APR Energy PLC, formerly Horizon Acquisition Company plc, offers temporary power solutions on a fast-track basis to utility and industrial customers worldwide. The Company�s fleet of deployable turnkey power plants can be utilized for applications, including supplemental base-load capacity, disaster relief, seasonal peak shaving, or unscheduled outages. The average duration of its contracts is between 12 and 18 months. During a contract it provides turnkey suites of logistics, engineering, installation, operational and maintenance services. APR has a diverse fleet of both reciprocating diesel and natural gas generators, as well as advanced mobile dual-fuel turbine units. Its solutions include distributed generation, peak shaving, and grid stability and support. In June 13, 2011, the Company through its subsidiary, APR Energy Holding Limited acquired APR Energy Cayman Limited and membership interests of Falconbridge Services, LLC.