2016-02-25 | 2020-03-31 | 台达电子企业管理(上海)有限公司 | 电力系统及其控制方法 |
Also Published As
Publication number | Publication date |
---|---|
US20090069950A1 (en) | 2009-03-12 |
US7550952B2 (en) | 2009-06-23 |
CN100380774C (zh) | 2008-04-09 |
JP2005312138A (ja) | 2005-11-04 |
US20050234599A1 (en) | 2005-10-20 |
US7456604B2 (en) | 2008-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1691464A (zh) | 功率控制装置、发电系统以及电力网系统 | |
US9853452B2 (en) | Power control apparatus, power control method, program, and energy management system | |
CN1949624A (zh) | 太阳能电源系统的最大功率追踪方法和太阳能电源装置 | |
JP7301997B2 (ja) | 最適化器、太陽光発電システム、及び太陽電池モジュールのためのiv曲線スキャニング方法 | |
KR101245647B1 (ko) | 태양광발전시스템과의 연계를 통한 배터리 급속 충전 시스템 | |
CN103986190A (zh) | 基于发电功率曲线的风光储联合发电系统平滑控制方法 | |
WO2011078151A1 (ja) | 電力供給方法、コンピュータ読み取り可能な記録媒体および発電システム | |
JP6234530B2 (ja) | 電力管理システム | |
JP5541982B2 (ja) | 直流配電システム | |
CN108448632B (zh) | 计及储能荷电状态循环的交直流微网日内滚动优化调度方法 | |
CN105680771B (zh) | 一种风光互补发电系统及控制方法 | |
WO2015001800A1 (ja) | マイクログリッドの制御装置及びその制御方法 | |
JP2013102576A (ja) | 充電制御システム、充電制御装置、充電制御方法および放電制御装置 | |
CN110867873A (zh) | 一种远洋孤岛微电网频率控制方法 | |
CN107492910B (zh) | 一种含柴储的离网微电网自适应控制与主电源切换方法 | |
WO2016117236A1 (ja) | 発電システム、発電制御方法およびプログラム | |
JP2010259303A (ja) | 分散発電システム | |
JP5874038B2 (ja) | 電力供給システム | |
KR100866097B1 (ko) | 계통연계형 태양광 발전시스템 및 그 운용방법 | |
CN106159980B (zh) | 发电系统和能量管理方法 | |
CN111489009A (zh) | 一种电动汽车充电站运行方式的优化计算方法及装置 | |
JP2013537027A (ja) | 電池を充電するための方法 | |
CN1731614A (zh) | 燃料电池系统 | |
US8305030B2 (en) | Classified solar charging method | |
CN103515980A (zh) | 含地源热泵的微电网能量管理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080409 Termination date: 20140419 |